| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.7 CrAdmitted-Finance | -8.01% | ₹5.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.9 Cr+₹15.0 L (2.62%)Admitted-Finance | -5.60% | ₹5.9 Cr+₹15.0 L (2.62%) | L2 | Admitted-Finance |
| 3 | L3₹6.0 Cr+₹30.6 L (5.33%)Admitted-Finance | -3.11% | ₹6.0 Cr+₹30.6 L (5.33%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Non-Responsive |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹6.3 Cr
EMD Value
₹12.6 L
Closing Date
19 Nov 2025, 6:00 pmClosed
Chief Engineer
Chief Engineer, Medical and Health, Jaipur
Construction of New CHC Building at Bargaon (Raniwada) District Jalore (Internal Electrical work) (NABARD-31)
2025_MEDIC_511444_3
NIT No 22/2025-26 CE M and H Jaipur
Open Tender
Civil Works
Percentage
365 days
Bargaon
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
As per NIT
₹12.6 L
1 Dec 2025
5 Nov 2025
20 Nov 2025
5 Nov 2025
19 Nov 2025
5 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART A Civil works (CHC Building, 2 Nos MO Qtrs & 2 Nos PMS Qtrs) :- Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 4,850 | Sqm. | 5 | ₹24,250 |
| 2 | Supplying chemical emulsion in sealed containers including delivery as specified.
Chlorpyriphos/Lindane emulsifiable concentrate of 20% | 530 | litre | 243 | ₹1,28,790 |
| 3 | Diluting and injection Chloropyrifos Emulsifiable concentrate 20% with 1% concentration for PRE-CONSTRUCTIONAL Anti termite treatment as per IS 6313 part III as amended from time to time and creating a continuous chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of wall and floor along the external perimeter of building expansion joints, over the top surface of consolidated earth of which aproch is to be laid surrounding of pipes and conduits etc. complete as per specification (Plinth floor area only shall be measured for payment and excluding the cost of chemical emulsion) | 1,177 | Sqm | 47 | ₹55,319 |
| 4 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 2,199 | Cum | 178 | ₹3,91,422 |
| 5 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 551 | Cum | 3,302 | ₹18,19,402 |
| 6 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 912 | Cum | 2,838 | ₹25,88,256 |
| 7 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 202 | Cum | 3,479 | ₹7,02,758 |
| 8 | Add extra for facing as per design and detailed specifications including additional cost of stones: Course rubble facing Second sort. | 1,062.94 | sqm | 491 | ₹5,21,903.54 |
| 9 | Add extra for facing as per design and detailed specifications including additional cost of stones Course rubble facing First sort. | 440 | sqm | 618 | ₹2,71,920 |
| 10 | Add extra for rock facing using Jodhpur white sand stone with porper projection and chiesel dressing of edges of stone 2 line dressing for building corners,jambs including uniform joints. | 440 | sqm | 290 | ₹1,27,600 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.03 MB
Tendernotice_2.pdf
PDF • 4.76 MB
FinalBidDocumentBargaon.pdf
Tender Documents • 0.63 MB
BOQ_911387.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .