Loading…
Loading…
Tender Value
₹11.6 L
EMD Value
₹23,270
Closing Date
28 Sept 2026, 6:00 pm6d left
Executive Engineer
RnB Division Kralpora
Development of Road/ Lane from General Road to Sonthipora Gund by way of Paver Blocks
2026_PWDJK_325526_5
E tendering NIT No 40/RnB/Kralpora of 2026-27
Open Tender
Civil Works
Percentage
15 days
Kralpora
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer RnB Division Kralpora
₹23,270
21 Sept 2026
21 Sept 2026
29 Sept 2026
21 Sept 2026
28 Sept 2026
21 Sept 2026
21 Sept 2026 - 26 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m,including getting out excavated earth and disposal of surplus excavated earth in all kinds of soil | 13.05 | Cum | 256.85 | ₹3,351.89 |
| 2 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 617.7 | Sqm | 24.12 | ₹14,898.92 |
| 3 | Supply and filling of dry stone soling in foundation trenches tightly handpacked with hand ramming, watering and compacting to required density including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 70.47 | Cum | 1,000 | ₹70,470 |
| 4 | Providing and laying in position cement concrete 1:4:8 grade (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) including curing but excluding the cost of centring and shuttering all work upto plinth level. | 49.59 | Cum | 5,202.9 | ₹2,58,011.81 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns, including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 348 | Sqm | 286.35 | ₹99,649.8 |
| 6 | Providing & laying in position specified grade of cement concrete, including the cost of centering, shuttering, finishing. All work up to plinth level in 1: 2: 4 (1 cement: 2 coarse sand: 4 graded stone aggregate) 20mm nominal size Crushed. | 26.1 | Cum | 6,591.25 | ₹1,72,031.63 |
| 7 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge.including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 617.7 | Sqm | 816.15 | ₹5,04,135.86 |
| 8 | Carriage of stone aggregrate below 40mm from an average lead of around 10 Km to site of work by Mechanical Transport | 68.12 | Cum | 279.04 | ₹19,008.2 |
| 9 | Carriage of sand from an average lead of around 40 Km to site of work by Mechanical Transport | 34.06 | Cum | 630.74 | ₹21,483 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.30 MB
BOQ_1100347.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .