Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹38.2 LAccepted-AOC TUTICORIN TAMIL NADU | 1 | Accepted-AOC L1 | |
| 2 | 2₹35.9 L+₹3.0 L (9.08%)Rejected-AOC 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S YOGARAJ CONTRACTOR L1 | CKEE ENGINEERING PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for renewal of defective boiler tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. | 200 | No. | 13,31,000 ₹15,70,580 Lowest | 14,52,000 ₹17,13,360 |
| 2.00 | Charges for leading lifting of scaffolding materials and erection of platform and scaffolding at S.H/W.W screen tube area and ‘S’ panel area to conduct Boiler tube thickness survey and tube rectification work and removal of platform and scaffolding. | 350 | No. | 18,01,800 ₹21,26,124 Lowest | 19,65,600 ₹23,19,408 |
| 3.00 | Charges for transporting of 1 No. sky climber from Boiler maintenance stores to site, erection of sky climber for renewal of water wall tubes in Boiler and removal of sky climber, return back to stores after completion of works | 1 | No. | 76,623 ₹90,415.14 Lowest | 83,588 ₹98,633.84 |
| 4.00 | Charges for Shifting the sky climber inside the boiler from one location to other location. | 100 | Mtr. | 85,500 ₹1,00,890 Lowest | 93,200 ₹1,09,976 |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
26 Feb 2026, 2:00 pmClosed
CE/ TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit I Replacement of boiler pressure parts tubes bends in II pass of Unit I Boiler during overhaul for the year 2025 2026
2026_EB_654241_1
CE/TTPS/SE/M-II/No.420/2025-26
Open Tender
Miscellaneous Works
Item Rate
40 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹30,000
Yes
8 Sept 2026
10 Feb 2026
27 Feb 2026
10 Feb 2026
26 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for renewal of defective boiler tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. | 200 | No. | 55 | ₹11,000 |
| 2 | Charges for leading lifting of scaffolding materials and erection of platform and scaffolding at S.H/W.W screen tube area and ‘S’ panel area to conduct Boiler tube thickness survey and tube rectification work and removal of platform and scaffolding. | 350 | No. | 55 | ₹19,250 |
| 3 | Charges for transporting of 1 No. sky climber from Boiler maintenance stores to site, erection of sky climber for renewal of water wall tubes in Boiler and removal of sky climber, return back to stores after completion of works | 1 | No. | 55 | ₹55 |
| 4 | Charges for Shifting the sky climber inside the boiler from one location to other location. | 100 | Mtr. | 55 | ₹5,500 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_784496.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .