Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance COAL ROAD PTPS PATRATU | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical not submitted all documents as per PQC. |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
20 Mar 2021, 1:00 pmClosed
SUPERINTENDING ENGINEER
office of the superintending engineer, OandMC-II, dtps
Dismantling, Overhauling and Installation of HAYWARD TYLER MAKE Boiler Circulation Pump and its Motor Assembly of Unit No.7 of 2x500 MW, DTPS, Anpara..
2021_RVUNL_561556_1
T11/BMD-1/OH/U7/DTPP/2020-2021
Open Tender
Power/Energy Projects/Products
Fixed-rate
35 days
DTPS, ANPARA.
tender cost, earnest money and validity agreement
2 documents required · 2 mandatory
₹1,180
Dy GM CFA and BO DTPS, Anpara
₹20,000
26 Apr 2021
2 Mar 2021
22 Mar 2021
2 Mar 2021
20 Mar 2021
2 Mar 2021
Amount
:“Dismantling, Overhauling & Installation of HAYWARD TYLER MAKE Boiler Circulation Pump and its Motor Assembly of Unit No.7” of 2x500 MW, DTPS, Anpara.
K S ENGINEERING
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .