| 1 | Rejected-Technical AT PO BANDHUGAON PIN 764027 | BANDHUGAON | KORAPUT | ODISHA | 764027 | Rejected-Technical Disqualified in technical evaluation as per clause no. 119 in the DTCN |
| 2 | Rejected-Technical | Rejected-Technical Disqualified in technical evaluation as per clause no. 119 in the DTCN |
| 3 | Rejected-Technical | Rejected-Technical to Single tender in the first-time tender call as per Works Department Office memorandum No.16 dtd.01.01.2015 |
| 4 | Rejected-Technical AT SANASARAPALLI PO PS BANDHUGAON DIST KORAPUT 764027 | BANDHUGAON | KORAPUT | ODISHA | 764027 | Rejected-Technical Disqualified in technical evaluation as per clause no. 119 in the DTCN |
Tender Value
₹89.8 L
EMD Value
₹90,000
Closing Date
22 Jun 2026, 5:00 pmClosed
Divisional Officer
ROADS and BUILDINGS DIVISION, KORAPUT
12564-Construction of KGBV Hostel Building at Govt. M.E. School Vandhugaon Block in the district of Koraput for the year 2026-27
2026_EICCL_131854_1
SE (R and B) KPT-04/2026-27
Open Tender
Civil Works - Buildings
Piece-work
270 days
Koraput
2 documents required · 2 mandatory
₹10,000
₹90,000
Yes
18 Jul 2026
11 Jun 2026
23 Jun 2026
11 Jun 2026
22 Jun 2026
11 Jun 2026
11 Jun 2026 - 22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS Earth work in excavation of foundation of structures in hard soil as per drawing and technical specification, including setting out, shoring, strutting and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom to required level and line, back filling the excavated earth to the extent required including compaction and utilising the remaining earth locally for road work including all Cost, Conveyance, royalties of all materials, labour, T and P , cess and machinaries required for the work etc. complete as per direction of the Engineer-In-Charge. (GROUND FLOOR) | 235.82 | cum | 311.53 | ₹73,465 |
| 2 | Supplying filling in foundation and plinth with sand including watering ramming complete with all leads and lifts etc., complete including cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (GROUND FLOOR) | 191.4 | cum | 699.24 | ₹1,33,834.54 |
| 3 | Plain Cement concrete of proportion (1:3:6) using 40mm size C.B.H.G. metal of approved quality from approved quarry including hoisting, lowering and laying in layers to the required thickness including ramming, watering and curing etc., complete including cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (GROUND FLOOR) | 50.04 | cum | 6,195.11 | ₹3,10,003.3 |
| 4 | Cement Concrete prop (1:2:4) using 12mm size H. G. chips of approved quality from approved quarry including hoisting, lowering and laying concrete in layers, watering, curing etc., complete including cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (FIRST FLOOR) | 1.07 | cum | 8,319.67 | ₹8,902.05 |
| 5 | Flyash brick masonary in C.M.(1:6) in Foundation and Plinth using 9 size flyash bricks including splays cutting, circular moulding, champering and corbelling, watering and curing etc., complete including cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (GROUND FLOOR) | 33.88 | cum | 5,636.35 | ₹1,90,959.54 |
| 6 | R.C.C. work of M-20 in following works using 12 mm. to 20 mm. (½ to ¾) size (20 mm. not to exceed 25 percent) hard black crusher broken granite stone chips of approved quality from approved quarry including hoisting, lowering, laying and compacting concrete, watering curing, centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties of all materials with all labour and T and P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S. rods or Tor steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding and tying the grills and placing in proper position and as per the direction of the Engineer-in-charge. Coloumn Base (GROUND FLOOR) | 33.77 | cum | 6,716.29 | ₹2,26,809.11 |
| 7 | Plinth Bend (GROUND FLOOR) | 14.8 | cum | 7,590.67 | ₹1,12,341.92 |
| 8 | Lintel Band (Ground floor) | 7.42 | cum | 14,430.33 | ₹1,07,073.05 |
| 9 | First floor | 0.98 | cum | 16,172.92 | ₹15,849.46 |
| 10 | Second floor | 0.58 | cum | 18,257.75 | ₹10,589.49 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.05 MB
Tendernotice_1.pdf
PDF • 1.88 MB
BOQ_596036.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .