| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.2 LAdmitted-Finance | -38.50% | ₹7.2 L | L1 | Admitted-Finance |
| 2 | L2₹7.2 LAdmitted-Finance | -38.10% | ₹7.2 L | L2 | Admitted-Finance |
| 3 | L3₹7.4 LAdmitted-Finance | -36.79% | ₹7.4 L | L3 | Admitted-Finance |
| 4 | L4₹7.7 LAdmitted-Finance R O TAKSHI | LEH | LEH | LADAKH | -33.65% | ₹7.7 L | L4 | Admitted-Finance |
| 5 | L5₹7.8 LAdmitted-Finance | -32.70% | ₹7.8 L | L5 | Admitted-Finance |
Tender Value
₹11.6 L
EMD Value
₹23,280
Closing Date
4 Mar 2026, 4:00 pmClosed
Executive Engineer PWD Rnb division Leh
Office of the Executive Engineer PWD Rnb division Leh
Construction of footpath in Shenam Skara ( near Goba house and hotel mandala ) Under Capex
2026_PWD_18470_1
E Tender 196 of R and B Division Leh
Open Tender
Civil Works - Others
55 days
Leh
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
Office of the Executive Engineer Rnb division Leh
₹23,280
7 Mar 2026
11 Feb 2026
6 Mar 2026
11 Feb 2026
4 Mar 2026
11 Feb 2026
Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Dumping sotnes in horizontal level including cost of stones in horizontal level.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:1½:3 (1 cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting,
Providing and laying 80mm thick faciory made cement in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid joints with line sand etc. all complete as per the direction of Engineer-in-charge.
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns
Carrage of material form source to site by mechanical transport Cement lead=3 km
Sand + bajari lead=25 km
Stone lead = 30 km
Earth / rubbish disposal= 5km
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_44380.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid