Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 CrAccepted-Finance CHHAPRAULI | BAHRAICH | UTTAR PRADESH | 271801 | L1 | Accepted-Finance L1 | |
| 2 | L2₹9.2 Cr+₹7.0 L (0.76%)Rejected-Finance KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Durga Engineers and Earth Movers L2 | M/S AJAY KUMAR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation in all type of soil with all lead and lift, including back filling,watering and ramming of excavated earth into the trenches or into the space between the structure, the sides of foundation trenches with removal and disposal of surplus earth required for proper completion of work as directed by the engineer-in-charge | 17,709.37 | Cum | 95.15 ₹16,85,046.56 Lowest | 99 ₹17,53,227.63 |
| 2.00 | Dewatering with all cost of power, P.O.L,machines, pump, well point system and operator etc. with assembling and deassembling of machines etc. required for proper completion of work | 14,400 | Hr/HP | 38.06 ₹5,48,064 | 37 ₹5,32,800 Lowest |
| 3.00 | Providing and Fixing Centering and shuttering of R.C.C./C.C. work including cost of all material, labour and T&P required for proper completion of work as directed by engineer-in-charge. | 19,222.82 | Sqm | 547.11 ₹1,05,16,997.05 Lowest | 665 ₹1,27,83,175.3 |
| 4.00 | Providing and laying Cement concrete A20 M15 (1:2:4) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 2,660.16 | Cum | 5,629.07 ₹1,49,74,226.85 Lowest | 6,300 ₹1,67,59,008 |
| 5.00 | Providing and laying Cement concrete A20 M20 (1:1.5:3) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 2,480 | Cum | 6,193.79 ₹1,53,60,599.2 Lowest | 7,000 ₹1,73,60,000 |
| 6.00 | Providing and laying Reinforced Cement concrete A20 M25 (1:1:2) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work as directed by engineer-in-charge. | 337.5 | Cum | 7,161.23 ₹24,16,915.13 Lowest | 9,000 ₹30,37,500 |
| 7.00 | Providing and laying Reinforcement Fe 550 (SAIL/TATA/ZINDALetc.) in cutting, bending, binding, welding and placing in Position inculiding all cost of material, labour and T&P etc. required for proper completion of work as per directed by engineer-in-charge. | 4.22 | MT | 70,954.92 ₹2,99,429.76 | 70,432.92 ₹2,97,226.92 Lowest |
| 8.00 | Earth work in embankment by power transported earth with lead beyond 200 m and upto 1 km including excavation, loading, unloading, comaction, ramming, dressing and all lifts etc. with all cost of labour, material and T&P etc. complete as per direction of Engineer in Charge. | 267.75 | Cum | 171.27 ₹45,857.54 Lowest | 450 ₹1,20,487.5 |
| 9.00 | Providing & Laying filtter 20mm to 40 mm size grit filling Under Boulder pitching including cost of material, labour, T&P etc. Complete of work. | 1,953.52 | Cum | 2,353.63 ₹45,97,863.28 | 336 ₹6,56,382.72 Lowest |
| 10.00 | Providing & Laying Sand filling Under Boulder Pitching including cost of material, labour, T&P etc. Complete of work. | 1,953.52 | Cum | 1,172.25 ₹22,90,013.82 | 63 ₹1,23,071.76 Lowest |
Tender Value
₹9.7 Cr
EMD Value
₹19.3 L
Closing Date
26 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE 1st IWC Meerut
Office of SE 1st IWC Meerut
As per the NIT
2026_UPIDC_1188008_6
15/SE-1/2026-27
Open Tender
Civil Works
Piece-work
180 days
Meerut
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹19.3 L
Office of SE 1st IWC Meerut
2 Nov 2026
20 Sept 2026
26 Sept 2026
20 Sept 2026
26 Sept 2026
20 Sept 2026
22 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation in all type of soil with all lead and lift, including back filling,watering and ramming of excavated earth into the trenches or into the space between the structure, the sides of foundation trenches with removal and disposal of surplus earth required for proper completion of work as directed by the engineer-in-charge | 17,709.37 | Cum | - | - |
| 2 | Dewatering with all cost of power, P.O.L,machines, pump, well point system and operator etc. with assembling and deassembling of machines etc. required for proper completion of work | 14,400 | Hr/HP | - | - |
| 3 | Providing and Fixing Centering and shuttering of R.C.C./C.C. work including cost of all material, labour and T&P required for proper completion of work as directed by engineer-in-charge. | 19,222.82 | Sqm | - | - |
| 4 | Providing and laying Cement concrete A20 M15 (1:2:4) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 2,660.16 | Cum | - | - |
| 5 | Providing and laying Cement concrete A20 M20 (1:1.5:3) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 2,480 | Cum | - | - |
| 6 | Providing and laying Reinforced Cement concrete A20 M25 (1:1:2) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work as directed by engineer-in-charge. | 337.5 | Cum | - | - |
| 7 | Providing and laying Reinforcement Fe 550 (SAIL/TATA/ZINDALetc.) in cutting, bending, binding, welding and placing in Position inculiding all cost of material, labour and T&P etc. required for proper completion of work as per directed by engineer-in-charge. | 4.22 | MT | - | - |
| 8 | Earth work in embankment by power transported earth with lead beyond 200 m and upto 1 km including excavation, loading, unloading, comaction, ramming, dressing and all lifts etc. with all cost of labour, material and T&P etc. complete as per direction of Engineer in Charge. | 267.75 | Cum | - | - |
| 9 | Providing & Laying filtter 20mm to 40 mm size grit filling Under Boulder pitching including cost of material, labour, T&P etc. Complete of work. | 1,953.52 | Cum | - | - |
| 10 | Providing & Laying Sand filling Under Boulder Pitching including cost of material, labour, T&P etc. Complete of work. | 1,953.52 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.92 MB
BOQ_2237611.xls
BOQ • 0.27 MB
TDUpload.pdf
Tender Documents • 7.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .