| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹60.5 LAccepted-AOC OPP EXHIBITION GATE MEERUT ROAD MUZAFFARNAGAR U P | MUZAFFARNAGAR | MUZAFFARNAGAR | UTTAR PRADESH | ₹60.5 L | 1 | Accepted-AOC DUE TO LOWER RATES |
| 2 | 2₹1.4 Cr+₹79.5 L (131.4%)Rejected-Finance | ₹1.4 Cr+₹79.5 L (131.4%) | 2 | Rejected-Finance DUE TO HIGHER RATES |
| 3 | 3₹1.6 Cr+₹99.5 L (164.5%)Rejected-Finance 406 KONARK EPITOME NEAR KONARK CAMPUS VIMAN NAGAR PUNE PUNE MAHARASHTRA 411014 | PUNE | MAHARASHTRA | 411014 | ₹1.6 Cr+₹99.5 L (164.5%) | 3 | Rejected-Finance DUE TO HIGHER RATES |
| 4 | 4₹1.8 Cr+₹1.2 Cr (194.2%)Rejected-Finance | ₹1.8 Cr+₹1.2 Cr (194.2%) | 4 | Rejected-Finance DUE TO HIGHER RATES |
| 5 | 5₹1.9 Cr+₹1.3 Cr (212.4%)Rejected-Finance | ₹1.9 Cr+₹1.3 Cr (212.4%) | 5 | Rejected-Finance DUE TO HIGHER RATES |
| Sl No | Description | Qty | Unit | Privilege Biksons Boilers Pvt. Ltd. L3 | ARJUNWADKAR FOUNDRIES PRIVATE LIMITED L5 | M/S GAMBHEER ENGINEERS AND TRADERS L1 | Rayoman Bahadur Engineer L4 | NANDI ENGINEERS & CONTRACTORS L2 |
|---|---|---|---|---|---|---|---|---|
| 1.10 | Design, Dismantling , Supply, Post weld heat treatment (stress relieving), Erection And Commissioning of steam line ( working pressure 72 kg/cm2) with auxiliaries from main steam header to Turbine inlet.
All other details of material is in PDF file.
Scope of work includes :
1. Dismantling and removal of existing steam line.
2. Supply of new steam line and auxiliaries as per drawing and specifications.
3. Erection, commissioning and post weld heat treatment (stress relieving) of new steam line.
4. Insulation and lagging on high pressure line as per IBR standards.
5. IBR approval for the replaced steam line. | 1 | Total | 1,60,00,000 ₹1,60,00,000 | 1,89,00,000 ₹1,89,00,000 | 60,50,000 ₹60,50,000 Lowest | 1,78,00,000 ₹1,78,00,000 | 1,40,00,000 ₹1,40,00,000 |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
27 Jul 2026, 9:00 amClosed
M.D
SUGAR MILLS ROHTAK
DESIGN DISMANTLING SUPPLY ERECTION AND COMMISSIONING OF STEAM LINE
2026_HBC_535424_1
ROHTAKSUGARWORK/17.07.2026/01
Open Tender
Miscellaneous
Works
90 days
SUGAR MILL ROHTAK
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
₹1.6 L
10 Sept 2026
17 Jul 2026
27 Jul 2026
17 Jul 2026
27 Jul 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Design, Dismantling , Supply, Post weld heat treatment (stress relieving), Erection And Commissioning of steam line ( working pressure 72 kg/cm2) with auxiliaries from main steam header to Turbine inlet.
All other details of material is in PDF file.
Scope of work includes :
1. Dismantling and removal of existing steam line.
2. Supply of new steam line and auxiliaries as per drawing and specifications.
3. Erection, commissioning and post weld heat treatment (stress relieving) of new steam line.
4. Insulation and lagging on high pressure line as per IBR standards.
5. IBR approval for the replaced steam line. | 1 | Total | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
BOQ_614523.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .