Loading…
Loading…
Tender Value
₹20.6 L
EMD Value
₹20,700
Closing Date
13 Aug 2026, 4:00 pmClosed
Executive Engineer Sports and cultural department
Executive Engineer Sports and cultural
Renovation and Development Of Sketing Ring At Gayatri Nagar NMC Nagpur
2026_NMCN_1325003_1
02/2026-27/EE/Sports
Open Tender
Civil Works
Percentage
120 days
Work
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹20,700
4 Aug 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
13 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 1 | Cum | 215 | ₹214.79 |
| - | Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete | 1 | Cum | 2,862 | ₹2,859.14 |
| - | Providing and laying in situ / ready mix/ ready mix M10 cement concrete of trap/ granite/ quartzite/ gneiss metal in foundation including necessary centering, formwork, bailing out water, compacting and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with natural /artifical sand) | 1 | Cum | 6,545 | ₹6,538.46 |
| - | Providing and laying in situ cement concrete M20 with tremix treatment for 100 mm thickness for flooring with groove cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete. | - | SQm | 903 | - |
| - | Providing and laying in situ / ready mix controlled grade of M25 of trap/granite /quartzite gneiss metal for RCC works in cut off walls curtain walls including necessary scaffolding, centering. compacting by vibrator, finishing and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with fine agreegates of required specifications (VSI sand finely washed etc), excluding reinforcement) | 1 | Cum | 9,050 | ₹9,040.95 |
| - | Providing, cutting, bending, hooking, tying and laying in position TMT FE 500 steel bars for reinforcement for all RCC works as per detailed drawings etc. complete | 0.28 | M.T. | 92,758 | ₹25,972.24 |
| - | Provinding and implementing FULL COURT FLOORING WITH ACRYLIC SYNTHETIC FLOORING OF 8 LAYERS WITH PAINT. THE MATERIAL USED WILL BE POLYPROPYLENE. STANDARD MARKING OF BASKETBALL/SKATING RING, ITF APPROVED on ready Trimix RCC Floor as per guidance of Architect in-charge | - | SQm | 2,050 | - |
| - | Providing and Fixing mat finish stainless steel (of 302 grade) railing with top pipe of 50 mm dia. and vertical pipe of 38 mm dia at 0.60 m c/c or as required and horizontal pipes of 25 mm dia in three rows, all pipes of 2 mm thick including buffing, fabricating fixtures and fastening including pipe base of appropriate diameter and ball base of 75 mm dia above newel post of 75 mm diameter etc. complete (Prior approval of sample and brand by Ex.Engineer is necessary before use) | - | RMT | 3,690 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
NIT.pdf
Tender Documents • 2.19 MB
BOQ_2269416.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .