Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC GARH ROAD MEERUT UTTAR PRADESH 250002 INDIA | MEERUT | UTTAR PRADESH | 250002 | L1 | Accepted-AOC Validated (Lowest bidder) | |
| 2 | L2₹16.8 L+₹1.2 L (7.81%)Rejected-Finance | L2 | Rejected-Finance Not validated (Other than lowest bidder) | |
| 3 | L3₹16.9 L+₹1.4 L (8.76%)Rejected-Finance HOUSE NO 29 A SIJUBARI NIZARA PATH PO PS HATTIGAON GUWAHATI 38 | KAMRUP METRO | ASSAM | 781038 | L3 | Rejected-Finance Not validated (Other than lowest bidder) | |
| 4 | L4₹18.1 L+₹2.6 L (16.5%)Rejected-Finance OIL INDIA LTD GATE NO 02 PO UDAYAN VIHAR GUWAHATI ASSAM | KAMRUP METRO | ASSAM | 781001 | L4 | Rejected-Finance Not validated (Other than lowest bidder) | |
| 5 | Rejected-Technical | - | Rejected-Technical Cost of tender not uploaded |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
6 Jul 2026, 6:00 pmClosed
GE Guwahati
GE GUWAHATI, PO SATGAON, DISTT KAMRUP - 781027
TERM CONTRACT FOR ARTIFICER WORKS FOR SHANTIPUR, BHUTNATH, 240 TRANSIT CAMP AND MES IB UNDER GE GUWAHATI
2026_MES_772272_1
8658/E8
Open Tender
Civil Works
Percentage
365 days
Guwahati
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE Guwahati
₹30,000
Yes
17 Aug 2026
15 Jun 2026
8 Jul 2026
15 Jun 2026
6 Jul 2026
29 Jun 2026
15 Jun 2026 - 22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | To execute the Work as per Condition 4(A) of IAFW-2249 and all as specified in MES STANDARD SCHEDULE OF RATES 2009 PART–I (SPECIFICATIONS) and MES STANDARD SCHEDULE OF RATES
2020 PART–II (RATES) together with ERRATA NIL and AMENDMENT No. 1 TO 3 for PART–I (SPECIFICATIONS) and ERRATA/ AMENDMENT No. - 01 TO - 122 for PART–II (RATES) subject to Quoted Percentage by the Tenderer the Work shall be carriedout as per Work Order(s) placed by the Engineer-in- Charge during the Period of ONE YEAR from the date of Acceptance of Tender. NOTE : Tenderer shall insert the Percentage under Col-06 against "Qouted Rate in Figures" in this BOQ Excel Sheet by selecting the option Excess (+) or Less (-) to quote Percentage above or below the MES STANDARD SCHEDULE OF RATES
2020 PART–II (RATES) respectively. For acceptance purpose Percentage quoted by the Tenderer will be taken into account. | 1 | Nos | 15,00,000 | ₹15,00,000 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.37 MB
8658TenderDocuments.pdf
Tender Documents • 0.94 MB
BOQ_864757.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .