Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹29.1 Laccepted-finance | accepted-finance |
Tender Value
₹33.9 L
EMD Value
₹33,900
Closing Date
3 Feb 2026, 11:00 pmClosed
Karnataka Power Transmission Corporation Limited
Md Shabaz Ahmed
Construction of Major Works Division office building at Koppal for construction of record room and AEs chamber.
KPTCL/2025-26/BD/WORK_INDENT3129
KPTCL/2025-26/BD/WORK_INDENT3129
Open
Buildings
Two Tender Document System(Two Cover)
KPTCL CEE Transmission Zone Office Kalburgi
7 documents required · 7 mandatory
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
Proposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)
Refer NIT and tender document
₹850
₹33,900
19 Jan 2026
19 Jan 2026
5 Feb 2026
2 Feb 2026
Attach Certificate for each work indicated above, in Format 1, obtained from the Competent Authority
Place
TENDERER (Signature & Seal)
FORMAT 2
Information of the works for which Tenderer has submitted Tender
Project Name
Place
TENDERER (Signature & Seal)
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Estimate for the work of Extension of Major Division office building at Koppal for construction of record room and accomodating AE's chamber.
Column footing
Below plinth beam
Soak pit
Sub-total
Column footing
Below plinth beam
Back filling inside shed
Deduct concrete
Sub-total
Column footing
Below plinth beam
office inside
Flag concrete
Sub-total
Column
plinth beam
lintel
roof level beam
Chejja concrete
Sub-total
footing 12mm @ 150mm C/C
Sub-total
Column steel
6 No of 16mm dia
8mm dia stirups @ 150mm C/C
8mm dia stirups @ 150mm C/C
Sub-total
plinth beam steel
6 No of 12mm dia
8mm dia stirups @ 150mm C/C
Sub-total
Lintel steel
4 No of 12mm dia
8mm dia stirups @ 150mm C/C
Sub-total
Roof level beam steel
6 No of 16mm dia
8mm dia stirups @ 150mm C/C
Sub-total
office slab steel
12mm dia @ 200mm C/C
12mm dia @ 200mm C/C
12mm dia @ 200mm C/C Extra rods
Sub-total
Chejja steel
12mm dia @ 150mm C/C
8mm dia @ 150mm C/C
Sub-total
Flag concrete
parapet coping
Sub-total
office
Racks
Parapet
Sub-total
Sub-total
Sub-total
Inside wall
store wall
Racks
Rack walls
Toilet
out side
parapet
Sub-total
office ceilling
office
Sub-total
Toilet
Sub-total
Toilet
D Vertical
Horizontal
Below plinth beam
Sub-total
ELECTRIFICATION:
1.5 sqmm Part-3 item No.2.3.2 pg No.5
2.5 sqmm Part-3 item No.2.3.3 pg No.5
4 sqmm Part-3 item No.3.3.3 pg No.5
a) Short points upto 3 Mtr from tapping point to out let via switch KPWD Electrical SR 2023-24 PART-3 item No.2.2.1 pg no.5
b) Medium point above 3 Mtr up to 6Mtr from tapping point to out let via switch KPWD Electrical SR 2023-24 PART-3 item No.2.2.2 pg no.5
c) Long point above 6 Mtr up to 10 Mtr from tapping point to out let via switch. KPWD Electrical SR 2023-24 PART-3 item No.2.2.3 pg no.5
ii) 70/0.0052" KPWD Electrical SR 2023-24 item No.2.4.8 pg no.6
ii) 6A Two Way Switch KPWD Electrical SR 2023-24 PART-3 item No.3.6.2 pg no.9
Slab for lapping steel
Toilet
for shelves
for shelves
infront of office
Sub-total
Add 18% GST
Misc & Unforeseen
Total Estimate Amount
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Self Declarations.docx
Others - Refer NIT and tender document • 0.03 MB
Tender document Koppal.docx
Tender Document • 0.07 MB
nit 220kV Koppal.doc
Instructions to Tenderers • 0.08 MB
Tender Capacit_formats.xlsx
Others - Refer NIT and tender document • 0.01 MB
AE chmabers Koppal Estimate.xls
Others - Estimate • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .