Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.1 CrRejected-Finance | ₹2.1 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Bidder does not fulfill technical criteria mentioned clause no 1.11 (4) of tender document |
| 4 | Rejected-Technical | - | - | Rejected-Technical Bidder does not fulfill technical criteria mentioned clause no 1.11 (4) of tender document |
| 5 | Rejected-Technical | - | - | Rejected-Technical Bidder does not fulfill technical criteria mentioned clause no 1.2(2)b and 1.2(2)c of tender document |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
13 Oct 2025, 5:30 pmClosed
Executive Engineer Ujjani Hydro Ele Div Indapur
Executive Engineer Ujjani Hydro Ele Div Indapur Dist Pune
Upgradation of 33 KV line and 33 KV Switchgear bay at 33 KV Shetfalgade substation of MSEDCL required to be executed for as per MSEDCL requirements and as per work site conditions for the work of Construction of Pump House Stage I and II and Allied
2025_MHEPM_1225327_1
Tender Notice No 2
Open Tender
Electrical Works
365 days
Kumbhargaon Shetfalgade
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
₹2.1 L
25 Jun 2026
6 Oct 2025
15 Oct 2025
6 Oct 2025
13 Oct 2025
6 Oct 2025
6 Oct 2025 - 8 Oct 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid