Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.3 LAccepted-AOC PLOT NO 35 ARVIND NAGAR CHANDRAPUR MAHARASHTRA 442401 INDIA | CHANDRAPUR | MAHARASHTRA | 442401 | ₹79.3 L Quoted ₹82.5 L | L1 | Accepted-AOC L1 stood |
| 2 | L2₹1.4 Cr+₹59.8 L (72.5%)Rejected-AOC B 87 B 67 PRAGATI NAGAR NTPC COLONY P O JAMNIPALLI KORBA NTPC COLONY P O JAMNIPALLI KORBA CHHATTISGARH 495450 | KORBA | CHHATTISGARH | 495450 | ₹1.4 Cr+₹59.8 L (72.5%) | L2 | Rejected-AOC L2 stood |
| 3 | L3₹1.5 Cr+₹63.6 L (77.1%)Rejected-Finance | ₹1.5 Cr+₹63.6 L (77.1%) | L3 | Rejected-Finance L3 stood |
| 4 | Rejected-Technical C 85 SECTOR 63 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | - | - | Rejected-Technical due to wrongly taken EMD exemption |
| Sl No | Description | Qty | Unit | ADORE CONTRACTORS PRIVATE LIMITED L1 | REETA ENGINEERING WORKS L3 | Bhavana Energy Infrastructure Pvt. Ltd. L2 |
|---|---|---|---|---|---|---|
| 1.00 | General inspection, internal/external cleaning/washing of RAPH and arrangement for overhauling. | 2 | Nos | 1,15,994 ₹2,31,988 Lowest | 3,03,083 ₹6,06,166 | 9,44,000 ₹18,88,000 |
| 2.00Cold end basket | ||||||
| 2.01 | Cold end basket removal, cleaning by hydro jetting and refitting Or | 864 | Nos | 1,062 ₹9,17,568 Lowest | 1,132.8 ₹9,78,739.2 | 1,180 ₹10,19,520 |
| 2.02 | Cold end new basket replacement. (removal, transportation of new and old basket and re-insertion, ) | 864 | Nos | 1,062 ₹9,17,568 Lowest | 1,215.4 ₹10,50,105.6 | 1,180 ₹10,19,520 |
| 3.00Hot end baskets | ||||||
| 3.01 | Hot end baskets removal, cleaning by hydro jetting and refitting Or | 864 | Nos | 1,062 ₹9,17,568 Lowest | 1,132.8 ₹9,78,739.2 | 1,416 ₹12,23,424 |
| 3.02 | Hot end new basket replacement. (removal, transportation of new and old basket and re-insertion, ) | 864 | Nos | 1,062 ₹9,17,568 Lowest | 1,215.4 ₹10,50,105.6 | 1,416 ₹12,23,424 |
| 4.00Intermediate baskets | ||||||
| 4.01 | Intermediate baskets removal, cleaning by hydro jetting and refitting Or | 864 | Nos | 1,062 ₹9,17,568 Lowest | 1,132.8 ₹9,78,739.2 | 1,416 ₹12,23,424 |
| 4.02 | Intermediate new basket replacement. (removal, transportation of new and old basket and re-insertion) | 864 | Nos | 1,062 ₹9,17,568 Lowest | 1,215.4 ₹10,50,105.6 | 1,416 ₹12,23,424 |
Tender Value
₹83.7 L
EMD Value
₹1.7 L
Closing Date
19 Jul 2023, 3:30 pmClosed
C.E. (Gen.) SSTPP
IIIrd Floor Admin Building SSTPP
Work contract for Annual Overhauling of L and T Howden make Rotary Air Pre-Heater (RAPH) of Unit- 4 at 2x660MW, SSTPP,MPPGCL,Dongalia
2023_MPPGC_288866_1
WT-2020
Limited
Miscellaneous Works
Item Rate
365 days
Addl. C.E. (P and W) SSTPP
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹1.7 L
Yes
14 Oct 2025
5 Jul 2023
19 Jul 2023
5 Jul 2023
19 Jul 2023
5 Jul 2023
General inspection, internal/external cleaning/washing of RAPH and arrangement for overhauling.
Cold end basket
Cold end basket removal, cleaning by hydro jetting and refitting Or
Cold end new basket replacement. (removal, transportation of new and old basket and re-insertion, )
Hot end baskets
Hot end baskets removal, cleaning by hydro jetting and refitting Or
Hot end new basket replacement. (removal, transportation of new and old basket and re-insertion, )
Intermediate baskets
Intermediate baskets removal, cleaning by hydro jetting and refitting Or
Intermediate new basket replacement. (removal, transportation of new and old basket and re-insertion)
Rotor & sector plate levelling
Checking of Rotor Run-out
Cold end seal removal / repair / replacement & setting thereafter
Hot end seal removal / repair / replacement & setting thereafter
Axial seal removal/repair/ replacement & setting thereafter
Top & Bottom hub seal removal/repair/ replacement & setting thereafter
Replacement of reduction gear box drive unit
Servicing of reduction gear box drive unit
Replacement of top steady (guide) bearing
Servicing of top steady (guide) bearing
Replacement of bottom support bearing
Servicing of bottom support bearing
Alignment of motor with drive gear reduction unit
Replacement of complete fabric seals
RAPH housing and ducts complete leakages arresting
Replacement of dome nuts of sector plate.
Flushing and replacement of oil in bearing housing, Lop system and gear unit
Servicing & repair of cleaning devices
Replacement of Top Axial seal plate
Repairing of Axial seal plate
Replacement of Sector plate assembly
Repairing of Sector plate assembly
Replacement of metallic/non-metallic expansion bellows
Repairing of metallic/non-metallic expansion bellows
Repositioning/replacement/repair of outer circumferential seal flange/bar
Replacement of all manhole doors rope
Repairing/strengthening/replacement of cold end support bars and compartment (radial & division plate)
Servicing of air motor
Repairing of RAPH by application of MS plate / angle / channel
Bhavana Energy Infrastructure Pvt. Ltd.
REETA ENGINEERING WORKS
Bhavana Energy Infrastructure Pvt. Ltd.
REETA ENGINEERING WORKS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .