Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical AT KANTAPAHADA P S PO BANKI GHOLAPUR DIST CUTTACK | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
10 Sept 2026, 5:00 pmClosed
Chief Construction Engineer,RWC,Angul
ANGUL
Construction of Day Care PHC Building at Ambajhari under Boudh Block in the District of Boudh for the year 2025-26
2026_CERWI_139909_1
Building Online-AGL-16/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
540 days
Boudh
2 documents required · 2 mandatory
₹10,000
₹1.2 L
Yes
11 Sept 2026
1 Sept 2026
11 Sept 2026
1 Sept 2026
10 Sept 2026
1 Sept 2026
1 Sept 2026 - 9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil or gravelly soil including dressing and leveling the bed and disposal of the excavated materials with mechanical means within 5.00km. initial leads and lifts as per direction of E.I.C.. complete as per specification and direction of the Engineer in charge. | 304.67 | cum | 282.9 | ₹86,191.94 |
| 2 | Providing filling good clean river sand of approved quality including watering to complete saturation ramming complete including cost conveyance, royalty, additional charges, DMF 10 PERCNT EMF 5 PERCNT over royalty Cess taxes of all materials cost of all labour TP required for the work etc complete as per specification direction of Engineer in Charge. | 455.81 | cum | 802.4 | ₹3,65,741.94 |
| 3 | Providing Cement concrete (1:3:6) in foundation upto a required depth below ground level and upto a required height above ground leveL bed level using 4cm size hard granite metal of approved quality from approved quarry including hoisting, lowering, laying compacting in position in layers not exceeding 15cm thick compacting with proper packing to proper slope level including watering, curing and cost, conveyance, Cess royality, additional charges, DMF 10PERCNT EMF 5PERCNT over royalty taxes of all materials etc. with all labour and T P required for the work including dewatering, shuttering if necessary complete as per direction of Engineer in charge | 80.23 | cum | 6,000 | ₹4,81,395 |
| 4 | R.C.C. M-25 grade with 20mm and down grade C.B. chips including watering, curing, cenering and shuttering with all cost, additional charges, DMF 10 PERCENT EMF 5 percent over royalty taxes of all materials etc, cess with T P, conveyance taxes etc. complete as per the direction of the Engineer in charge.
Footing/ Column Base | 74.57 | cum | 6,691 | ₹4,98,927.8 |
| 5 | R.C.C. M-25 grade with 20mm and down grade C.B. chips including watering, curing, cenering and shuttering with all cost, additional charges, DMF 10 PERCENT EMF 5 percent over royalty taxes of all materials etc, cess with T P, conveyance taxes etc. complete as per the direction of the Engineer in charge.
Column | 19.06 | cum | 18,513.3 | ₹3,52,887.57 |
| 6 | R.C.C. M-25 grade with 20mm and down grade C.B. chips including watering, curing, cenering and shuttering with all cost, additional charges, DMF 10 PERCENT EMF 5 percent over royalty taxes of all materials etc, cess with T P, conveyance taxes etc. complete as per the direction of the Engineer in charge.
Head Room | 1.17 | cum | 21,077.4 | ₹24,685.85 |
| 7 | R.C.C. M-25 grade with 20mm and down grade C.B. chips including watering, curing, cenering and shuttering with all cost, additional charges, DMF 10 PERCENT EMF 5 percent over royalty taxes of all materials etc, cess with T P, conveyance taxes etc. complete as per the direction of the Engineer in charge.
Plinth Beam | 22.59 | cum | 7,565.4 | ₹1,70,902.39 |
| 8 | R.C.C. M-25 grade with 20mm and down grade C.B. chips including watering, curing, cenering and shuttering with all cost, additional charges, DMF 10 PERCENT EMF 5 percent over royalty taxes of all materials etc, cess with T P, conveyance taxes etc. complete as per the direction of the Engineer in charge.
Lintel | 9.86 | cum | 14,404.7 | ₹1,42,057.71 |
| 9 | R.C.C. M-25 grade with 20mm and down grade C.B. chips including watering, curing, cenering and shuttering with all cost, additional charges, DMF 10 PERCENT EMF 5 percent over royalty taxes of all materials etc, cess with T P, conveyance taxes etc. complete as per the direction of the Engineer in charge.
Chajja | 21.97 | sqm | 1,256.7 | ₹27,605.93 |
| 10 | R.C.C. M-25 grade with 20mm and down grade C.B. chips including watering, curing, cenering and shuttering with all cost, additional charges, DMF 10 PERCENT EMF 5 percent over royalty taxes of all materials etc, cess with T P, conveyance taxes etc. complete as per the direction of theEngineer in charge.
Staircase | 3.46 | cum | 15,936.1 | ₹55,196.28 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.24 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_607832.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .