| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.8 LAccepted-AOC | ₹56.8 L | L1 | Accepted-AOC L1 tenderer |
| 2 | L2₹58.3 L+₹1.4 L (2.55%)Rejected-Finance | ₹58.3 L+₹1.4 L (2.55%) | L2 | Rejected-Finance L2 tenderer |
| 3 | L3₹68.7 L+₹11.9 L (20.9%)Rejected-Finance BARMER | RAJASTHAN | 344001 | ₹68.7 L+₹11.9 L (20.9%) | L3 | Rejected-Finance L3 tenderer |
Tender Value
₹59.1 L
EMD Value
₹1.2 L
Closing Date
4 Aug 2023, 3:00 pmClosed
The Project Director DRDA Chengalpattu
O/o The Project Director DRDA Chengalpattu
Periodic Renewal of BT and 5 years Maintenance of Vedanthangal to Sukkan Kollai road Km 0 0 to 3 050 in Acharapakkam Panchayat Union Having PKG No.TN3405R
2023_RDTN_126603_1
DIPR/3802/TENDER/2023 dt 20.07.2023
Open Tender
Civil Works - Roads
Item Rate
120 days
Acharapakkam Block
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.2 L
O/o The Project Director DRDA Chengalpattu
20 Jan 2024
21 Jul 2023
4 Aug 2023
21 Jul 2023
4 Aug 2023
21 Jul 2023
26 Jul 2023
Amount
Clearing Scrub Jungle including all labour charges for burrying and burning etc.,
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay , stiff black cotton, hard red earth, shales, murram, gravel , stoney earth and earth mixed with small size boulders SS.20.A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of 50mm using 45 mm IRC size HBG Metal with 44 Kg of Bitumen for 1cum metal mixed in hot mix plant laying at site.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of 25mm using 13.20 mm IRC size HBG Metal with 44 Kg of Bitumen for 1cum metal mixed in hot mix plant laying at site.
Applying tack coat over the wornout BT surface using 2.5-3.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc. complete as per clause 503 of MOST specification. km 0/0 -2/20
Providing and laying Bitumenus Concrete 25mm thick using using 0.24cum of 13.2mm, 0.76 cum of 11.20mm , 6.7,6,5.6&4.75 mm 0.66 cum and 2.36 mm 0.34 cum of metal for mixing of Bitumen per 1 cum including cost and conveyance to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete PAVER FINISHER
Filling with US Gravel for side berms including cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @250gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level uniform and free form streaks and holes etc complete as per MORT&H specification no.803
Supplying and fixing of KM stone of size 1.65 x 0.45 x 0.15m
Supplying and fixing of HM stone of size 0.75x 0.23x 0.10m
Providing and construction of rumble strips with premix carpet 15-20mm at centre 250mm wide placed at 1m centre to centre at approved locations to central speed.
Provision for sign board charges
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km
For 1st year
For 2nd year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SSK CONSTRUCTION
Balaji Enterprises
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .