Tender Value
₹3.1 Cr
EMD Value
₹3.9 Cr
Closing Date
5 Sept 2026, 6:00 pm
Chief Engineer Chd Zone
HQ CE Chandigarh Zone N Area, Airport Road Chandigarh-160003
CA NO CE CHZ CHM T 07 2026 27 ADDN ALTN AND SPL REPAIR TO EXISTING SWIMMING POOL AT SUBATHU
2026_MES_781697_1
CE CHZ/CHM/T-07/2026-27
Open Tender
Civil Works
Lump-sum
720 days
Subathu
As per Tender documents
8 documents required · 8 mandatory
₹2,000
GE Kasauli
₹3.9 Cr
Yes
30 Jul 2026
30 Jul 2026
7 Sept 2026
30 Jul 2026
5 Sept 2026
29 Aug 2026
30 Jul 2026 - 21 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Total amount of Sch 'A' Sec-I (BUILDING WORKS ) Lump sum price worked out by the contractor for " BUILDING WORKS " as listed in schedule 'A' Part-I | 1 | Lump Sum | 33,53,204.78 | ₹33,53,204.78 |
| 2 | Total amount of Sch 'A' Sec-II (SWIMMING POOL CHANGING ROOM WORKS) Lump sum price worked out by the contractor for " SWIMMING POOL CHANGING ROOM WORKS" as listed in schedule 'A' Part-II | 1 | Lump Sum | 39,28,482.45 | ₹39,28,482.45 |
| 3 | Total amount of Sch 'A' Sec-III (DEMOLITION OF BUILDINGS WORKS) Lump sum price worked out by the contractor for " DEMOLITION OF BUILDINGS WORKS " as listed in schedule 'A' Part-III | 1 | Lump Sum | 4,65,938.41 | ₹4,65,938.41 |
| 4 | Total amount of Sch 'A' Sec-IV (SITE CLEARANCE, EARTHWORK AND EXCAVATION WORKS) Lump sum price worked out by the contractor for " SITE CLEARANCE, EARTHWORK AND EXCAVATION WORKS" as listed in schedule 'A' Part-IV | 1 | Lump Sum | 1,97,304.12 | ₹1,97,304.12 |
| 5 | Total amount of Sch 'A' Sec-V (INTERNAL WATER SUPPLY WORKS) Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY WORKS " as listed in schedule 'A' Part-V | 1 | Lump Sum | 14,442.85 | ₹14,442.85 |
| 6 | Total amount of Sch 'A' Sec-VI (INTERNAL ELECTRIFICATION WORKS ) Lump sum price worked out by the contractor for " INTERNAL ELECTRIFICATION WORKS " as listed in schedule 'A' Part-VI | 1 | Lump Sum | 1,59,971.28 | ₹1,59,971.28 |
| 7 | Total amount of Sch 'A' Sec-VII (ROAD, PATH, CULVERTS AND HARDSTANDING WORKS) Lump sum price worked out by the contractor for "ROAD, PATH, CULVERTS AND HARDSTANDING WORKS " as listed in schedule 'A' Part-VII | 1 | Lump Sum | 1,79,010.5 | ₹1,79,010.5 |
| 8 | Total amount of Sch 'A' Sec-VIII (EXTERNAL WATER SUPPLY WORKS Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY WORKS " as listed in schedule 'A' Part-VIII | 1 | Lump Sum | 43,584.16 | ₹43,584.16 |
| 9 | Total amount of Sch 'A' Sec-IX ( EXTERNAL ELET SUPPLY WORKS ) Lump sum price worked out by the contractor for "EXTERNAL ELET SUPPLY WORKS " as listed in schedule 'A' Part-IX | 1 | Lump Sum | 18,67,811.1 | ₹18,67,811.1 |
| 10 | Total amount of Sch 'A' Sec-X (SEWAGE DISPOSAL WORKS ) Lump sum price worked out by the contractor for " SEWAGE DISPOSAL WORKS " as listed in schedule 'A' Part-X | 1 | Lump Sum | 73,477.33 | ₹73,477.33 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_875808.xls
BOQ • 5.53 MB
TD-277R FINAL.pdf
Additional Documents • 0.21 MB
TD-284 PVC WATER TANK STRL DETAIL.pdf
Additional Documents • 0.07 MB
ARCH DRGS.PDF
Additional Documents • 0.22 MB
LIST OF DRGS.PDF
Additional Documents • 0.12 MB
SD 1003 C LIGHT FITTINGS .pdf
Additional Documents • 0.07 MB
SD 4521 C BILDING NAME FORMAT.pdf
Additional Documents • 0.03 MB
SITE PANS.PDF
Additional Documents • 0.11 MB
STD 1234 PCC DRAIN TYPE A,B FOOT PATH SLAB.pdf
Additional Documents • 0.08 MB
STD 1250 LIGHTINING CONDUCTOR.pdf
Additional Documents • 0.07 MB
STD 1253 HT,LT RCC POLES,CONNECTING DET.pdf
Additional Documents • 0.07 MB
STD 1254 INT,EXT ELECT AND WATER SUPPLY NOTES.pdf
Additional Documents • 0.10 MB
STD 1258 WATER STAND POST,VALVE PIT WITH RCC COVER.pdf
Additional Documents • 0.09 MB
STD 1259 ARCHITECTURAL NORMS.pdf
Additional Documents • 0.08 MB
STD 1303 MAN HOLES 5 MTR DEPTH.pdf
Additional Documents • 0.15 MB
STD 1314ARRANGEMENT OF MAN HOLE PIPES.pdf
Additional Documents • 0.09 MB
STD 1434 to 1439 STR.PDF
Additional Documents • 2.10 MB
STD 1441 1R.1_18022025105250.PDF
Additional Documents • 0.03 MB
Std.1434,1R.3 to 3R. 11june 25.PDF
Additional Documents • 0.16 MB
STR DRGS.PDF
Additional Documents • 0.28 MB
TD 112 [C] SWITCH BOX.pdf
Additional Documents • 0.40 MB
TD 116 WHB WITH MIRR URINAL PART.pdf
Additional Documents • 0.06 MB
TD 117 BATH ROOM FIXICIR.pdf
Additional Documents • 0.08 MB
TD 121 FAN HOOK.pdf
Additional Documents • 0.05 MB
TD 123 HOT& COLD WATER FITTING.pdf
Additional Documents • 0.04 MB
TD 136 EXHAUST FAN.pdf
Additional Documents • 0.04 MB
TD 137 ROADS & PATH.pdf
Additional Documents • 0.05 MB
TD 138 HUME PIPE CULVERTS.pdf
Additional Documents • 0.06 MB
TD 176 NAHINE TRAP,GULLI TRAP FLOOR.pdf
Additional Documents • 0.04 MB
TD 180 TYP.DET OF PLUMBING SYSTEM.pdf
Additional Documents • 0.07 MB
TD 182 SIGN ,SYMBAL BOARD.pdf
Additional Documents • 0.03 MB
TD 187 PLINTH PROTECTION.pdf
Additional Documents • 0.03 MB
TD -201 C SHT 5R,6R.pdf
Additional Documents • 0.23 MB
TD 272 FLUSH DOOR WITH FRESHED STEEL FRAME.pdf
Additional Documents • 0.18 MB
TD 276 R BOX WINDOWS WITH JALI.pdf
Additional Documents • 0.69 MB
Ftender.pdf
Tender Documents • 5.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].