Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance | -41.51% | ₹2.8 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 LAdmitted-Finance | -38.11% | ₹3.0 L | L2 | Admitted-Finance |
| 3 | L3₹3.0 LAdmitted-Finance | -37.86% | ₹3.0 L | L3 | Admitted-Finance |
| 4 | L4₹3.2 LAdmitted-Finance | -35.10% | ₹3.2 L | L4 | Admitted-Finance |
| 5 | L5₹3.2 LAdmitted-Finance | -33.20% | ₹3.2 L | L5 | Admitted-Finance |
Tender Value
₹4.9 L
EMD Value
₹9,720
Closing Date
7 Feb 2026, 6:00 pmClosed
ER FAYAZ AHMED SHEIKH
XEN REW OFFICE RAMBAN
AS PER NIT
2026_RDPR_302047_1
NIT No 90 OF REW RAMBAN OF 2025-2026 BLOCK KHARI RAJGARH
Open Tender
Civil Works
30 days
RAMBAN
AS PER NIT
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹9,720
9 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
7 Feb 2026
2 Feb 2026
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil :
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m- in width as well as10 sqm on plan including disposal of excavated earth. lead upto 50 meter and lift upto 1.5m, as directed by Engineer-in-Charge.All kinds of soil in surface .
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:3:6 mix (20 mm nominal size of graded stone Aggregate) excluding 30% Boulders.
Dry random rubble masonry with hard stone in foundation and plinth:Without bond stone
Centering and Shuttering including strutting proping and Removal of form work for foundation,footing base of columns etc for mass concreting.
Carriage of Cement
Carriage of Sand
Carriage of Aggregates
Carriage of Stones
CIB (citizen information Board)complete job) Made of Granite.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.50 MB
BOQ_979996.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid