| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 CrAccepted-AOC | ₹11.5 Cr Quoted ₹11.7 Cr | L1 | Accepted-AOC AOC enclosed |
| 2 | L2₹12.1 CrRejected-Finance | ₹12.1 Cr | L2 | Rejected-Finance Reject |
Tender Value
Refer Docs
EMD Value
₹5.4 L
Closing Date
18 Aug 2020, 11:00 amClosed
SUPERINTENDING ENGINEER
Office of the Superintending Engineer Highways NABARD and Rural Roads Circle Salem 1
Construction of Road over Bridge at Km 0/6 of Thaneerpandal Road in lieu of existing LC.No.6 at Railway Km.6/15-17 in between Singanallur - Peelamedu Railway Stations.
2020_HWAY_171725_1
TN.No.11 2020-2021 SDO Dt.14.07.2020
Open Tender
Civil Works - Bridges
540 days
Coimbatore
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹5.4 L
18 Mar 2021
17 Jul 2020
19 Aug 2020
17 Jul 2020
18 Aug 2020
27 Jul 2020
Amount
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer using with a lead of 10Km for box cutting of Approach Road.
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Earth with a lead of 10 km for formation of Approach Road. 95 % & 97 % Compaction.
Granular Sub-base with Graded Material (Table:-400-1)-Plant Mix Method Construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers of 250mm thick with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification for grading-V Material for Approach Road.
Providing and laying, spreading and compacting graded stone aggregates to Wet mix macadam specification including premixing the materials with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub base course on well prepared surface and compacting with Vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 406 of MORTH Rev-5 for Approach Road.
Providing and laying Prime Coat over WMM surface using 7 Kgs of Emulsion Bitumen (SS I) for 10sqm for preparatory to another Bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 for Approach Road.
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.5kgs Bitumen Emulsion (RS I) for 10m2 for preparatory to another Bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 for Approach Road.
Providing and laying 75mm thick Dense Bituminous Macadam using 0.40 cum of 37.50-13.20mm, 0.35 cum of 13.20-2.36mm and 0.36 cum of 2.36mm & below size IRC metal with 71.30kgs of VG30/VG40 bitumen for premixing per 10sqm including coat and conveyance of all materials to CMP site including heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 tones capacity, conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory/ Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, paver finisher/ 9m paver finisher, Vibratory/Pnematic roller and all other Tools and plants required, including fuel and all other and incidental charges etc., complete as per Specification using CMP as per clause 505 of MORTH rev-5 for Approach Road.
Providing and laying Bituminous concrete to 40mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50 - 2.36mm and 0.26 cum of 2.36mm and below with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, paver finisher/ 9m paver finisher, Vibratory roller and all other Tools and plants required, including fuel and all other and incidental charges etc., complete as per Specification using CMP as per clause 507 of MORTH rev-5 for Approach Road.
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete for Approach Road.
Earthwork excavation in all classes of soil on depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Foundation of Abutments, Piers and Return walls. (Considering average Ground Level). Above 2.00m depth
Plain Cement Concrete of Grade M-10, Nominal mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELING COURSE BELOW FOUNDATION OF RETAINING WALL, ABUTMENTS AND PIERS RESTING IN SOIL.
Vibrated Reinforced Cement Concrete of grade M35 Design Mix using 20mm ISS size hard granite broken graded metal including Cost and Conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel including cost of form work, soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, Tools and Plants including all other incidental charges etc., complete as per relevant standard specifications, for FOOTING OF ABUTMENTS AND RETURNS.
Vibrated Reinforced Cement Concrete of grade M35 Design Mix using 20mm ISS size hard granite broken graded metal including Cost and Conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel including cost of form work, soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, Tools and Plants including all other incidental charges etc., complete as per relevant standard specifications, for FOUNDATION OF PIERS.
Vibrated Reinforced Cement Concrete of grade M35 Design Mix using 20mm ISS size hard granite broken graded metal including Cost and Conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel including cost of form work, soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, Tools and Plants including all other incidental charges etc., complete as per relevant standard specifications, for FOUNDATION OF RETAINING WALL.
Vibrated Reinforced Cement Concrete of grade M35 Design Mix using 20mm ISS size hard granite broken graded metal including Cost and Conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel including cost of form work, soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, Tools and Plants including all other incidental charges etc., complete as per relevant standard specifications, for RETAINING WALL. (Below ground level)
Vibrated Reinforced Cement Concrete of grade M35 Design Mix using 20mm ISS size hard granite broken graded metal including Cost and Conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel including cost of form work, soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, Tools and Plants including all other incidental charges etc., complete as per relevant standard specifications, for RETAINING WALL. (Above ground level)
Vibrated Reinforced Cement Concrete of grade M35 Design Mix using 20mm ISS size hard granite broken graded metal including Cost and Conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel including cost of form work, soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, Tools and Plants including all other incidental charges etc., complete as per relevant standard specifications, for SUB STRUCTURE OF ABUTMENT AND RETURNS. (Below ground level)
Vibrated Reinforced Cement Concrete of grade M35 Design Mix using 20mm ISS size hard granite broken graded metal including Cost and Conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel including cost of form work, soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, Tools and Plants including all other incidental charges etc., complete as per relevant standard specifications, for SUB STRUCTURE OF ABUTMENT AND RETURNS. (Above ground level)
Vibrated Reinforced Cement Concrete of grade M35 design mix using 20mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for BED BLOCK CUM DIRT WALL OVER ABUTMENTS.
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mm ISS size hard granite broken graded metal including Cost and Conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel including cost of form work, soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, Tools and Plants including all other incidental charges etc., complete as per relevant standard specifications, for FOR COLUMN PIERS. (Below Ground level)
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mm ISS size hard granite broken graded metal including Cost and Conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel including cost of form work, soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, Tools and Plants including all other incidental charges etc., complete as per relevant standard specifications, for FOR COLUMN PIERS. (Above Ground level)
Vibrated Reinforced Cement Concrete of grade M35 Design mix using 20mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for CAPPING BEAM OVER PIERS.
Vibrated Reinforced Cement Concrete of grade M35 Design mix using 20mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for PEDESTAL OVER ABUTMENT AND PIERS.
Supply and fixing of Elastomeric bearing as shown in drawing including cost and conveyance to work site, labour for fixing the same in correct position and all other incidental charges etc., complete as per standard specifications.
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mm ISS size hard granite broken graded metal including Cost and Conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel including cost of form work, soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, Tools and Plants including all other incidental charges etc., complete as per relevant standard specifications, for T-BEAMS AND CROSS BEAMS.
Vibrated Reinforced Cement Concrete of grade M35 Design mix using 20mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DECK SLAB.
Supplying and installation of STRIP SEAL EXPANSION joint system conforming to specifications for Road and Bridge Works-IV Revision; 2001 Published by Ministry of Surface Transport (Roads Wing) in the 40mm wide expansion gap provided in between decks over piers and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly, including cost and conveyance of all materials, cost of testing as per the MOST specifications, including labour, equipment and incidental charges for fixing the joints complete in all respects, as per specifications.
Vibrated Reinforced cement concrete of grade M40 design mix using 20mm ISS graded hard granite broken metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel and including labour charges for mixing, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chages etc., complete for CRASH BARRIER.
Vibrated Plain Cement Concrete M15 grade Nominal Mix 1:2:4 using 40mm ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork, lead for soft water, labour charges for mixing, transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB.
Vibrated Reinforced cement concrete of grade M35 design mix using 20mm ISS graded hard granite broken metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel and including labour charges for mixing, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chages etc., complete for Approach Slab.
Providing and fixing of GI drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.
Vibrated Reinforced cement Concrete M35 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site but excluding cost and fabrication of steel including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab.
Providing and fixing Class I PVC seepage pipes of 100mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., complete.
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.
Filling behind Abutmants and Return walls with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering,with all leads for water and all other incidental charges etc, complete.
Supply and fabrication of Fe-500(HSD) steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete.
Supply and fabrication of Fe-240 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete.
Calculation of SubTotal, GST and Total carried out by system automatically
Sub Total Amount for above all items
GST 12% for the above SubTotal Amount
M RAJKUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx