| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance R O HOUSING COLONY LEH | LEH LADAKH | LADAKH | 194101 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical HOUSING COLONY | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹11.9 L
EMD Value
₹23,880
Closing Date
8 Apr 2023, 4:00 pmClosed
Executive Engineer Construction division leh
Office of the Executive Engineer Const division leh
Construction of 9 nos 1 mtr sapn with grating and improvement of side drains in Diskitsal Housing Colony Leh B
2023_PWD_8926_8
134 of CDL leh of 2022-23
Open Tender
Civil Works - Others
Item Rate
30 days
Leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Payable To Executive Engineer Constr
₹23,880
11 Apr 2023
5 Apr 2023
10 Apr 2023
5 Apr 2023
8 Apr 2023
5 Apr 2023
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil
Dry stone pitching (any thickness) excluding cost of stones . (On Horizontal ).
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
Columns, piers, abutments, pillars, posts and struts
Steel work welded in the built up section /framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required 10.25.1 In stringers, treads, landimgs etc. of stair cases, including use of chequered plate wherever required, all complete In grating, frames, guard bar, ladder, raillings, brakects, gates and similar works.
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil:
Carriage of material by way of MT including loading, unloading and stacking all complete job a)Cement an avg lead 2 km
b)Sand and Aggregate an avg lead 10 km
c)Earth an avg lead 03 km
M/S ROZI ALI
M/S SKALZANG DAWA
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .