| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.6 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹79.3 L+₹1.6 L (2.09%)Rejected-Finance | L2 | Rejected-Finance Rejected Being Higher Rates | |
| 3 | L3₹82.5 L+₹4.9 L (6.30%)Rejected-Finance | L3 | Rejected-Finance Rejected Being Higher Rates | |
| 4 | L4₹87.1 L+₹9.4 L (12.1%)Rejected-Finance 01 SANT KABIR NAGAR BADHYALALA PACHWA SANTKABIR NAGAR SANT KABIR NAGAR BASTI UTTAR PRADESH 272125 | SANT KABEER NAGAR | UTTAR PRADESH | 272125 | L4 | Rejected-Finance Rejected Being Higher Rates | |
| 5 | L5₹97.3 L+₹19.6 L (25.3%)Rejected-Finance LOWER GR FLOOR SHOP NO 2 JEEVAN PLAZA VIPUL KHAND 2 GOMTI NAGAR LUCKNOW U P | LUCKNOW | UTTAR PRADESH | 226001 | L5 | Rejected-Finance Rejected Being Higher Rates |
Tender Value
₹1.3 Cr
EMD Value
₹8.5 L
Closing Date
25 Nov 2025, 12:00 pmClosed
SE Lucknow Circle PWD Lucknow
Office of the SE Lucknow Circle PWD Lucknow
Improvement work at Cinepolis Underpass Black Spot on NH-27 Old NH-56A and B Shaheedpath Lucknow Bypass - Civil Work
2025_CEUCZ_1092233_5
6611/523 C (PDL) - Lko.Cir./2025-26 dated 12.11.2025
Open Tender
Civil Works - Roads
Percentage
60 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹8.5 L
Office of the SE Lucknow Circle PWD Lucknow
19 Jan 2026
20 Nov 2025
25 Nov 2025
20 Nov 2025
25 Nov 2025
20 Nov 2025
20 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing Brick work Manually/ by mechanical means Including Stacking of Serviceable material and disposal of unseviceable material within 50 metres lead as per direction of Engineer -in-charge.Cement Mortar CH-17 LKO 39th cir. SOR | 95 | Cum | 710 | ₹67,450 |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge AS Per DSR Ch 15.3 | 10 | Cum | 1,230 | ₹12,300 |
| 3 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 3,150 | sqm | 40 | ₹1,26,000 |
| 4 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 By Mechanical Means Bituminous Courses MORD-202 (2.14) CH-25 LKO SOR 2020-21 | 2.5 | Cum | 280 | ₹700 |
| 5 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 By Mechanical Means Granular Courses MORD-202 (2.14) CH-25 LKO SOR 2020-21 | 10 | Cum | 500 | ₹5,000 |
| 6 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge.
Note item to be applicable in urban areas having directions for restricted hours for movement/ plying of load-carrying motor vehicle of 3.5 cum or more. DAR 1.1.18 SOR CH-25 LKO SOR 2020-21 | 350 | Cum | 220 | ₹77,000 |
| 7 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the as per SOR CH-07 LKO SOR 2020-21 Item No. 2.8.1 | 1,200 | Cum | 180 | ₹2,16,000 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level
1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm
nominal size) | 15 | Cum | 6,140 | ₹92,100 |
| 9 | Brick work with common burnt clay (non modular) bricks of class -150 in superstructure above plinth level up to floor V level in all shapes and sizes in ::
Cement mortar 1:4 (1 cement : 4 coarse sand) as per SOR Ch 9 6.4.1 | 50 | Cum | 6,940 | ₹3,47,000 |
| 10 | Providing and laying cement concrete in retaining walls, return walls, walls (anythickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor
blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:1½:3 (1 cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm (nominal size). | 11 | Cum | 7,815 | ₹85,965 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
T2_6611.pdf
Tender Documents • 3.62 MB
BOQ_2006737.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .