Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.6 L
EMD Value
₹9,200
Closing Date
6 Jul 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
As per relevant NIT
As per relevant NIT
Construction of plinth around the park at Hyderpora Srinagar
2020_FLOD_98949_2
ENIT No 08 of 2020-21
Open Tender
Civil Works
Item Wise
15 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
As per relevant NIT
₹9,200
7 Jul 2020
25 Jun 2020
7 Jul 2020
25 Jun 2020
6 Jul 2020
26 Jun 2020
120 days
Amount
Earh work in excavation by manaul means in trenches for foundation & like not exceeding 10 sqm on plan, depth upto 1.5 mtr including disposal of excavated earth upto to 1 mtr from cutting edge disposed earth is to be levelled and neatly dressed in all kinds of soil including dewatering.
P/L of stone soling hand packed tightly including watering & ramming with all leads & lifts upto site of work complete
P/L in position of cement concrete of specified grade excluding cost of centering & shuttering at work upto plinth level in 1:4:8 mix (1 cement:4 coarse sand : 8 graded stone aggrate) 40 mm nominal size crushed stone including all carriage upto site of work
P/L in position of cement concrete of specified grade excluding cost of centering & shuttering at work upto plinth level in 1:3:6 mix (1 cement:3 coarse sand :6 graded stone aggrate) 20 mm nominal size crushed stone including all carriage upto site of work
Centring & shuttering including strutting propping etc & removal of form work four foundation, footings, bases of coloums etc. complete job
Structural steel work welded in built up section, trusses & framed work including cutting, hoisting & fixing in position & applying a priming coat of approved steel primer including all carriage as involved at the source to site of work complete.
Site clearence by way of cutting of bushes removal of rubbish etc. and disposal of the same out of site by manual/mechanical means of transport.
PARVEZ AHMAD GANAI
M/S IRFAN RASHID DALKAW
ABDUL MAJEED WANI
SHEIKH MOHAMMAD LATIEF
stage.html
html • 0.03 MB
finance_188194.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .