Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC GIJROLI DY LIKELY RELATED TO THE WORK LOCATION MENTIONED SPECIFIC ADDRESS NOT PROVIDED FOR THE CONTRACTOR | DAMAN | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396210 | L1 | Accepted-AOC LOWEST-1 | |
| 2 | L2₹2.2 Cr+₹28.0 L (14.8%)Rejected-Finance B 12 SANGWAN CITY ASADPUR KAYAM ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | L2 | Rejected-Finance LOWEST-2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Documents Not found as per requirement |
| Sl No | Description | Qty | Unit | MEGHENDRA PAL SINGH CONTRECTOR L1 | M/S MANOJ TRADERS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work with graded soil mix with clay for making bank/bund i/c. all cost of mechnical compection, all lift and lead beyond 200m. and upto 1.00 km by power transport. | 937.99 | Cum. | 50 ₹46,899.5 Lowest | 50 ₹46,899.5 Lowest |
| 2.00 | Dismantling reinforced cement concrete or reinforced brick work including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). | 102.66 | Cum. | 200 ₹20,532 | 100 ₹10,266 Lowest |
| 3.00 | Earth work in excavation mixed with dry wet or under water i/c. ramming and dressing the surface to the required levels, slopes and also i/c. 1.5M lift and 30 m in lead and disposal of earth. | 1,885.3 | Cum. | 50 ₹94,265 Lowest | 100 ₹1,88,530 |
| 4.00 | Laying C.C. 1:3:6 (M-10) in foundation, Sleeper etc including all cost of material, labour and T&P etc. | 151.53 | Cum. | 3,000 ₹4,54,590 Lowest | 6,000 ₹9,09,180 |
| 5.00 | Laying R.C.C. 1:2:4 M-15 including all cost of material, labour and T&P etc. | 556.91 | Cum. | 4,800 ₹26,73,168 Lowest | 6,200 ₹34,52,842 |
| 6.00 | Providing & Laying R.C.C. M-25 Production by batching plant including all cost of material, labour and T&P etc. | 661.4 | Cum. | 8,800 ₹58,20,320 | 7,200 ₹47,62,080 Lowest |
| 7.00 | Centering & Shuttering for RCC work including all cost of material, labour and T&P etc. | 1,794.93 | Sqm | 750 ₹13,46,197.5 | 500 ₹8,97,465 Lowest |
| 8.00 | Ordinary Centering & shuttering/Form Work for C.C. Block including all cost of material, labour and T&P etc. | 689.6 | Sqm | 500 ₹3,44,800 Lowest | 500 ₹3,44,800 Lowest |
| 9.00 | Providing & Laying RBM including all cost of material, labour and T&P etc. | 146.14 | Cum. | 800 ₹1,16,912 Lowest | 2,000 ₹2,92,280 |
| 10.00 | Providing & Filling Ordinary Sand in deep areas & Below the raft foundation including all cost of material, labour and T&P etc. | 158.4 | Cum. | 700 ₹1,10,880 Lowest | 2,000 ₹3,16,800 |
Tender Value
₹2.6 Cr
EMD Value
₹5.1 L
Closing Date
1 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S. E. I.W.C. Aligarh
25 Lal Diggi Aligarh
Work on the VRB cum-cross regulator at km 29.558 (Sevenpur) of the Farrukhabad Branch System.
2026_UPIDC_1175374_3
03/SE/2026-27
Open Tender
Civil Works - Canal
Item Rate
365 days
Kasganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,031
₹5.1 L
Yes
Office of the SE IWC Aligarh
28 Sept 2026
7 Aug 2026
1 Sept 2026
24 Aug 2026
1 Sept 2026
24 Aug 2026
24 Aug 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work with graded soil mix with clay for making bank/bund i/c. all cost of mechnical compection, all lift and lead beyond 200m. and upto 1.00 km by power transport. | - | Cum. | - | - |
| 2 | Dismantling reinforced cement concrete or reinforced brick work including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). | 1 | Cum. | - | - |
| 3 | Earth work in excavation mixed with dry wet or under water i/c. ramming and dressing the surface to the required levels, slopes and also i/c. 1.5M lift and 30 m in lead and disposal of earth. | 1 | Cum. | - | - |
| 4 | Laying C.C. 1:3:6 (M-10) in foundation, Sleeper etc including all cost of material, labour and T&P etc. | - | Cum. | - | - |
| 5 | Laying R.C.C. 1:2:4 M-15 including all cost of material, labour and T&P etc. | 1 | Cum. | - | - |
| 6 | Providing & Laying R.C.C. M-25 Production by batching plant including all cost of material, labour and T&P etc. | 1 | Cum. | - | - |
| 7 | Centering & Shuttering for RCC work including all cost of material, labour and T&P etc. | - | Sqm | - | - |
| 8 | Ordinary Centering & shuttering/Form Work for C.C. Block including all cost of material, labour and T&P etc. | - | Sqm | - | - |
| 9 | Providing & Laying RBM including all cost of material, labour and T&P etc. | 1 | Cum. | - | - |
| 10 | Providing & Filling Ordinary Sand in deep areas & Below the raft foundation including all cost of material, labour and T&P etc. | - | Cum. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.47 MB
TDLOT03.pdf
Tender Documents • 1.05 MB
BOQ_2208813.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .