| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹25 LAccepted-AOC | 1 | Accepted-AOC Rates found reasonable hence awarded | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-BQR not satisfied |
| Sl No | Description | Qty | Unit | V.V.ELECTRICALS AND CIVIL CONTRACTORS L1 |
|---|---|---|---|---|
| 1.00EXCAVATION OF POLE PITS / Stay Set: | ||||
| 1.01 | For pole upto 8.00m length by using JCB/Manual | 1 | per pit | 790 ₹932.2 Lowest |
| 1.02 | For pole above 8.00m length by using JCB/Manual | 1 | per pit | 800 ₹944 Lowest |
| 1.03 | In Hard Soil (common to all size of poles) | 1 | per pit | 800 ₹944 Lowest |
| 1.04 | In rocky area (common to all size of poles) by blasting / Manual | 1 | per pit | 1,000 ₹1,180 Lowest |
| 1.05 | Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual | 1 | EACH | 750 ₹885 Lowest |
| 1.06 | Excavation & back filling of stay pit per location - Hard rock requires blasting | 1 | EACH | 1,000 ₹1,180 Lowest |
| 1.07 | Excavation & back filling of stay pit per location - Hard rock without blasting | 1 | EACH | 1,000 ₹1,180 Lowest |
| 1.08 | Excavation & back filling of stay pit per location - Medium rock and dense medium rock requires blasting | 1 | EACH | 1,000 ₹1,180 Lowest |
| 2.00ERECTION OF POLES AND ACCESSORIES | ||||
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
11 Aug 2026, 2:00 pmClosed
The Superintending Engineer/CEDC/Metro/Cbe
The Superintending Engineer, CEDC/Metro, Tatabad, Coimbatore 641012
Extension Works in Urban Division
2026_EB_688861_1
ET ENQ NO.09/2026-27 DT 27.07.2026
Open Tender
Electrical Works
Works
365 days
Metro/Cbe
Refer Tender Document
2 documents required · 2 mandatory
₹0
₹25,000
Yes
8 Sept 2026
27 Jul 2026
12 Aug 2026
27 Jul 2026
11 Aug 2026
27 Jul 2026
27 Jul 2026 - 11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1EXCAVATION OF POLE PITS / Stay Set: | |||||
| 1.01 | For pole upto 8.00m length by using JCB/Manual | 1 | per pit | - | - |
| 1.02 | For pole above 8.00m length by using JCB/Manual | 1 | per pit | - | - |
| 1.03 | In Hard Soil (common to all size of poles) | 1 | per pit | - | - |
| 1.04 | In rocky area (common to all size of poles) by blasting / Manual | 1 | per pit | - | - |
| 1.05 | Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual | 1 | EACH | - | - |
| 1.06 | Excavation & back filling of stay pit per location - Hard rock requires blasting | 1 | EACH | - | - |
| 1.07 | Excavation & back filling of stay pit per location - Hard rock without blasting | 1 | EACH | - | - |
| 1.08 | Excavation & back filling of stay pit per location - Medium rock and dense medium rock requires blasting | 1 | EACH | - | - |
| 2ERECTION OF POLES AND ACCESSORIES | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_828067.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .