Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹16,500
Closing Date
14 Aug 2025, 9:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Public Works Department
Laxman AEE
Shifting of HT/LT line in the Work of Widening and Improvement to Sirisi Hosanagara SH-77 From Ch.37.05 to 37.60 ,39.90 to 40.25,42.70 to 43.70 and 57.05 to 57.60 Km in Soraba Taluk (Working Chainage-Ch. 37.05 to 37.60, 39.90 to 40.25, 42.70 to 43.60 and 57.05 to 57.60 km)
PWD/2025-26/EL/WORK_INDENT21901
PWD/2025-26/EL/WORK_INDENT21901
Open
Electrical
Two Tender Document System(Two Cover)
PWD Electrical Division Office Bengaluru
6 documents required · 6 mandatory
3.2To qualify for award of this contract, each tenderer in its name should have in the last Five years i.e. 2020-21 to 2024-25.b) Satisfactorily completed (at least 50% of the contract value), as prime contractor, at least one similar work i.e., Shifting of HT / LT Lines Works of value not less than Rs 3.08 Lakhs in a single work.
The tenderer as a Prime Contractor having valid Class-3 & above Electrical License issued by Electrical Inspectorate Govt. of Karnataka and should have suitable technical, financial & managerial capabilities.
3.6Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under/ Assessed available tender capacity - (AxNx2.5-B) Where, A-Maximum value of construction works executed in any one year during the last five years (updated 2025-26 price level) taking into account the completed as well as works in progress. N Number of years prescribed for completion of the works for which tenders are invited. 0.50 Years (06 Months) B - Value, at 2025-26 price level, of existing commitments and on-going works to be completed during the next. 0.50 Years (06 Months) (period of completion of the works for which Tenders are invited) Note: The statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the Employer in charge, not below the rank of an Executive Engineer or equivalent.
The Tenderer must submit ongoing and existing commitments details separately.
The Tenderer must have submitted the Certification of registration in the Labour department with the latest renewal.
The Bidders shall deposit E.M.D of Rs. 16,500/- through any e-payment mode.
3.2To qualify for award of this contract, each Tenderer in its name should have during last five years i.e., from 2020-21 to 2024-25.a) The tenders must have achieved in at least two financial years an average annual financial turnover of an amount Not less than Rs.6.16 Lakhs during last five years. with UDIN Number certified by Chartered Accountant, If Failed to Satisfy the condition tender will be rejected Note: The returns submitted to the I.T. along with the Profit and Loss account statement, Balance sheet should be uploaded for the financial turnover criteria.
₹500
₹16,500
31 Jul 2025
31 Jul 2025
16 Aug 2025
5 Aug 2025
Sub Estimate for Shifting of HT/LT line in the Work of Widening and Improvement to Sirisi Hosanagara SH-77 From Ch.37.05 to 37.60 ,39.90 to 40.25,42.70 to 43.70 and 57.05 to 57.60 Km in Soraba Taluk (Working Chainage-Ch. 37.05 to 37.60, 39.90 to 40.25, 42.70 to 43.60 and 57.05 to 57.60 km)
Supply & Erection of PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No.BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards including Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC...
Supply & Erection of RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. BESCOM/GM/QS&S/02 Dtd 24.11.2018) as per IS-785including DDigging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC s...
Supply & providing of 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole (C,D.S Pg No 341/635 I .No 9.(a)) (Material + Labour ) ---- Items of work...
LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS) For PSCC Pole 140 KG WL (C,D.S Pg No 342/635 I .No 13.(b) (Material + Labour ) ---- Items of work are including cost and convey a...
Supply & Providing of 11 kV, 45 kN Polymeric Insulator (Item no 6.10 page no 5 of 81) (Material ) ---- Items of work are including cost and convey ance of all materials, labour charges for all items o...
DP Set (2 Pole Strucrure Kit) as per IS1977
For RCC Pole - 9 Mtr Long, 145KG WL/PSCC Pole - 9 Mtr Long, 300Kg WL - MS (Dwg No. BESCOM/GM/QS&S/35 & 63 Dtd ---- Items of work are including cost and conv...
Providing & Fixing the 11 kV, 200 Amps, Single Break GOS (C,D.S-24 Pg No 371/635 Sl.no 16 ) (Material + Labour ) ---- Items of work are including cost and convey ance of all materials, labour charges ...
Supply & stringing of Rabbit ACSR (6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM and Stringing of Conductor for Rabbit ACSR (Material + Labour ) ---- Items of work are including cost and convey ance...
Providing the No. 8 Strain Insulator ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloading and HOM ...
Providing the 1.1 kV Ceramic Pin Insulator (Shell only) ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and...
a) Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading. 9 Mtr RCC/PSCC Pole ---- Items of work are...
Releasing and Restringing of ACSR Rabbit conductor ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unlo...
Releasing of RCC Pole -9 Mtr Long, 145 Kg WL ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloading ...
Releasing of RCC Pole - 8 Mtr Long, 115 Kg WL ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloading...
Releasing of V-Shape/Horizontal cross arm for DC Line including Brace and Insulator fixing. (Without Single Top Support ) ---- Items of work are including cost and convey ance of all materials, labour...
Providing the Double Pole TC Set for erection of
Transformer on RCC/PSCC 9 Mtr Long
Poles as per IS-1977 For 25/63/100 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr Long, 145 Kg WL - MS & Erectio...
GI Wire 8 SWG ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloading and HOM of machineries etc., co...
Earthing materials pipe type for grounding (Single
Electrode with accessories) ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lea...
Releasing of 100 kVA on the existing 9 Mtr RCC Pole (Squre Section) (excluding erection of Pole) ---- Items of work are including cost and convey ance of all materials, labour charges for all items of...
11 kV Lightning Arrester, Metal oxide, 10 kV, 5 kA Polymeric Type with ground disconnector ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work ...
Providing the LT Protection Kit (Dwg No. BESCOM/GM/QS&S/10 Dtd 24.11.2018) Fixing of LT Protection Kit ---- Items of work are including cost and convey ance of all materials, labour charges for all it...
11 kV, HG Fuse Unit with Solid Core Insulator
(Dwg No. BESCOM/GM/QS&S/21 Dtd 24.11.2018)Fixing DOLO Cutout/Horn Gap Fuse including fixing of cross arm and wiring ---- Items of work are including cost ...
Releasing of LT Protection Kit ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloading and HOM of mac...
LT 3 Phase 4 Wire 5-30 Amps Thread Through Type
composite Meter Housing Box consisting of ETV Meter
with AMR comply and LTCT with built in GSM/GPRS
Modem (as per technical specification) upto 100 kVA
Supply & Providing of 11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work wit...
Providing & Fixing the H-Frame for mounting GOS ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloadi...
Supply & Providing Guy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07 ---- Items of work are including cost and convey ance of all materials, labour...
Providing the 1.1 kV GI Pin for 1.1 kV Ceramic Shell Insulator ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, load...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KPPP kw-1 bid 21901.doc
Tender Document • 1.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .