| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAdmitted-Finance 130A 18TH FLOOR INFINITY BUSINESS CENTRE PLOT GI BLOCK GP SALTLAKE SEC V KOLKATA 700091 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹2.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.7 Cr+₹21.8 L (8.82%)Admitted-Finance 39 ANAND INDUTRIAL ESTATE MOHAN NAGAR GHAZIABAD UTTAR PRADESH 201007 | GHAZIABAD | UTTAR PRADESH | 201007 | ₹2.7 Cr+₹21.8 L (8.82%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical NA ROHIT TYAGI BEGUM BRIDGE MEERUT BEGUM BRIDGE BEGUM BRIDGE MEERUT UTTAR PRADESH 250001 | MEERUT | UTTAR PRADESH | 250001 | - | - | Rejected-Technical Not Qualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | SOMBANSI ENVIRO ENGG PVT LTD L2 | SWACH ENVIRONMENT PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00 | Supply of all materials & manpower i.e., 45 nos. of Skilled labour & 9 nos. High Skilled (Co-ordinator having minimum experience of 03years in WTP / STP work, Lab Assistant having minimum of 01year experience, Electrical, Mechanical having minimun of 01year experience & Shift-Incharge) in three shifts for smooth & continuous running operation & maintenance of existing 27MLD water treatment plant(WTP) & the water supply system of Balijhara Water Works(BWW) i.e.,treatment plants, raw water & canal intake pump house with supply of adequate number of skilled persons in three shifts as operators & maintenance crew with proper tools including supply & dosing of chemicals of required quantity with all records, attending to preventive maintenance & breakdown (Major/Minor) to all the assets (The treatment plant along with its process units & all the equipments & facilities) as per the detailed list i.e pumps, motors, DG Sets, electrical panels & parts, components of the switch/operating board with supply of all spare parts required for maintenance, inspection of power lines, maintenance of illumination to the treatment plants, raw water & canal intake pump houses including changing of halogen lights, push buttons wiring if required, deployment of Engineering personnel to ensure an efficient, effective & sustainable water supply with the available resources on 'as is where is basis', if during the operation the pumps, motors or any other equipments /installations are not in workable & repairable condition then the replacement of the same from reputed manufactures shall be made by the agency one to one at his/their own cost, functioning, running & maintenance of pumps, pipes, valves, electrical installations, instrumentation, maintaining log for running of electrical pumps, DG sets, Diesel Engine ets., to achieve drinking water confirming to IS standards,maintaining cleanliness to premises etc. with supply of all labour, T&P etc. complete as per the direction of Engineer-in-charge. (Excluding cost of GST) | 12 | Each Month | 19,80,000 ₹2,37,60,000 Lowest | 20,39,872 ₹2,44,78,464 |
| 2.00 | Cleaning of existing filter beds of specified size & number as per scope of work, topping up once in a year with supply of filter media consisting of sand, pebbles of different sizes & activated carbon etc. asper requirement with supply of materials, labour, T&P, taxes, tollage,transportation charges etc. all complete as per the direction of Engineer-in-charge (Excluding the cost of GST) | 1 | Each Year | 4,50,000 ₹4,50,000 | 1,000 ₹1,000 Lowest |
| 3.00 | Cleaning of 04 nos. of existing clarifiers (No. 1, 2, 3 & 4) of 22 mtr. dia. once in a quarter (Three months) with supply of all labour, materials, T&P etc. all complete as per the direction of Engineer-in-charge.(Excluding the cost of GST) | 16 | Each Time | 1,50,000 ₹24,00,000 | 12,500 ₹2,00,000 Lowest |
| 4.00 | Testing of treated water once in a month as per IS Standard suitable for human consumption (Drinking & Cooking) from outside lab (NABL Accredited lab)/ Govt. Laboratories including collection of sample in a container & transportation charges, testing charges ,submission of the test report to the Deptt. etc. all complete as per the direction of Engineer-in-charge.(Excluding the cost of GST) | 12 | Each No. | 20,000 ₹2,40,000 | 1,000 ₹12,000 Lowest |
| 5.00Operation & Maintenance of two nos. of flow meter installed in 450mm dia pipe at Raw water- I & II including minor & major components replacement if required with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, hire & running charges of all equipment taking all safety precautions during installation etc. all complete but excluding GST as directed by Engineer-in-charge. | |||||
| 5.01 | Routine inspection & preventive maintenance of 2 nos. of water flow meter of 450mm dia. | 12 | Each Month | 2,000 ₹24,000 | 817 ₹9,804 Lowest |
| 5.02 | Supply & replacement of display of flow meter (450mm dia). | 2 | Each No. | 2,000 ₹4,000 | 1,000 ₹2,000 Lowest |
| 5.03 | Supply & replacement of UPS of flow meter (450mm dia). | 2 | Each No. | 2,000 ₹4,000 | 1,000 ₹2,000 Lowest |
| 5.04 | Supply & replacement of card of flow meter (450mm dia). | 2 | Each No. | 2,800 ₹5,600 | 1,000 ₹2,000 Lowest |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
9 Feb 2024, 5:00 pmClosed
S K SAMAL,EE,PHD(M)(I/C),PPA
S K SAMAL,EE,PHD(M)(I/C),PPA
Outsourcing of Operational work of Balijhara water works on Job Contract basis under PHD(M) for the year 2024-25(One year).
2024_MoS_791248_1
CE/PHD(M)/ACCTS-38/23/32
Open Tender
Civil Works
Works
365 days
Paradip
Refer Tender Document and e-TCN
5 documents required · 5 mandatory
₹5,000
Yes
As per Tender Document and e-TCN
₹5.8 L
Yes
4 Mar 2024
19 Jan 2024
12 Feb 2024
19 Jan 2024
9 Feb 2024
19 Jan 2024
Amount
Supply of all materials & manpower i.e., 45 nos. of Skilled labour & 9 nos. High Skilled (Co-ordinator having minimum experience of 03years in WTP / STP work, Lab Assistant having minimum of 01year experience, Electrical, Mechanical having minimun of 01year experience & Shift-Incharge) in three shifts for smooth & continuous running operation & maintenance of existing 27MLD water treatment plant(WTP) & the water supply system of Balijhara Water Works(BWW) i.e.,treatment plants, raw water & canal intake pump house with supply of adequate number of skilled persons in three shifts as operators & maintenance crew with proper tools including supply & dosing of chemicals of required quantity with all records, attending to preventive maintenance & breakdown (Major/Minor) to all the assets (The treatment plant along with its process units & all the equipments & facilities) as per the detailed list i.e pumps, motors, DG Sets, electrical panels & parts, components of the switch/operating board with supply of all spare parts required for maintenance, inspection of power lines, maintenance of illumination to the treatment plants, raw water & canal intake pump houses including changing of halogen lights, push buttons wiring if required, deployment of Engineering personnel to ensure an efficient, effective & sustainable water supply with the available resources on 'as is where is basis', if during the operation the pumps, motors or any other equipments /installations are not in workable & repairable condition then the replacement of the same from reputed manufactures shall be made by the agency one to one at his/their own cost, functioning, running & maintenance of pumps, pipes, valves, electrical installations, instrumentation, maintaining log for running of electrical pumps, DG sets, Diesel Engine ets., to achieve drinking water confirming to IS standards,maintaining cleanliness to premises etc. with supply of all labour, T&P etc. complete as per the direction of Engineer-in-charge. (Excluding cost of GST)
Cleaning of existing filter beds of specified size & number as per scope of work, topping up once in a year with supply of filter media consisting of sand, pebbles of different sizes & activated carbon etc. asper requirement with supply of materials, labour, T&P, taxes, tollage,transportation charges etc. all complete as per the direction of Engineer-in-charge (Excluding the cost of GST)
Cleaning of 04 nos. of existing clarifiers (No. 1, 2, 3 & 4) of 22 mtr. dia. once in a quarter (Three months) with supply of all labour, materials, T&P etc. all complete as per the direction of Engineer-in-charge.(Excluding the cost of GST)
Testing of treated water once in a month as per IS Standard suitable for human consumption (Drinking & Cooking) from outside lab (NABL Accredited lab)/ Govt. Laboratories including collection of sample in a container & transportation charges, testing charges ,submission of the test report to the Deptt. etc. all complete as per the direction of Engineer-in-charge.(Excluding the cost of GST)
Operation & Maintenance of two nos. of flow meter installed in 450mm dia pipe at Raw water- I & II including minor & major components replacement if required with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, hire & running charges of all equipment taking all safety precautions during installation etc. all complete but excluding GST as directed by Engineer-in-charge.
Routine inspection & preventive maintenance of 2 nos. of water flow meter of 450mm dia.
Supply & replacement of display of flow meter (450mm dia).
Supply & replacement of UPS of flow meter (450mm dia).
Supply & replacement of card of flow meter (450mm dia).
SOMBANSI ENVIRO ENGG PVT LTD
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
BOQ_831656.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .