Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹12.8 L+₹2.1 L (19.7%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Ram Gopal L2 | NIRANJAN SINGH CONTRACTOR L1 |
|---|---|---|---|---|---|
| 0.00The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. | |||||
| 1.00 | EE/W in filling M.K.R. and Kankar mixed soil with lead up to 1km including Mechanical compaction watering . leveling and dressing with regurad for proper completion of work etc. | 900.4 | cum | 249.81 ₹2,24,928.92 | 170 ₹1,53,068 Lowest |
| 2.00 | E/W in cutting M.K.R. and Kankar mixed soil with intial lead up to 30 m and all lift including all lead and lift with manual compaction and dressing all labour T.&P for proper completion of work etc. | 2,652.9 | cum | 71.81 ₹1,90,504.75 | 70 ₹1,85,703 Lowest |
| 3.00 | E/W Excation in foundation on M.K.R. soil including initial lead and lift for proper completion of work etc. | 203.17 | cum | 112.33 ₹22,822.09 | 60 ₹12,190.2 Lowest |
| 4.00 | Supplying & Laying sand in inverted filter including cost of material, labour, T&P etc with all leads & lifts for proper completion of Job. | 13.79 | cum | 1,730.54 ₹23,864.15 | 1,350 ₹18,616.5 Lowest |
| 5.00 | Laying P.C.C 1:3:6 in foundation with all cost of sand cement consumption of 4.30 bags per and stone, balllast T&P etc reguard for completion of work. | 24.3 | cum | 4,027.9 ₹97,877.97 | 3,333 ₹80,991.9 Lowest |
| 6.00 | Laying C.C 1:2:4 with cement course sand and stone gritt 10 to 20 mm including all cost of material labour t&p for proper completion of work. | 14.88 | cum | 4,808.44 ₹71,549.59 | 4,100 ₹61,008 Lowest |
| 7.00 | Laying R.C.C 1:1:5:3 in slab & raft with cement course sand and stone gritt 10 to 20 mm including all cost of material labour T&P for proper completion of work. | 45.93 | cum | 5,828.94 ₹2,67,723.21 | 4,837 ₹2,22,163.41 Lowest |
| 8.00 | Steal Rainforcement for R.C.C work including cutting, bending with G.I. wire and placing in postion with cost of steal rainforcement including all Tax. | 3.61 | MT | 64,864.88 ₹2,34,162.22 | 62,100 ₹2,24,181 Lowest |
| 9.00 | Providing centering and shuttering for R.C.C work including cost of all material, labour, T&P and all leads and lifts for proper completion of Job. as per direction of Engineer-In-Charge. | 185.89 | sqm | 767.98 ₹1,42,759.8 | 580 ₹1,07,816.2 Lowest |
Tender Value
₹13.6 L
EMD Value
₹27,300
Closing Date
4 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER ICD KARWI
OFFICE OF THE EE ICD KARWI
Construction of Head regulator and Earth work from km 0.00 to 0.500 of Pahreta minor.
2026_UPIDC_1201379_7
04/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
120 days
Distt Hamirpur
AS PER NIT
2 documents required · 2 mandatory
₹854
₹27,300
19 Nov 2026
28 Oct 2026
4 Nov 2026
28 Oct 2026
4 Nov 2026
28 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. | - | - | - | - |
| 1 | EE/W in filling M.K.R. and Kankar mixed soil with lead up to 1km including Mechanical compaction watering . leveling and dressing with regurad for proper completion of work etc. | 900.4 | cum | 265.76 | ₹2,39,290.3 |
| 2 | E/W in cutting M.K.R. and Kankar mixed soil with intial lead up to 30 m and all lift including all lead and lift with manual compaction and dressing all labour T.&P for proper completion of work etc. | 2,652.9 | cum | 76.4 | ₹2,02,681.56 |
| 3 | E/W Excation in foundation on M.K.R. soil including initial lead and lift for proper completion of work etc. | 203.17 | cum | 119.5 | ₹24,278.82 |
| 4 | Supplying & Laying sand in inverted filter including cost of material, labour, T&P etc with all leads & lifts for proper completion of Job. | 13.79 | cum | 1,841.29 | ₹25,391.39 |
| 5 | Laying P.C.C 1:3:6 in foundation with all cost of sand cement consumption of 4.30 bags per and stone, balllast T&P etc reguard for completion of work. | 24.3 | cum | 4,285.22 | ₹1,04,130.85 |
| 6 | Laying C.C 1:2:4 with cement course sand and stone gritt 10 to 20 mm including all cost of material labour t&p for proper completion of work. | 14.88 | cum | 5,115.37 | ₹76,116.71 |
| 7 | Laying R.C.C 1:1:5:3 in slab & raft with cement course sand and stone gritt 10 to 20 mm including all cost of material labour T&P for proper completion of work. | 45.93 | cum | 6,201.2 | ₹2,84,821.12 |
| 8 | Steal Rainforcement for R.C.C work including cutting, bending with G.I. wire and placing in postion with cost of steal rainforcement including all Tax. | 3.61 | MT | 69,002 | ₹2,49,097.22 |
| 9 | Providing centering and shuttering for R.C.C work including cost of all material, labour, T&P and all leads and lifts for proper completion of Job. as per direction of Engineer-In-Charge. | 185.89 | sqm | 817 | ₹1,51,872.13 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.27 MB
BOQ_2273418.xls
BOQ • 0.31 MB
NIT04.pdf
Tender Documents • 4.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .