| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.1 LAccepted-Finance | L1 | Accepted-Finance Rate Quoted Less than Estimate | |
| 2 | L2₹30.1 L+₹4,435.72 (0.15%)Rejected-Finance | L2 | Rejected-Finance Rate Quoted More than Estimate |
Tender Value
₹31.0 L
EMD Value
₹31,000
Closing Date
24 Jul 2023, 3:00 pmClosed
Block Development Officer (V.Pt)
Anakkavoor
Execution of AGAMT II 2023-2024 - Rejunevation of Nallathaneer Kulam Desilting Bathing ghat inlet outlet lining Wall Providing Paver Block in Madha Kovil street and Society street and CC Road Othavadai St and Const of Threshing Floor at Alathur Panc
2023_RDTN_345468_1
Roc. No. 2845/2023/A13-1 Date. 22/06/2023
Open Tender
Civil Works - Others
Item Rate
90 days
Anakkavoor
Please refer Tender Documents
3 documents required · 3 mandatory
₹0
₹31,000
Yes
26 Jul 2023
17 Jul 2023
24 Jul 2023
17 Jul 2023
24 Jul 2023
17 Jul 2023
Amount
Rejunevation of Nallathaneer Kulam ( Desilting Bathing ghat, inlet outlet, lining Wall) @ Alathur Panchayat AGAMT II 2022-23
Clearing light jungles including all charges
Sectioning during forming bunds when earth moving machinery.lorres and rollers are used for consoloidation
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
Provision for Bathing Ghat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:2:4 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
BABY POND LINING WALL
Earth work excavation and depositing onsides with initial lead of 10 meter and initial lift of 2 meters in sand,silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth SS 20 B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to all material to site and all labour charges etc., complete
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour chages etc.,
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Provision for Inlet
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 :4 : 8mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erection of centering for retaining wall and bathing ghat including cost and conveyance of all material and all labour charges etc, complete
Providing Paver Block in Madha Kovil street at Alathur Panchayat AGAMT II 2023-24
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
C.C.1:2:4 using 20mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .GSB Grading III
Flooring with paver block 60 mm thickness laid over, interlocking blocks including cost and conveyance and all labour charges for 10 m2
Providing Paver Block in Society street at Alathur Panchayat AGAMT II 2023-24
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
C.C.1:2:4 using 20mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .GSB Grading III
Flooring with paver block 60 mm thickness laid over, interlocking blocks including cost and conveyance and all labour charges for 10 m2
Providing Cement Concrete Road in Othavadai Street at Alathur Panchayat AGAMT II 2023-24
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Supplying and erecting centering for sides and soffits etc completed
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
C.C.1:2:4 using 20mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Provision for Bitumen pad in 12mm thick
Construction of Threshing Floor (SR No 73) at Alathur Panchayat AGAMT II 2023-24
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Collection & Supply of US Gravel with 1 Km lead including cost and conveyance to the site and all labour etc complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
CC 1:3:6 mix using 20mm ISS HBG Metal including cost and conveyance of to site and all labour charges etc., comp
CC 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of to site and all labour charges etc., comp
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.C Ramu
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .