Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
2 Sept 2026, 5:00 pm5d left
EXECUTIVE ENGINEER REW KISHTWAR
HALL NO. 4 O/O EXECUTIVE ENGINEER REW KISHTWAR
Refer BoQ
2026_RDPR_322436_35
e-NIT No 96 of REW KISHTWAR 2026-27 Dated. 25.08.2026
Open Tender
Civil Works
Percentage
Kishtwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹7,000
27 Aug 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
2 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: | 0.08 | cum | 479.3 | ₹38.34 |
| 2 | CAST-IN-SITU
Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level5.1.3 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 0.53 | cum | 7,104.35 | ₹3,765.31 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level
5.22.1 Mild steel and medium tensile steel bars | 47.93 | KG | 115.35 | ₹5,528.73 |
| 4 | Chequerred precast cement concrete tiles 22mm thick in footpath and
courtyard, jointed with neat cement slurry mixed with pigment to match
the shade of the tiles, including rubbing, cleaning and curing complete,
on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) . | 108 | SQM | 903.85 | ₹97,615.8 |
| 5 | Steel work welded in built up sections/framed work, including cutting,
hoisting, fixing in position and applying a priming coat of approved steel
primer using structural steel etc. as required. 10.25.2 In gratings, frames, guard bar, ladder, railings, brackets, gates and
similar works. | 1,220 | KG | 181.6 | ₹2,21,552 |
| 6 | Structural steel work in built up sections, trusses and framed work,
including cutting, hoisting, fixing in position and applying a priming coat of
approved steel primer all complete | 105 | KG | 138.2 | ₹14,511 |
| 7 | C/O SAND AND AGG | 0.71 | CUM | 1,904.58 | ₹1,352.25 |
| 8 | CIB | 1 | NO | 1,000 | ₹1,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_1081140.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].