Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.9 LAdmitted-Finance | ₹47.9 L | L1 | Admitted-Finance |
| 2 | L1₹47.9 LAdmitted-Finance | ₹47.9 L | L1 | Admitted-Finance |
| 3 | L1₹47.9 LAdmitted-Finance | ₹47.9 L | L1 | Admitted-Finance |
| 4 | L1₹47.9 LAdmitted-Finance | ₹47.9 L | L1 | Admitted-Finance |
| 5 | L1₹47.9 LAdmitted-Finance | ₹47.9 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Dipak Sutradhar L1 | M/S K.B. ENGINEERS L1 | MS D.M. ENTERPRISE L1 | PRAKASH ENTERPRISES L1 | M/S M R ENTERPRISE L1 | M/S R.M. ENTERPRISE L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing of deposited compact water hyacinth root, waterweeds, other aquatic plants, garbage, plastics etc. from the bed of Bondajan channel including cutting, removing and stacking at places away from the bank etc of the channel complete with all lead and lift as directed | 12,822 | sqm | 124.81 ₹16.0 L | 124.81 ₹16.0 L | 124.81 ₹16.0 L | 124.81 ₹16.0 L | 124.81 ₹16.0 L | 124.81 ₹16.0 L |
| 2.00 | Shifting of Departmental barge to work site at Bondajan Channel with 2 (two) no. heavy duty hydraulic crane and 1 (one) no. trailer from Central Workshop, Basistha to worksite at Bondajan Channel & back to Central Workshop , Basistha.
i) For heavy duty crane (2 Cranes x2 operations = 4 operations) | 4 | oprn | 15,000 ₹60,000 | 15,000 ₹60,000 | 15,000 ₹60,000 | 15,000 ₹60,000 | 15,000 ₹60,000 | 15,000 ₹60,000 |
| 3.00 | ii) For low bed trailer (1 Trailer x 2 operations = 2 operations) | 2 | oprn | 12,500 ₹25,000 | 12,500 ₹25,000 | 12,500 ₹25,000 | 12,500 ₹25,000 | 12,500 ₹25,000 | 12,500 ₹25,000 |
| 4.00 | Earth work in desiltation & excavation of outlet channel by deployment of hired Chain Mounted Hydraulic Excavator 71/80 (bucket capacity 0.06 cum) to proper grade and slope as required section including cutting and cleaning the channel bed & slope and removing all kinds of debris, deposited silt, vegetation etc. as directed including operator on daily basis considering 7 to 9 working hours per day and excluding cost of fuel/POL. | 900 | Hour | 1,534 ₹13.8 L | 1,534 ₹13.8 L | 1,534 ₹13.8 L | 1,534 ₹13.8 L | 1,534 ₹13.8 L | 1,534 ₹13.8 L |
| 5.00 | Earth work in desiltation & excavation of outlet channel by deployment of hired Chain Mounted Hydraulic Excavator 210 / 220 (bucket capacity 0.09 cum) to proper grade and slope as required section including cutting and cleaning the channel bed & slope and removing all kinds of debris, deposited silt, vegetation etc. as directed including operator and cost of fuel/POL etc. on daily basis considering 7 to 9 working hours per day. | 450 | Hour | 3,333 ₹15.0 L | 3,333 ₹15.0 L | 3,333 ₹15.0 L | 3,333 ₹15.0 L | 3,333 ₹15.0 L | 3,333 ₹15.0 L |
| 6.00 | Ordinary labours engaged to facilitate the intermittent cleaning and other allied works of the Bondajan Channel for removal of floating garbage, plastic etc coming from rain water and through connected channel by manually & maintenance of the Bondajaan channel throughout the rainy season. | 500 | No. | 402 ₹2.0 L | 402 ₹2.0 L | 402 ₹2.0 L | 402 ₹2.0 L | 402 ₹2.0 L | 402 ₹2.0 L |
| 7.00 | Hire charge of one no. Country boat with capacity of 20 to 40 Quintal (without boatman) to facilitate periodical cleaning & maintenance of the Bondajan Channel. | 30 | Day | 738 ₹22,140 | 738 ₹22,140 | 738 ₹22,140 | 738 ₹22,140 | 738 ₹22,140 | 738 ₹22,140 |
Tender Value
₹47.9 L
EMD Value
₹95,778
Closing Date
13 Mar 2026, 2:00 pmClosed
Addl Chief Engineer, Mech Zone WRD, Assam
O/o The Addl Chief Engineer, Mech Zone WRD, Assam, Ghy 29
Cleaning and de siltation of the Bondajan Channel on the downstream side from Bondajan sluice gate to its outfall into the River Brahmaputra for the year 2026 27.
2026_DoWR_51661_1
ACE (Mech) WR/G-17/ 2025/465
Open Tender
Civil Works
Guwahati
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹95,778
Yes
29 May 2026
4 Mar 2026
13 Mar 2026
4 Mar 2026
13 Mar 2026
5 Mar 2026
Clearing of deposited compact water hyacinth root, waterweeds, other aquatic plants, garbage, plastics etc. from the bed of Bondajan channel including cutting, removing and stacking at places away from the bank etc of the channel complete with all lead and lift as directed
Shifting of Departmental barge to work site at Bondajan Channel with 2 (two) no. heavy duty hydraulic crane and 1 (one) no. trailer from Central Workshop, Basistha to worksite at Bondajan Channel & back to Central Workshop , Basistha. i) For heavy duty crane (2 Cranes x2 operations = 4 operations)
ii) For low bed trailer (1 Trailer x 2 operations = 2 operations)
Earth work in desiltation & excavation of outlet channel by deployment of hired Chain Mounted Hydraulic Excavator 71/80 (bucket capacity 0.06 cum) to proper grade and slope as required section including cutting and cleaning the channel bed & slope and removing all kinds of debris, deposited silt, vegetation etc. as directed including operator on daily basis considering 7 to 9 working hours per day and excluding cost of fuel/POL.
Earth work in desiltation & excavation of outlet channel by deployment of hired Chain Mounted Hydraulic Excavator 210 / 220 (bucket capacity 0.09 cum) to proper grade and slope as required section including cutting and cleaning the channel bed & slope and removing all kinds of debris, deposited silt, vegetation etc. as directed including operator and cost of fuel/POL etc. on daily basis considering 7 to 9 working hours per day.
Ordinary labours engaged to facilitate the intermittent cleaning and other allied works of the Bondajan Channel for removal of floating garbage, plastic etc coming from rain water and through connected channel by manually & maintenance of the Bondajaan channel throughout the rainy season.
Hire charge of one no. Country boat with capacity of 20 to 40 Quintal (without boatman) to facilitate periodical cleaning & maintenance of the Bondajan Channel.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
bondajan_bid.pdf
Tender Documents • 0.69 MB
BOQ_81963.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid