Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.8 LAccepted-AOC 60 MADHUVAN BANK COLONY ALWAR | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹37.5 L+₹78,121.30 (2.13%)Rejected-Finance A 46 ARYA NAGAR ALWAR RAJ 301001 | ALWAR | RAJASTHAN | 301001 | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹37.7 L+₹98,834.10 (2.69%)Rejected-Finance | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹38.7 L+₹2.0 L (5.39%)Rejected-Finance | L4 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | M/s Laxmi Enterprises L3 | M/s ASK Enterprises L2 | M/S JINDAL ENTERPRISES L1 | M/s R P Enterprises L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick/stone masonry built in cement/lime mortar of any mix including all quoins pillar ashlars masonry and removal complete all as specified & directed by Engr-in-Charge. | 8 | Cum | 149 ₹1,192 | 300 ₹2,400 | 135 ₹1,080 Lowest | 250 ₹2,000 |
| 2.00 | Demolition of cement concrete (un-renforced) in ground floor and paving. Exc n' 15 cm thickness (below or above ground level.) & removal of rubbish material complete all as specified & directed by Engr-in-Charge. | 46 | Cum | 149 ₹6,854 | 300 ₹13,800 | 135 ₹6,210 Lowest | 300 ₹13,800 |
| 3.00 | Dismantling of stone slab and tiles of any description or thickness in floors, aprons etc laid, beded and pointed in any mortar including removing the dismantled material complete all as specified and as directed. | 7.2 | 10 sqm | 249 ₹1,792.8 | 500 ₹3,600 | 400 ₹2,880 | 150 ₹1,080 Lowest |
| 4.00 | Taking down Chowkatts or frames with shutters (without taking off shutters from the frame) exc 1.5 sq. m but n exc 4 sq m each & removing to store complete all as specified & directed. | 52 | Each | 50 ₹2,600 Lowest | 100 ₹5,200 | 50 ₹2,600 Lowest | 150 ₹7,800 |
| 5.00 | Taking down Chowkatts or frames with shutters (without taking off shutters from the frame) n. exc 1.5 sq. m each & removing to store complete all as specified & directed. | 44 | Each | 50 ₹2,200 Lowest | 120 ₹5,280 | 50 ₹2,200 Lowest | 100 ₹4,400 |
| 6.00 | Dismantling floor hearth or wall tiling including cement mortar bedding but not backing removing serviceable tiles to store and rubbish of the premises complete all as specified & directed. | 350 | Sqm | 20 ₹7,000 | 20 ₹7,000 | 45 ₹15,750 | 10 ₹3,500 Lowest |
| 7.00 | Taking down cement plaster any description on brick or stone any description complete all as specified & directed by Engr-in-Charge. | 515 | Sqm | 18 ₹9,270 | 20 ₹10,300 | 15 ₹7,725 | 10 ₹5,150 Lowest |
| 8.00 | Taking up or down 15mm steel tubing and connections, complete all as specified & directed by Engr-in-Charge. | 150 | RM | 10 ₹1,500 Lowest | 25 ₹3,750 | 20 ₹3,000 | 10 ₹1,500 Lowest |
| 9.00 | Taking up or down 20mm steel tubing and connections, complete all as specified & directed by Engr-in-Charge. | 170 | RM | 10 ₹1,700 Lowest | 25 ₹4,250 | 20 ₹3,400 | 15 ₹2,550 |
| 10.00 | Dismantling/demolition water tanks of capacity exc 250ltr but not exc 500ltr and removing from site complete all as specified & directed by Engr-in-Charge. | 8 | Each | 149 ₹1,192 | 100 ₹800 Lowest | 250 ₹2,000 | 150 ₹1,200 |
Tender Value
₹38.7 L
EMD Value
₹78,000
Closing Date
4 Jul 2026, 6:00 pmClosed
GE Alwar
Alwar
SPL REPAIR TO MD ACCN BLDG NO P-150/09 TO 150/16 OF FD HOSP AT MIL STN ALWAR
2026_MES_771517_1
8526/E8
Open Tender
Civil Works
Item Rate
180 days
Alwar
As per NIT
6 documents required · 6 mandatory
₹500
GE Alwar
₹78,000
Yes
4 Aug 2026
11 Jun 2026
11 Jul 2026
11 Jun 2026
4 Jul 2026
27 Jun 2026
11 Jun 2026 - 25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick/stone masonry built in cement/lime mortar of any mix including all quoins pillar ashlars masonry and removal complete all as specified & directed by Engr-in-Charge. | 8 | Cum | 1.25 | ₹10 |
| 2 | Demolition of cement concrete (un-renforced) in ground floor and paving. Exc n' 15 cm thickness (below or above ground level.) & removal of rubbish material complete all as specified & directed by Engr-in-Charge. | 46 | Cum | 100 | ₹4,600 |
| 3 | Dismantling of stone slab and tiles of any description or thickness in floors, aprons etc laid, beded and pointed in any mortar including removing the dismantled material complete all as specified and as directed. | 7.2 | 10 sqm | 53 | ₹381.6 |
| 4 | Taking down Chowkatts or frames with shutters (without taking off shutters from the frame) exc 1.5 sq. m but n exc 4 sq m each & removing to store complete all as specified & directed. | 52 | Each | 10 | ₹520 |
| 5 | Taking down Chowkatts or frames with shutters (without taking off shutters from the frame) n. exc 1.5 sq. m each & removing to store complete all as specified & directed. | 44 | Each | 11 | ₹484 |
| 6 | Dismantling floor hearth or wall tiling including cement mortar bedding but not backing removing serviceable tiles to store and rubbish of the premises complete all as specified & directed. | 350 | Sqm | 1.25 | ₹437.5 |
| 7 | Taking down cement plaster any description on brick or stone any description complete all as specified & directed by Engr-in-Charge. | 515 | Sqm | - | - |
| 8 | Taking up or down 15mm steel tubing and connections, complete all as specified & directed by Engr-in-Charge. | 150 | RM | - | - |
| 9 | Taking up or down 20mm steel tubing and connections, complete all as specified & directed by Engr-in-Charge. | 170 | RM | 100 | ₹17,000 |
| 10 | Dismantling/demolition water tanks of capacity exc 250ltr but not exc 500ltr and removing from site complete all as specified & directed by Engr-in-Charge. | 8 | Each | 100 | ₹800 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tender8526.pdf
Tender Documents • 0.96 MB
BOQ_863954.xls
BOQ • 3.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .