Loading…
Loading…
Tender Value
₹2.3 L
EMD Value
₹2,300
Closing Date
27 May 2026, 3:00 pmClosed
BDO (B.PT)
PANCHAYAT UNION OFFICE MANAMELKUDI
Construction of Compound wall at Manamelkudi Kurunamadam Muslim Burial Ground in Manamelkudi Panchayat
2026_RDTN_677720_1
MLACDS-2025-2026 WORK IN MANAMELKUDI BLOCK
Open Tender
Civil Works - Buildings
Works
180 days
MANAMELKUDI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2,300
Yes
23 May 2026
20 May 2026
27 May 2026
20 May 2026
27 May 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Compound wall at Manamelkudi Kurunamadam Muslim Burial Ground in Manamelkudi Panchayat | - | - | - | - |
| 2 | Earth work exacavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete | 9.63 | Cum | - | - |
| 3 | Supplying and Filling with M.Sand including cost and conveyance of all materials to site including all labour charges for filling etc complete | 1.57 | Cum | - | - |
| 4 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete | 1.57 | Cum | - | - |
| 5 | Supplying and errecting centering charges for sides and soffits of all R.c.c works including all labour charges etc complete | 27.92 | Sqm | - | - |
| 6 | Supply and fabrication of steel reinforcement for concrete works including cost and conveyance of all materials to site and all labour charges etc., complete | 1 | Mt | - | - |
| 7 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete | 4.52 | Cum | - | - |
| 8 | Brick work in cm 1:5 mix using country bricks including cost and conveyance of all materials to site including labour charges incidental charges and curing etc., complete for basement. | 4.18 | Cum | - | - |
| 9 | Plastering with Cement Mortar 1:5 mix 12mm thick including cost and conveyance of all materials and all labour charges etc,. complete. | 73.27 | Sqm | - | - |
| 10 | Emulsion Painting two Coats including cost and conveyance of all materials to site and all labour charges etc complete | 73.27 | Sqm | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.41 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_814264.xls
BOQ • 0.24 MB
TECH_BIT.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .