Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAccepted-AOC 117 2 KAKA DEV KANPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | L1 | Accepted-AOC DUE TO L1 | |
| 2 | L2₹12.4 L+₹94,572.61 (8.29%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical VILLAGE GONNAN GARH DISTRICT AMROHA UTTAR PRADESH | AMROHA | UTTAR PRADESH | - | Not Admitted-Fee/PreQual/Technical Others-Bid Capacity is not enclosed |
| Sl No | Description | Qty | Unit | OM SAI CONSTRUCTION COMPANY L1 | JAGDESH PRASAD L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc. | 343.03 | CUM | 170 ₹58,315.27 | 58 ₹19,895.8 Lowest |
| 2.00 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 30.5 | CUM | 4,200 ₹1,28,079 Lowest | 5,350 ₹1,63,148.25 |
| 3.00 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | 4.34 | CUM | 5,400 ₹23,419.8 | 4,700 ₹20,383.9 Lowest |
| 4.00 | Providing and Laying lean concrete (1:4:8) cement concrete including cost of all materials,, labour, T&P, all lifts and leads etc. complete. | 28 | CUM | 4,000 ₹1,12,000 Lowest | 5,000 ₹1,40,000 |
| 5.00 | Providing and Laying M-15 C.C. (1:2:4) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 70.15 | CUM | 5,100 ₹3,57,785.4 Lowest | 5,560 ₹3,90,056.24 |
| 6.00 | Providing and Laying M-20 C.C.1:1.5:3 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 35.82 | CUM | 4,900 ₹1,75,513.1 Lowest | 5,300 ₹1,89,840.7 |
| 7.00 | Providing and Laying M-20 R.C.C.1:1.5:3 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 10.16 | CUM | 4,500 ₹45,702 Lowest | 6,000 ₹60,936 |
| 8.00 | Providing and Laying M-25 C.C.1:1:2 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 2.89 | CUM | 5,400 ₹15,589.8 Lowest | 6,500 ₹18,765.5 |
| 9.00 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads, all labour and T&P etc. | 1.2 | MT. | 65,000 ₹77,740 | 55,300 ₹66,138.8 Lowest |
| 10.00 | Providing and fixing Centering & shuttering for C.C. works (form work of concrete) including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work. | 243.82 | SQM | 325 ₹79,241.18 Lowest | 500 ₹1,21,909.5 |
Tender Value
₹12.9 L
EMD Value
₹26,000
Closing Date
17 Jun 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE M G C C Div 8 Bulandshahr
M G C C Div 8 Bulandshahr
Lot 3 Construction of VRB cum Fall at Km. 3.640 of Tail Dy.
2026_UPIDC_1144439_24
01.EE.2026-27
Open Tender
Civil Works - Canal
Item Rate
45 days
SAMBHAL
2 documents required · 2 mandatory
₹856
₹26,000
Yes
26 Oct 2026
11 Jun 2026
18 Jun 2026
11 Jun 2026
17 Jun 2026
11 Jun 2026
11 Jun 2026 - 17 Jun 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc. | 0.4 | CUM | - | - |
| 2 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | CUM | - | - |
| 3 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | 1 | CUM | - | - |
| 4 | Providing and Laying lean concrete (1:4:8) cement concrete including cost of all materials,, labour, T&P, all lifts and leads etc. complete. | - | CUM | - | - |
| 5 | Providing and Laying M-15 C.C. (1:2:4) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 0.6 | CUM | - | - |
| 6 | Providing and Laying M-20 C.C.1:1.5:3 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | CUM | - | - |
| 7 | Providing and Laying M-20 R.C.C.1:1.5:3 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | CUM | - | - |
| 8 | Providing and Laying M-25 C.C.1:1:2 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | CUM | - | - |
| 9 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads, all labour and T&P etc. | 1 | MT. | - | - |
| 10 | Providing and fixing Centering & shuttering for C.C. works (form work of concrete) including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work. | 0.6 | SQM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TD31EE2627.pdf
Tender Documents • 1.86 MB
BOQ_2172535.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .