| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC ASHRAM ROAD P O AND P S HAILAKANDI DIST HAILAKANDI ASSAM PIN 788151 | HAILAKANDI | ASSAM | 788151 | ₹1.8 Cr | L1 | Accepted-AOC Awarded Contract Bidder |
| 2 | L2₹1.8 Cr+₹2.4 L (1.36%)Rejected-AOC | ₹1.8 Cr+₹2.4 L (1.36%) | L2 | Rejected-AOC Rejected as L2 |
| 3 | L3₹1.9 Cr+₹12.4 L (6.90%)Rejected-AOC UJANKUPA II CITY TOWN HAILAKANDI P O UJANKUPA P S HAILAKANDI DISTRICT HAILAKANDI PIN 788152 | HAILAKANDI | ASSAM | 788152 | ₹1.9 Cr+₹12.4 L (6.90%) | L3 | Rejected-AOC Rejected as L3 |
| 4 | L4₹1.9 Cr+₹13.0 L (7.23%)Rejected-AOC 00 0 0 LD PALACE ROAD VILLAGE TOWN CHHOTAUDEPUR CITY VADODARA VADODARA GUJARAT 391165 INDIA | CHHOTAUDEPUR | GUJARAT | 391165 | ₹1.9 Cr+₹13.0 L (7.23%) | L4 | Rejected-AOC Rejected as L4 |
Tender Value
₹2.0 Cr
EMD Value
₹4.1 L
Closing Date
7 Aug 2024, 2:00 pmClosed
Chief Engineer, EAP, PWRD,Assam
O/o the Chief Engineer, EAP, PWRD, Fatasil Ambari,
CE/EAP/ARRBP/OCB/Bridges-2/Hailakandi/03 Construction of Bridge in Hailakandi district i. Br. No. 2/1 on Abdullapur Vernerpur Road ii. Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
2024_PWRDW_37897_23
CE/EAP/ARRBP02TENDERS2024/10
Open Tender
Civil Works - Bridges
Item Rate
720 days
Hailakandi
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,000
₹4.1 L
Yes
O/o the Chief Engineer, EAP, PWRD, Fatasil Ambari,
13 Feb 2025
9 Jul 2024
7 Aug 2024
9 Jul 2024
7 Aug 2024
9 Jul 2024
9 Jul 2024 - 22 Jul 2024
22 Jul 2024
Amount
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test Br. No. 2/1 on Abdullapur Vernerpur Road
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). B. (Lateral load test) Br. No. 2/1 on Abdullapur Vernerpur Road
Pile integrity test. Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job Br. No. 2/1 on Abdullapur Vernerpur Road
Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm) Br. No. 2/1 on Abdullapur Vernerpur Road
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m Br. No. 2/1 on Abdullapur Vernerpur Road
Levelling course for Pile cap Br. No. 2/1 on Abdullapur Vernerpur Road
Cement concrete for reinforced concrete in Pile cap complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) Br. No. 2/1 on Abdullapur Vernerpur Road
Cement concrete for reinforced concrete in Tie Beams complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) Br. No. 2/1 on Abdullapur Vernerpur Road
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in Foundation as per drawings and technical specifications Clauses 1000 and 1202 Br. No. 2/1 on Abdullapur Vernerpur Road
Plain/Reinforced cement concrete,(Box culvert including walls, haunches, Corbel, Riding Return wall) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M35 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump Br. No. 2/1 on Abdullapur Vernerpur Road
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 Box Culvert Structure(External wall, Internal wall, Corbel & Haunches,) Br. No. 2/1 on Abdullapur Vernerpur Road
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. Br. No. 2/1 on Abdullapur Vernerpur Road
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material Br. No. 2/1 on Abdullapur Vernerpur Road
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications (1000 mm c/c) Br. No. 2/1 on Abdullapur Vernerpur Road
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. Br. No. 2/1 on Abdullapur Vernerpur Road
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department Br. No. 2/1 on Abdullapur Vernerpur Road
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab & M35 RCC Crosss Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump Br. No. 2/1 on Abdullapur Vernerpur Road
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification Br. No. 2/1 on Abdullapur Vernerpur Road
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) Br. No. 2/1 on Abdullapur Vernerpur Road
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. Br. No. 2/1 on Abdullapur Vernerpur Road
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Br. No. 2/1 on Abdullapur Vernerpur Road
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Br. No. 2/1 on Abdullapur Vernerpur Road
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface Br. No. 2/1 on Abdullapur Vernerpur Road
Providing and fixing drainage spouts as per MORT & H specifications. Br. No. 2/1 on Abdullapur Vernerpur Road
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. Br. No. 2/1 on Abdullapur Vernerpur Road
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Br. No. 2/1 on Abdullapur Vernerpur Road
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Br. No. 2/1 on Abdullapur Vernerpur Road
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. Br. No. 2/1 on Abdullapur Vernerpur Road
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means Br. No. 2/1 on Abdullapur Vernerpur Road
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means Br. No. 2/1 on Abdullapur Vernerpur Road
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. Br. No. 2/1 on Abdullapur Vernerpur Road
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. Br. No. 2/1 on Abdullapur Vernerpur Road
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 i) 600mm equilateral triangle Br. No. 2/1 on Abdullapur Vernerpur Road
iii) 800mm x 600mm rectangular Br. No. 2/1 on Abdullapur Vernerpur Road
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) Br. No. 2/1 on Abdullapur Vernerpur Road
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Br. No. 2/1 on Abdullapur Vernerpur Road
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. Br. No. 2/1 on Abdullapur Vernerpur Road
Air quality monitoring at 3 locations for 2seasons for 2 consecutive years. (Construction Stage) Br. No. 2/1 on Abdullapur Vernerpur Road
Air quality monitoring at 3 locations for 2 seasons for 1year. (Operation Stage) Br. No. 2/1 on Abdullapur Vernerpur Road
Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) Br. No. 2/1 on Abdullapur Vernerpur Road
Water quality monitoring at 3l locations for 2 seasons for 1 year. (Operation Stage) Br. No. 2/1 on Abdullapur Vernerpur Road
Noise quality monitoring at 3Locations for 2 seasons for 2 consecutive years. (Construction Stage) Br. No. 2/1 on Abdullapur Vernerpur Road
Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) Br. No. 2/1 on Abdullapur Vernerpur Road
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) Br. No. 2/1 on Abdullapur Vernerpur Road
Soil quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) Br. No. 2/1 on Abdullapur Vernerpur Road
Cost of Training related to Capacity Building Br. No. 2/1 on Abdullapur Vernerpur Road
A Provisional sum (Fixed Amount) for the items of Utility Shifting and Operational health and safety of Rs. 94576.00 (not to be changed by the Bidders in BOQ) Br. No. 2/1 on Abdullapur Vernerpur Road
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). B. (Lateral load test) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Pile integrity test. Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Levelling course for Pile cap Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Cement concrete for reinforced concrete in Pile cap complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Cement concrete for reinforced concrete in Tie Beams complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in Foundation as per drawings and technical specifications Clauses 1000 and 1202 Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Plain/Reinforced cement concrete,(Box culvert including walls, haunches, Corbel, Riding Return wall) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M35 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 Box Culvert Structure(External wall, Internal wall, Corbel & Haunches,) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications (1000 mm c/c) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab & M35 RCC Crosss Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Providing and fixing drainage spouts as per MORT & H specifications. Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 i) 600mm equilateral triangle Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
iii) 800mm x 600mm rectangular Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Air quality monitoring at 3 locations for 2seasons for 2 consecutive years. (Construction Stage) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Air quality monitoring at 3 locations for 2 seasons for 1year. (Operation Stage) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Water quality monitoring at 3l locations for 2 seasons for 1 year. (Operation Stage) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Noise quality monitoring at 3Locations for 2 seasons for 2 consecutive years. (Construction Stage) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Soil quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
Cost of Training related to Capacity Building Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
A Provisional sum (Fixed Amount) for the items of Tree Cutting & Plantation and Operational health and safety of Rs. 8166.00 (not to be changed by the Bidders in BOQ) Br. No. 2/1 on NH-6 at Sorarpar to Rongpur Pt-VI
NIKI CONSTRUCTION (BID ID -236218)
GLOBAL CONSTRUCTION (BID ID -235906)
M/S S.K. Enterprise (BID ID -235611)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .