Loading…
Loading…
Tender Value
₹27.8 L
EMD Value
₹55,540
Closing Date
11 Aug 2026, 5:00 pmClosed
Nidhi bhardwaj
Horticulture Hissar
Clearance of Jungle, Earth filling,Providing and fixing of m.s. grill with toewall in G/Belt , Providing and fixing of m.s. Turning Gate, Providing and fixing of 1.80 mtr High R.C.C. pillar fancing in ground granded, Turfing of Lawn, supply and plant
2026_HBC_538161_1
2026FA10BD26 EA19 4E51 85D0 8F71564256AE262HSV
Open Tender
Civil Works
Works
210 days
Sirsa
3 documents required · 3 mandatory
₹1,000
₹55,540
Yes
3 Aug 2026
3 Aug 2026
12 Aug 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [4.1]Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. [Through Rate] | 2,670 | Sqm | 6 | ₹16,020 |
| 2 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 86.47 | cum | 78 | ₹6,744.66 |
| 3 | [10.8]Providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 [Through Rate] | 69.97 | Sqm | 181 | ₹12,664.57 |
| 4 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 16.82 | Cum | 1,863 | ₹31,335.66 |
| 5 | [17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. [Through Rate] | 667.5 | Cum | 184 | ₹1,22,820 |
| 6 | [7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] | 97.75 | cum | 3,968 | ₹3,87,872 |
| 7 | [11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate] | 278.03 | Sqm | 138 | ₹38,368.14 |
| 8 | [11.25.2]Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): 2. Raised and cut pointing [Through Rate] | 278.03 | Sqm | 105 | ₹29,193.15 |
| 9 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 3,960 | kg | 83 | ₹3,28,680 |
| 10 | [11.93.1]Finishing walls with water proofing cement paint of required shade : 1. New work (Two or more coats applied @ 3.84 kg/10 sqm) [Through Rate] | 705.71 | Sqm | 39 | ₹27,522.69 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_617333.xls
BOQ • 0.32 MB
AD0138220.pdf
Additional Documents • 8.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .