| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC | ₹12.8 L Quoted ₹19.7 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹21.3 LRejected-AOC | ₹21.3 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M/s. KSR Enterprises L2 | M/S.KSM Engineering L1 |
|---|---|---|---|---|---|
| 1.00 | Opening of all manhole doors, and closing manhole doors after completion work including changing of asbestos ropes and clamps in the doors. Including cost of consumables and T&P's. | 12 | Nos | 900 ₹10,800 | 750 ₹9,000 |
| 2.00 | Removal of ash deposit around guide bearing area, and inside the APH. Including cost of consumables and T&P's. | 12 | Nos | 7,600 ₹91,200 | 7,000 ₹84,000 |
| 3.00 | Charges for leveling and aligning of the radial sector plates and axial seal plates with respect to the rotor axis. Including cost of consumables and T&P's. | 8 | Nos | 8,800 ₹70,400 | 8,000 ₹64,000 |
| 4.00 | Charges for fixing up straight edge after finding the low point of sector plate, adjusting the radial seals to correct clearance and clamping the seals in both hot end and cold end of APH.(SINGLE SEALING and Double Sealing ARRANGEMENT). Including cost of consumables and T&P's. | 8 | Nos | 25,000 ₹2 L | 23,500 ₹1.9 L |
| 5.00 | Charges for dismantling of Air motors/inspection and renewal of internals, vanes, bearings and reassembling works. Including cost of consumables and T&P's. | 6 | Nos | 6,300 ₹37,800 | 5,000 ₹30,000 |
| 6.00 | Inspection replacing the worn out over running clutch and related works. This work involves disconnecting the Bibby resilient coupling, removing the over running clutch and its extension shaft. Replacing the worn-out over running clutch, extension shaft. Checking and correction of alignment of the Bibby resilient coupling. Including cost of consumables and T&P's. | 8 | Nos | 22,200 ₹1.8 L | 21,500 ₹1.7 L |
| 7.00 | APH – Inspection – Replacing the worn out fluid coupling of the speed reducer. This work involves disconnecting the runner half coupling, renewing the new fluid coupling or replacing the same coupling after rectification and checking the alignment and trial run. Including cost of consumables and T&P's. | 8 | Nos | 49,100 ₹3.9 L | 48,000 ₹3.8 L |
| 8.00 | Charges for dismantling cleaning of lub oil cooler nest and filter. Including cost of consumables and T&P's. | 6 | Nos | 13,800 ₹82,800 | 13,000 ₹78,000 |
| 9.00 | Charges for assembling of lub oil cooler nest and filters. Including cost of consumables and T&P's. | 6 | Nos | 8,000 ₹48,000 | 7,500 ₹45,000 |
| 10.00 | Overhauling of APH lub oil pumps and valves for Support bearing and guide bearing. This work includes Dismantling, cleaning, Inspection of bearings, Gears, internals and replacement of the same if required then reassembling and alignment works etc. Including cost of consumables and T&P's. | 5 | Nos | 13,800 ₹69,000 | 13,500 ₹67,500 |
Tender Value
Refer Docs
EMD Value
₹15,400
Closing Date
25 Mar 2025, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI Circle AMC 25 26 BM Dn Unit I II III Attending breakdown maintenance works in APHs all lub oil system for a period of one year from 01 04 25 to 31 03 26
2025_EB_534035_1
CE SE MI NCTPS I 272 24 25
Open Tender
Power/Energy Projects/Products
365 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,400
Yes
9 Apr 2026
20 Mar 2025
26 Mar 2025
20 Mar 2025
25 Mar 2025
20 Mar 2025
Amount
Opening of all manhole doors, and closing manhole doors after completion work including changing of asbestos ropes and clamps in the doors. Including cost of consumables and T&P's.
Removal of ash deposit around guide bearing area, and inside the APH. Including cost of consumables and T&P's.
Charges for leveling and aligning of the radial sector plates and axial seal plates with respect to the rotor axis. Including cost of consumables and T&P's.
Charges for fixing up straight edge after finding the low point of sector plate, adjusting the radial seals to correct clearance and clamping the seals in both hot end and cold end of APH.(SINGLE SEALING and Double Sealing ARRANGEMENT). Including cost of consumables and T&P's.
Charges for dismantling of Air motors/inspection and renewal of internals, vanes, bearings and reassembling works. Including cost of consumables and T&P's.
Inspection replacing the worn out over running clutch and related works. This work involves disconnecting the Bibby resilient coupling, removing the over running clutch and its extension shaft. Replacing the worn-out over running clutch, extension shaft. Checking and correction of alignment of the Bibby resilient coupling. Including cost of consumables and T&P's.
APH – Inspection – Replacing the worn out fluid coupling of the speed reducer. This work involves disconnecting the runner half coupling, renewing the new fluid coupling or replacing the same coupling after rectification and checking the alignment and trial run. Including cost of consumables and T&P's.
Charges for dismantling cleaning of lub oil cooler nest and filter. Including cost of consumables and T&P's.
Charges for assembling of lub oil cooler nest and filters. Including cost of consumables and T&P's.
Overhauling of APH lub oil pumps and valves for Support bearing and guide bearing. This work includes Dismantling, cleaning, Inspection of bearings, Gears, internals and replacement of the same if required then reassembling and alignment works etc. Including cost of consumables and T&P's.
Changing of worn-out / damaged resilient plate and fixing of new/reconditioned resilient plate. Including cost of consumables and T&P's.
Removing the worn-out mechanic oil seals from APH Guide bearing & APH support bearing Lop’s works involves, removing the pipe line joints, pump spacer, coupling & pump shaft of the pump and changing the mechanic oil seals and reassembling. Including cost of consumables and T&P's.
Cleaning of APH equipments such as Guide bearing assembly,Main drive gear box assembly ,Support bearing assembly and LOPs. Including cost of consumables and T&P's.
Charges for removing the cover of support bearing, draining of lubricating oil from the sump, cleaning, flushing, rinsing and inspection of bearings checking level and refilling with new oil/old and re packing the covers properly. Including cost of consumables and T&P's.
Changing of Inspection of APH speed reducer internals &inspecting the lubricating oil for foreign material contamination and renewing the oil if necessary. Including cost of consumables and T&P's.
Charges for machining the half coupling such as boring and cutting keyway to suit the Air pre heater Main drive gear box input shaft including cost of consumables and T&P's.
Cutting & removing of leaking /worn out swivel joint of APH soot blowers top & bottom, cutting of corroded bolts, assembling of new swivel joint/ reconditioned and providing gaskets and fixing. Including cost of consumables and T&P's.
Decoupling of APH top & bottom soot blower gear box and lowering to ‘0”mtr and assembling of new / overhauling of gear box, positioning, aligning and coupling the gear box. Including cost of consumables and T&P's
M/s. KSR Enterprises (BID ID -1277390)
stage.html
html • 0.04 MB
techsummary_635707.pdf
BOQ Comparative Chart
xlsx
finsummary_635707.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_635707.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid