Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹6.4 L
EMD Value
₹12,820
Closing Date
27 Oct 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
xen,IFCD Sumbal
irrigation colony sumbal
Construction of Sump for Zalpora Drought Station
2026_IFC_327100_2
ENIT05OF2026-7
Open Tender
Civil Works
Percentage
25 days
Sumbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
XENIFCDSUMBAL
₹12,820
5 Oct 2026
5 Oct 2026
28 Oct 2026
5 Oct 2026
27 Oct 2026
5 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 86.43 | Cum | 187.3 | ₹16,188.34 |
| 2 | Providing and laying of dry stone solling including cost of stones | 8.02 | Cum | 937.9 | ₹7,521.96 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size Crushed) | 4.71 | Cum | 5,202.9 | ₹24,505.66 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement.
All works upto plinth level
1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size Crushed) | 35.53 | cum | 7,788.4 | ₹2,76,721.85 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level (TMT Bars) | 2,123 | Kg | 123.2 | ₹2,61,553.6 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work (Complete) | 117.8 | Sqm | 286.35 | ₹33,732.03 |
| 7 | Carriage of material from source upto site of work by mechanical transport,including loading,unloading and stacking etc
a) 40mm stone agg avg lead 21 kms | 4.23 | Cum | 457.64 | ₹1,935.82 |
| 7.1 | b) 20mm stone agg avg lead 21 kms | 30.2 | Cum | 420.98 | ₹12,713.6 |
| 7.2 | c) Stone Soling from avg lead 21 kms | 8.02 | Cum | 495.29 | ₹3,972.23 |
| 7.3 | d) Sand avg lead of 01 kms | 18.1 | Cum | 128.75 | ₹2,330.38 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.39 MB
BOQ_1106420.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .