Tender Value
₹5.1 L
EMD Value
₹5,110
Closing Date
14 Sept 2022, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER(B.Pt)
BDO OFFICE KORADACHERY
1.REPAIRS TO PUM SCHOOL RCC ROOF BUILDING(E/F) 2.REPAIRS TO PUM SCHOOL RCC ROOF BUILDING(S/F) 3.REPAIRS TO PUM SCHOOL GIRLS TOILET BUILDING (S/F) 4.REPAIRS TO PUM SCHOOL BOYS TOILET BUILDING (S/F) 5.REPAIRS TO PUM SCHOOL GRILS TOILE
2022_RDTN_249810_1
1349/2022/A3/29.08.2022
Open Tender
Civil Works - Buildings
Item Rate
180 days
Koradacchery Block
As Per Tender Document
3 documents required · 3 mandatory
₹0
₹5,110
Yes
15 Sept 2022
3 Sept 2022
14 Sept 2022
3 Sept 2022
14 Sept 2022
3 Sept 2022
Amount
1.REPAIRS TO PUM SCHOOL RCC ROOF BUILDING(E/F)
Dismantling the damaged chiping removing away from the site including all chages etc for completed
dismantiling the damaged ceiling crack removing away from the site including all chages etc for completed
platering with CM 1;3 mix 10mm thick including cost and conveying and all labour charges etc., completed
platering with CM 1;5 mix 12mm thick including cost and conveying and all labour charges etc., completed
providing granolethic floor finish in cement concrete 1`:2;4 MIX USING 10-12MM ISS METAL TO 25MM thick including cost and conveyance of all materials to site and all labour charges for mixing laying curing etc., comlete for 10cum
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Black board Painting two coats using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
brick jelly lime concrete using 20 mm brick jelly with slacked lime in the ratio of 32:12.5 including cos and conveance of all materials to site and all labour chrges for mixing laying,and fnixing ect.,complete for 10cum
Finishing the top of roof with one course of PRESSED TILES of size 23cm x x 23 cm x 2cm of approved quality laid in cement mortar 1:3 ( one cement and three sand ) 12mm thick mixed with water proofing compound conforming to I.S at 2% by weight of cement
Pointing with CM 1:3 to full depth of tiles using including 10% by weight of cement inlcuding cost And conveyance of all materials to site and all labour charges etc.,completed
Repairs to Door and Window
Window
2.REPAIRS TO PUE SCHOOL RCC ROOF BUILDING(S/F)
Dismantling the execting damaged plastering including cost and conveyance and all labour charges etc., completed
Dismantling the execting damaged Concrete removing away from the site including cost and conveyance and etc., completed
cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveying of all materials and all labour chages etc,.complete
floor finishing with anti skid tiles of size 20cmx20cm including cost and conveying of all matriyal to site and all labour charges etc complete
dadooing of wall with glazed tiles of size white cement using 0.4kg/cm2
platering with cm 1:5mix 12mm thick including cost and conveyance and all labour charges etc., completed
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
casting and fixing of RCC precast slab of following thick 1;2;4 using 20mm hbg jelly
repairs to door
supply and fixing of IWC including all costand conveyance of all chareges etc
provision for septic tank charges and toilet
Provision for water supply arrangment
3.REPAIRS TO MELARATHANALLUR PUM SCHOOL GIRLS TOILET BUILDING (S/F)
dismanting the damaged plastering removeing away from the site including all chages etc for completed
plastering with CM 1:5mix,12mm thick including cost and conveying and all labour charges etc., completed
plastering with CM 1:3mix,10mm thick including cost and conveying and all labour charges etc., completed
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
White washing two coats using shell lime including cost of materils and all labour charges etc., completed for 100sqm
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Repairs to door and windows and welding and hooks all charges ect
provision for septic tank charges and toilet
4.REPAIRS TOPUM SCHOOL BOYS TOILET BUILDING (S/F)
dismantiling the damaged plastering removing away from the site including all charge ect for completed
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
providing granolethic floor finish in cement concrete 1`:2;4 MIX USING 10-12MM ISS METAL TO 25MM thick including cost and conveyance of all materials to site and all labour charges for mixing laying curing etc., comlete for 10cum
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Repair to door and window and welding and hooks and all charges ect.,
provision for septic tank charges and toilet
5.REPAIRS TO PUM SCHOOL GRILS TOILET BUILDING(S/F)
Dismantling the damaged plastering removing away from the site including all charge etc for completed
dismantling the damaged concrete removing away from the site including all charges etc for completed
earth work excavation in hard stiff clayee sol and all classes of soil and depositing on bank eith initial lead and lift as per SS 20B
Sand filling with good river sand including cost and conveying of materials to site including watering and compacting etc.,complete.
brick work in cement mortar 1;5 MIX USING COUNTRY BRICKS 83/4'' X 41'' X 23/4'' and conveyance of all materials to site and All labour charges etc., complete
plastering with cm 1;5MIX,12MM THICK including cost and conveynace and all labour charges etc,. Completed
cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveying of all materials and all labour chages etc,.complete
floor finishing with anti skid tiles of size 20cmx20cm including cost and conveying of all matriyal to site and all labour charges etc complete
dadooing of wall with glazed tiles of size white cement using 0.4kg/cm2
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
supply and fixing of EWC including all costand conveyance of all chareges etc
Repairs to Door and Window
provision for septic tank charges and toilet
provision for Hand rail SS
provision for incinator
6.REPAIRS TO PUM SCHOOL STAFF TOILET BUILDING (E/F)
Dismantling the damaged plastering removing away from the site including all charge etc for completed
dismantling the damaged concrete removing away from the site including all charges etc for completed
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance and all labour charges etc completed
cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveying of all materials and all labour chages etc,.complete
floor finishing with anti skid tiles of size 20cmx20cm including cost and conveying of all matriyal to site and all labour charges etc complete
dadooing of wall with glazed tiles of size white cement using 0.4kg/cm2
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
White washing two coats using shell lime including cost and conveyance of all materils to site and all labour charges etc., completed
Exterior emulsion two coats with best approvde plastic emulsion including cost and conveyance of including all cost and conveyance of all charges etc
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
supply and fixing of EWC including all costand conveyance of all chareges etc
supply and fixing of IWC including all costand conveyance of all chareges etc
supply and fixing of wash basin including all costand conveyance of all chareges etc
provision for septic tank charges and toilet
provision forwater supply arrangement
provision for sanitary arrangment
provision for hand rail
7.REPAIRS TO MELARADAHNALLUR PUM SCHOOL WATER TANK
Dismantling the Damaged Wall Crack removing away from the site including all charges
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Casting and Fixing of RCC PreCast Slab including all Charges etc
Provision for Water Tap
8.REPAIR TO KITCHEN SHED PUE SCHOOL
dismantling the damaged concrete removing away from the site including all charges etc for completed
Dismantling the damaged plastering removing away from the site including all charge etc for completed
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveying of all materials and all labour chages etc,.complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Painting two coats over New iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Finishing the top of roof with one course of PRESSED TILES of size 23cm x x 23 cm x 2cm of approved quality laid in cement mortar 1:3 ( one cement and three sand ) 12mm thick mixed with water proofing compound conforming to I.S at 2% by weight of cement
Supply and Fixing of New Door and Window including all Charges etc for Completd
Ventilator
Window
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RAVIKUMAR B
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .