Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹32.4 LAccepted-AOC | 1 | Accepted-AOC awarded | |
| 2 | 2₹33.4 L+₹1.1 L (3.38%)Rejected-Finance 10 A FRIENDS COLONY PATIALA 147001 | PATIALA | PUNJAB | 147001 | 2 | Rejected-Finance high bidder |
| Sl No | Description | Qty | Unit | BANSAL CONSTRUCTION CO. L2 | CHARDI KALA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation in soil (any type) using Hydraulic Excavator CK 90 hydraulic excavator of 0.9 cum bucket capacity including cutting and leading in tippers, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead up to 30 m. (CSR Item No. 6.19) | 1,261.01 | Cum | 74 ₹93,314.74 | 73.4 ₹92,558.13 Lowest |
| 2.00 | Earth work in excavation in foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm. layers with compaction including disposal of all surplus soil as directed within lead of 30 Mtrs. (CSR Item No. 6.6) | 17.43 | Cum | 5,200 ₹90,636 | 5,000 ₹87,150 Lowest |
| 3.00 | Excavation in soil (any type) using Hydraulic Excavator CK 90 hydraulic excavator of 0.9 cum bucket capacity including cutting and leading in tippers, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead up to 30 m. (Rehandling of earth) (CSR Item No. 6.19 - 20 %) | 1,008.81 | Cum | 6,100 ₹61,53,741 | 6,000 ₹60,52,860 Lowest |
| 4.00 | Compaction Extra for laying earth/fly ash as per specifications in 20 cm. Layers and dressing but excluding cost of rolling. Extra for watering the earth/fly ash laid in 20 cm layers as per specifications for compaction.Extra for rolling to specifications | 336.91 | Cum | 99 ₹33,354.09 Lowest | 99.03 ₹33,364.2 |
| 5.00 | Laying cement concrete M-15 with stone ballast or shingle mixing by manual means | 11 | Cum | 6,200 ₹68,200 | 6,000 ₹66,000 Lowest |
| 6.00 | Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) coping and sleepers | 1.68 | Cum | 700 ₹1,176 Lowest | 714.92 ₹1,201.07 |
| 7.00 | Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) | 15.76 | Cum | 6,500 ₹1,02,440 | 6,005.2 ₹94,641.95 Lowest |
| 8.00 | Reinforced Cement Concrete M-25 mechanically natch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centering and shuttering in foundation and plinth. | 115.51 | Cum | 6,500 ₹7,50,815 Lowest | 6,500 ₹7,50,815 Lowest |
| 9.00 | Dressing bed and preparation of sub grade for lining. | 27.18 | Sqm | 11.35 ₹308.49 Lowest | 11.35 ₹308.49 Lowest |
| 10.00 | Dressing side slopes and preparation of sub grade for lining. | 51.58 | Sqm | 19 ₹980.02 | 18.49 ₹953.71 Lowest |
Tender Value
₹20.7 L
EMD Value
₹41,477
Closing Date
28 Oct 2026, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
FARIDKOT CANAL AND GW DIVISION FARIDKOT
Estimate for construction of VR Bridge at RD 40963 of Kotkapura Disty
2026_WR_176874_1
Estimate for construction of VR Bridge at RD 40963 of Kotkapura Disty
Open Tender
Civil Works
Item Wise
45 days
Dhaipai
Pre Qualification Details
2 documents required · 2 mandatory
₹500
Yes
₹41,477
Yes
Faridkot
20 Nov 2026
6 Oct 2026
28 Oct 2026
6 Oct 2026
28 Oct 2026
6 Oct 2026
12 Oct 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in soil (any type) using Hydraulic Excavator CK 90 hydraulic excavator of 0.9 cum bucket capacity including cutting and leading in tippers, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead up to 30 m. (CSR Item No. 6.19) | 1,261.01 | Cum | 1 | ₹1,261.01 |
| 2 | Earth work in excavation in foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm. layers with compaction including disposal of all surplus soil as directed within lead of 30 Mtrs. (CSR Item No. 6.6) | 17.43 | Cum | 1 | ₹17.43 |
| 3 | Excavation in soil (any type) using Hydraulic Excavator CK 90 hydraulic excavator of 0.9 cum bucket capacity including cutting and leading in tippers, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead up to 30 m. (Rehandling of earth) (CSR Item No. 6.19 - 20 %) | 1,008.81 | Cum | 1 | ₹1,008.81 |
| 4 | Compaction Extra for laying earth/fly ash as per specifications in 20 cm. Layers and dressing but excluding cost of rolling. Extra for watering the earth/fly ash laid in 20 cm layers as per specifications for compaction.Extra for rolling to specifications | 336.91 | Cum | 1 | ₹336.91 |
| 5 | Laying cement concrete M-15 with stone ballast or shingle mixing by manual means | 11 | Cum | 1 | ₹11 |
| 6 | Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) coping and sleepers | 1.68 | Cum | 1 | ₹1.68 |
| 7 | Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) | 15.76 | Cum | 1 | ₹15.76 |
| 8 | Reinforced Cement Concrete M-25 mechanically natch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centering and shuttering in foundation and plinth. | 115.51 | Cum | 1 | ₹115.51 |
| 9 | Dressing bed and preparation of sub grade for lining. | 27.18 | Sqm | 1 | ₹27.18 |
| 10 | Dressing side slopes and preparation of sub grade for lining. | 51.58 | Sqm | 1 | ₹51.58 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
Tendernotice_2.pdf
PDF • 0.63 MB
BOQ_360500.xls
BOQ • 0.30 MB
CorrirendumChangeitemandQty40963.pdf
PDF • 0.46 MB
corrigendumvr40936kkpbridge1.pdf
PDF • 0.28 MB
corrigendumvr40936kkpbridge.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .