Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
14 Aug 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
chief manager
POWERGRID CORPORATION INDIA LIMITED SECTOR-16 FARIDABAD
Construction of Transformer and Reactor repair facility at 500kV HVDC Bhiwadi terminal
NR1/NT/W-CIVIL/DOM/I00/25/09005
Open
Civil Construction Goods
Works
500kV HVDC Bhiwadi Substation
₹25,000
25 Jul 2025
25 Jul 2025
16 Aug 2025
25 Jul 2025
14 Aug 2025
25 Jul 2025
Package Name Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
Package Code Substation Packages SS63 -Part A1 & B1
Specification No. NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610)
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610)
1 Fill up only green shaded cells in Sch-1, Sch-2, Sch-3, Sch-4, Sch-7 and Bid Form 2nd Envelope.
2 All the cells in Sch-5 & Sch-6 are auto filled, therefore no cell is required to be filled up there.
3 Instructions / error messages, if any, will be displayed automatically after selecting the cell.
4 After filling up all the schedues, save the file, take print out of all the schedules and Bid form and sign & stamp and submit them as hard copy of the 2nd envelope (Price part) of the bid. Also ensure to submit the soft copy of the the same file on CD/ DVD.
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
I While filling up the worksheets following may please be observed :
(i) Fill up only green shaded cells.
(ii) Certain data type entries have been restricted, such as Numeric values or limits of numeric values.
(iii) Select only the options provided in pull down menus.
(iv) Do not link any cell of this work book with any other work book.
(v) Do not use copy & paste or cut & paste options for filling up the data.
(vi) Do not reformat any of the cell of the work book.
II This Workbook consists of following worksheets :
Opening page of the workbook.
Names of Bidder :
● Select Sole Bidder or JV (Joint Venture) from the pull down menu. Do not leave this cell blank.
● Select nos. of the JV Partners other than the Lead Partner from drop down menu.
● In case of JV partners more than 2, enter details of 3rd & more partners along with details of 2nd partner.
● Fill up names and address of the Sole Bidder and /or Joint Venture.
● Fill up date in dd-mmm-yyyy format from drop down menu.
● Click for Sch-1 given at the right top of the worksheet to go to Sch-1.
Sch-1 (Ex-works Prices) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Corresponding cell for mode of transaction shall be come enable only after filling up the unit rate, therefore first fill up the unit rate and then mode of transaction for the corresponding item.
● Select either Direct or Bought-out from the drop down menu. Do not leave the cell blank the same shall be deemed to be Bought-out if the cell is left blank.
● Total amount shall get calculated automatically.
● Type Test charges shall appear automatically after filling up Sch-7 appropriately.
Sch-2 (Freight & Insurance Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-3 (Erection Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-4 (Training Charges) :
● Not applicable, hence no cell is required to be filled up.
Sch-4b (Maintenance Charges during and after Defect Liability Period) :
● Not applicable, hence no cell is required to be filled up.
Sch-5 (Summary of Taxes and Duties applicable on the Goods) :
● No cell is required to be filled in by the bidder in this worksheet.
● Summary of all the Schedules without considering discount (mentioned in the work sheet discount) shall be displayed automatically.
● No cell is required to be filled in by the bidder in this worksheet.
Sch-7 (Type Test Charges) :
● Fill up the rates & location where type tests are proposed.
● Total of this Sch-7 shall automatically appear in Sch-1.
Bid from 2nd Envelope :
● Fill up ref. no. as bidder's ref no. of this letter.
● This letter shall consider the net price as per Sch-6 (After Discount).
● Fill up names & Designation of the representatives of other JV partner(s) if the bidder is JV (Joint Venture) .
● Fill up additional information as required.
Happy Bidding !
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Sole Bidder 1 Sole Bidder 1
Joint Venture 2 or More JV (Joint Venture) 2 or More
Enter following details of the bidder
Specify type of Bidder [Select from drop down menu] 0 2 0 0 2 0
Name of Lead Partner …….. …….. …….. …….. …….. ……..
Address of Sole Bidder …….. …….. …….. …….. …….. ……..
Name of other Partner - 1
Address of other Partner - 1
Name of other Partner - 2 (more, if any) …….. …….. …….. …….. …….. ……..
Address of other Partner - 2 (more, if any) …….. …….. …….. …….. …….. ……..
email ID of Bid Signatory
Mobile No. of Bid Signatory
Tel No. of Bid Signatory
Fax No. of Bid Signatory
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Schedule - 1 Direct Total 0 0 `
BO Total #REF! 0
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
PLANT AND EQUIPMENT (INCLUDING MANDATORY SPARES PARTS) TO BE SUPPLIED, INCLUDING TYPE TEST CHARGES FOR TESTS TO BE CONDUCTED Direct
All Prices are in Indian Rupees. Bought-Out
SI. No. PR No PR Line Item No Activity Description Material Code HSN Code Whether HSN in column ‘ 6 ’ is confirmed. If not indicate applicable the HSN code * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Item Description Unit Qty. Unit Ex-works price (excluding GST) Total Ex-works price (excluding GST) GST Tax as confirmed by Bidder
1 7000016517 20 GANTRY STRCUTURES 18 Design, manufacturing & supply of 300/50T EOT crane as per TS. LS 1 Included 0.00 0 0.00
2 7000016517 30 GANTRY STRCUTURES 18 Design, manufacturing & supply of 50/10T span EOT crane as per TS. LS 1 Included 0.00 0 0.00
3 7000016517 40 GANTRY STRCUTURES 18 1000kVA Out door transformer nos 2 Included 0.00 0 0.00
4 7000016517 50 GANTRY STRCUTURES 18 Ring Main Unit (RMU) nos 1 Included 0.00 0 0.00
5 7000016517 70 Tele BoQ at Fatehgarh-3 (Extn) 18 Diesel Generator Set nos 1 Included 0.00 0 0.00
6 7000016517 80 Tele BoQ at Fatehgarh-3 (Extn) 18 HT Panel nos 1 Included 0.00 0 0.00
7 7000016517 90 Tele BoQ at Fatehgarh-3 (Extn) 18 MLVP-01 Panel nos 1 Included 0.00 0 0.00
8 7000016517 100 Tele BoQ at Fatehgarh-3 (Extn) 18 Generator/Synchronizing Panel nos 1 Included 0.00 0 0.00
9 7000016517 110 Tele BoQ at Fatehgarh-3 (Extn) APPFC-01(CAPACITOR BANK) 1000KVAR nos 1 Included 0.00 0 0.00
10 MDP-EQ nos 1 Included 0.00 0 0.00
11 SMDP-EX nos 1 Included 0.00 0 0.00
12 RMU Incomming Cables m 1400 Included 0.00 0 0.00
13 Cables for RMU to Transformer (3Cx120mm² XLPE/SWA/PVC COPPER,11KV CABLE) Km 0.05 Included 0.00 0 0.00
14 Cables for Transformer to MLVP-01 Panel (14Runs/Nos x1Cx630sqmm XLPE/AWA/PVC/Cu. CABLES) Km 0.05 Included 0.00 0 0.00
15 Cables for Generator to Synchronizing Panel Km 0.05 Included 0.00 0 0.00
16 5Runs/Nos x4Cx240mm² XLPE/SWA/PVC/CU CABLE and 3Runs x185mm² PVC Earth Cable Km 0.05 Included 0.00 0 0.00
17 4Runs/Nos x4Cx185mm² XLPE/SWA/PVC/CU CABLE and 2Runs x185mm² PVC Earth Cable Km 0.05 Included 0.00 0 0.00
18 2Runs/Nos x4Cx240mm² XLPE/SWA/PVC/CU CABLE and 240mm² PVC Earth Cable Km 0.15 Included 0.00 0 0.00
19 4Cx240mm² XLPE/SWA/PVC/CU CABLE and 120mm² PVC Earth Cable Km 0.25 Included 0.00 0 0.00
20 4Cx95mm² XLPE/SWA/PVC/CU CABLE and 50mm² PVC Earth Cable Km 0.15 Included 0.00 0 0.00
21 4Cx70mm² XLPE/SWA/PVC/CU CABLE and 35mm² PVC Earth Cable Km 0.6 Included 0.00 0 0.00
22 4Cx35mm² XLPE/SWA/PVC/CU CABLE and 25mm² PVC Earth Cable Km 0.35 Included 0.00 0 0.00
23 4Cx25mm² XLPE/SWA/PVC/CU CABLE and 16mm² PVC Earth Cable Km 0.25 Included 0.00 0 0.00
24 4Cx16mm² XLPE/SWA/PVC/CU CABLE and 10mm² PVC Earth Cable Km 0.35 Included 0.00 0 0.00
25 4Cx10mm² XLPE/SWA/PVC/CU CABLE and 10mm² PVC Earth Cable Km 0.6 Included 0.00 0 0.00
26 4Cx6mm² XLPE/SWA/PVC/CU CABLE and 6mm² PVC Earth Cable Km 0.8 Included 0.00 0 0.00
27 2C x 6mm² XLPE/SWA/PVC Copper Cable Km 0.8 Included 0.00 0 0.00
28 2C x 4mm² XLPE/SWA/PVC Copper Cable Km 2 Included 0.00 0 0.00
29 2C x 2.5 mm² XLPE/SWA/PVC Copper Cable Km 2 Included 0.00 0 0.00
30 DB-LDB nos 2 Included 0.00 0 0.00
31 DB-PDB-1 nos 2 Included 0.00 0 0.00
32 DB-PDB-2 nos 1 Included 0.00 0 0.00
33 DB-PDB-3 nos 1 Included 0.00 0 0.00
34 DB-PDB-4 nos 1 Included 0.00 0 0.00
35 DB-PDB-5 nos 1 Included 0.00 0 0.00
36 DB-PR nos 1 Included 0.00 0 0.00
37 800A Control Panel nos 2 Included 0.00 0 0.00
38 400A Control Panel nos 2 Included 0.00 0 0.00
39 200A Control Panel nos 2 Included 0.00 0 0.00
40 160A Control Panel nos 4 Included 0.00 0 0.00
41 63A Control Panel nos 1 Included 0.00 0 0.00
42 40A Control Panel nos 4 Included 0.00 0 0.00
43 32A Control Panel nos 1 Included 0.00 0 0.00
44 32A TPN Isolator For Exhaust Fan nos 15 Included 0.00 0 0.00
45 20A TPN Isolator For Rolling Shutter nos 2 Included 0.00 0 0.00
46 25A or 32A SPN Isolator For Outdoor Units nos 14 Included 0.00 0 0.00
47 600mm Cable Tray m 550 Included 0.00 0 0.00
48 450mm Cable Tray m 550 Included 0.00 0 0.00
49 300mm Cable Tray m 400 Included 0.00 0 0.00
50 150mm Cable Tray m 300 Included 0.00 0 0.00
51 100x100 GI Trunking m 400 Included 0.00 0 0.00
52 75x75 GI Trunking m 400 Included 0.00 0 0.00
53 110 Dia Sleeve m 350 Included 0.00 0 0.00
54 160 Dia Sleeve m 200 Included 0.00 0 0.00
55 200 Dia Sleeve m 75 Included 0.00 0 0.00
56 32mm GI Conduits Approx. m 1800 Included 0.00 0 0.00
57 300W LED HIGH BAY METAL LIGHT FITTING nos 85 Included 0.00 0 0.00
58 4x18W RECESSED TYPE LIGHT FITTING IP20 nos 25 Included 0.00 0 0.00
59 2x42W SUSPENDED TYPE LINEAR LIGHT FITTING IP65 nos 20 Included 0.00 0 0.00
60 2x32W SUSPENDED TYPE LINEAR LIGHT FITTING IP65 nos 10 Included 0.00 0 0.00
61 1x18W RECESSED MOUNTED DOWN LIGHT FITTING IP44 nos 20 Included 0.00 0 0.00
62 1x26W RECESSED MOUNTED DOWN LIGHT FITTING IP20 nos 20 Included 0.00 0 0.00
63 11W MIRROR LIGHT nos 15 Included 0.00 0 0.00
64 70W LED SECURITY LIGHT IP54 nos 12 Included 0.00 0 0.00
65 250W LED FLOOD LIGHT FITTING IP65 nos 15 Included 0.00 0 0.00
66 10A ONE WAY SWITCH nos 70 Included 0.00 0 0.00
67 10A TWO WAY SWITCH nos 10 Included 0.00 0 0.00
68 MULTI SOCKET OUTLET BOX WEATHER PROOF TYPE (4x20A 1∅, 1x16A 3∅ & 1x32A 3∅) nos 45 Included 0.00 0 0.00
69 FLOOR BOX, 1Nos.13A TWIN SWITCHED SOCKET (NORMAL SUPPLY)/1Nos. TWIN SWITCHED SOCKET (UPS SUPPLY) & Nos. OF DUAL DATA OUTLETS. nos 20 Included 0.00 0 0.00
70 13A SINGLE SWITCHED SOCKET. nos 40 Included 0.00 0 0.00
71 13A TWIN SWITCHED SOCKET. nos 40 Included 0.00 0 0.00
72 RJ45 SINGLE DATE OUTLET nos 20 Included 0.00 0 0.00
73 RJ45 DUEL DATE OUTLET nos 20 Included 0.00 0 0.00
74 FUSED SPUR OUTLET nos 20 Included 0.00 0 0.00
75 20A DP SWITCH WITH INDICATOR nos 20 Included 0.00 0 0.00
76 WALL MOUNTED CCTV nos 20 Included 0.00 0 0.00
77 CEILING MOUNTED CAMERA nos 8 Included 0.00 0 0.00
78 CEILING MOUNTED SPEAKER nos 15 Included 0.00 0 0.00
79 WALL MOUNTED SPEAKER nos 20 Included 0.00 0 0.00
80 ELV JUNCTION BOX nos 4 Included 0.00 0 0.00
81 ELECTRICAL MANHOLE nos 4 Included 0.00 0 0.00
82 ELV MANHOLE nos 12 Included 0.00 0 0.00
83 Split AC - 1.0 Tr Nos 2 Included 0.00 0 0.00
84 Split AC - 1.5 Tr Nos 3 Included 0.00 0 0.00
85 Split AC - 2.0 Tr Nos 6 Included 0.00 0 0.00
86 Outdoor Units (for above 11 split AC) Nos 11 Included 0.00 0 0.00
87 Wall Mounted Exhaust Fan - 30 l/s Nos 5 Included 0.00 0 0.00
88 Wall Mounted Exhaust Fan - 75 l/s Nos 4 Included 0.00 0 0.00
89 Wall Mounted Exhaust Fan - 150 l/s Nos 4 Included 0.00 0 0.00
90 Thermostat Control ( for above 11 split AC) Nos 11 Included 0.00 0 0.00
91 Refrigerant Pipes ( for above 11 split AC) m 160 Included 0.00 0 0.00
92 SMOKE DETECTOR Nos 75 Included 0.00 0 0.00
93 HEAT DETECTOR Nos 8 Included 0.00 0 0.00
94 EMERGENCY LIGHT Nos 102 Included 0.00 0 0.00
95 FIRE EXIT SIGNS/LIGHT Nos 14 Included 0.00 0 0.00
96 MANUAL FIRE ALARM CALL POINT Nos 14 Included 0.00 0 0.00
97 FIRE ALARM SOUNDER Nos 10 Included 0.00 0 0.00
98 FIRE ALARM SOUNDER WITH STROBE LIGHT Nos 7 Included 0.00 0 0.00
99 FIRE ALARM PANEL Nos 2 Included 0.00 0 0.00
100 FIRE HOSE REEL (45M) Nos 10 Included 0.00 0 0.00
101 FIRE EXTINGUISHERS (FOAM TYPE) AFFF Nos 14 Included 0.00 0 0.00
102 FIRE EXTINGUISHERS (CARBON DIOXIDE) CO2 Nos 14 Included 0.00 0 0.00
103 FIRE EXTINGUISHERS (DRY POWDER) Nos 4 Included 0.00 0 0.00
104 FIRE BLANKET Nos 2 Included 0.00 0 0.00
105 FIRE HYDRANT Nos 6 Included 0.00 0 0.00
106 VALVE CHAMBER WITH VALVE Nos 7 Included 0.00 0 0.00
107 FIRE PUMP SET DUTY/STANDBY/JOCKEY CAP:- 750 GPM @ 8 BAR) Set 2 Included 0.00 0 0.00
108 160 DIA FIRE PIPE m 440 Included 0.00 0 0.00
109 50 DIA FIRE PIPE m 190 Included 0.00 0 0.00
110 European Water Closet (EWC) with complete accessories Set 2 Included 0.00 0 0.00
111 Asian Water Closet (AWC) with complete accessories Set 9 Included 0.00 0 0.00
112 Urinal with flush valve manual type with complete accessories Set 4 Included 0.00 0 0.00
113 Counter Top Wash Basin with complete accessories Set 10 Included 0.00 0 0.00
114 7000016517 120 Tele BoQ at Fatehgarh-3 (Extn) 18 Kitchen Sink with complete accessories Set 2 Included 0.00 0 0.00
115 7000016517 130 Tele BoQ at Fatehgarh-3 (Extn) 18 Water Cooler with complete accessories Set 2 Included 0.00 0 0.00
116 7000016517 140 Tele BoQ at Fatehgarh-3 (Extn) 18 50 Liter Water Heater with complete accessories Set 4 Included 0.00 0 0.00
117 7000016517 150 Tele BoQ at Fatehgarh-3 (Extn) 18 Sump Pump For Pump Room Set 2 Included 0.00 0 0.00
118 7000016517 160 Tele BoQ at Fatehgarh-3 (Extn) 18 COLD WATER BOOSTER PUMP SET (1 DUTY/1 STANDBY) (CAPA: 2.5 LPS @ 3 BAR+200 Litre) PRESSURE VESSEL) Set 2 Included 0.00 0 0.00
119 7000016517 170 Tele BoQ at Fatehgarh-3 (Extn) Floor Trap Nos 7 Included 0.00 0 0.00
120 Floor Clean Out Nos 8 Included 0.00 0 0.00
121 Gully Trap Nos 5 Included 0.00 0 0.00
122 Isolation Valve Nos 14 Included 0.00 0 0.00
123 Valve Chamber With Valve Nos 4 Included 0.00 0 0.00
124 Sewage Manhole Nos 10 Included 0.00 0 0.00
125 75mm Dia m 125 Included 0.00 0 0.00
126 63mm Dia m 25 Included 0.00 0 0.00
127 50mm Dia m 25 Included 0.00 0 0.00
128 40mm Dia m 150 Included 0.00 0 0.00
129 32mm Dia m 25 Included 0.00 0 0.00
130 25mm Dia m 65 Included 0.00 0 0.00
131 25mm Dia m 375 Included 0.00 0 0.00
132 32mm Dia m 95 Included 0.00 0 0.00
133 50mm Dia m 95 Included 0.00 0 0.00
134 82mm Dia m 95 Included 0.00 0 0.00
135 110mm Dia m 125 Included 0.00 0 0.00
136 160mm Dia m 375 Included 0.00 0 0.00
#REF! 7000016517 430 420kV SHUNT REACTOR 18 TOTAL Included 0.00 0 0.00
#REF! 7000016517 440 800kV 50kA AIS EQUIPMENT 18 Freight and Insurance Included 0.00 0 0.00
#REF! 7000016517 450 800kV 50kA AIS EQUIPMENT 18 Installation Portion: Included 0.00 0 0.00
#REF! 7000016517 460 800kV 50kA AIS EQUIPMENT 18 ELECTRICAL/STRUCTURAL WORKS Included 0.00 0 0.00
#REF! 7000016517 470 800kV 50kA AIS EQUIPMENT 18 245 kV 1600A, 50KA Circuit Breakers (3-Phase) with support EA 2 Included 0.00 0 0.00
#REF! 7000016517 480 800kV 50kA AIS EQUIPMENT 18 245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 6 Included 0.00 0 0.00
#REF! 7000016517 490 800kV 50kA AIS EQUIPMENT 18 245kV, 1600A, 50 KA, 3-phase DoubleBreak Tandem Isolator without E/S EA 4 Included 0.00 0 0.00
#REF! 7000016517 500 800kV 50kA AIS EQUIPMENT 18 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with two E/S EA 2 Included 0.00 0 0.00
#REF! 7000016517 510 800kV 50kA AIS EQUIPMENT 18 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with one E/S EA 2 Included 0.00 0 0.00
#REF! 7000016517 520 800kV 50kA AIS EQUIPMENT 18 245 kV,1 phase Bus Post Insulator (except for Line Traps) EA 22 Included 0.00 0 0.00
#REF! 7000016517 530 800kV 50kA AIS EQUIPMENT 18 216kV Surge Arrester (1-phase) EA 6 Included 0.00 0 0.00
#REF! 7000016517 540 800kV 50kA AIS EQUIPMENT 18 245 kV, 4400pf Capacitive Voltage Transformer (1- Phase) EA 6 Included 0.00 0 0.00
#REF! 7000016517 550 420kV, 63kA AIS EQUIPMENT 18 220kV Line Protection Panel (with Automation) EA 2 Included 0.00 0 0.00
#REF! 7000016517 560 420kV, 63kA AIS EQUIPMENT 18 220kV Circuit Breaker Relay Panel with Auto Reclose (with Automation) EA 2 Included 0.00 0 0.00
#REF! 7000016517 570 420kV, 63kA AIS EQUIPMENT 18 Augmentation of Substation automation System for 220kV bay as per Technical - Included 0.00 0 0.00
#REF! 7000016517 580 420kV, 63kA AIS EQUIPMENT 18 Laying of optical cables in GI Pipe/Conduit upto 50MM diameter in cable trench Mtr. 500 Included 0.00 0 0.00
#REF! 7000016517 590 420kV, 63kA AIS EQUIPMENT 18 Splicing of optical Fibre cable joints Single Mode/Multi Mode Fiber Each 50 Included 0.00 0 0.00
#REF! 7000016517 600 420kV, 63kA AIS EQUIPMENT 18 Erection Hardware for 220kV layout (Double Main and Transfer Scheme as per SLD)-Line Bay as per specification SET 2 Included 0.00 0 0.00
#REF! 7000016517 610 420kV, 63kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1-Phase CT including nuts, bolts, all type of washers, packplates, step bolts and gusset platesexcluding foundation bolts EA 6 Included 0.00 0 0.00
#REF! 7000016517 620 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1-Phase High BPI including nuts, bolts, all type of washers, packplates, step bolts and gussetplates excluding foundation bolts EA 6 Included 0.00 0 0.00
#REF! 7000016517 630 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1-Phase BPI including nuts, bolts, all type of washers, packplates, step bolts and gusset platesexcluding foundation bolts EA 16 Included 0.00 0 0.00
#REF! 7000016517 640 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1-Phase SA including nuts, bolts, all type of washers, packplates, step bolts and gusset platesexcluding foundation bolts EA 6 Included 0.00 0 0.00
#REF! 7000016517 650 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 3-Phase ISOLATOR including nuts, bolts, all type of washers, packplates, step bolts and gussetplates excluding foundation bolts EA 8 Included 0.00 0 0.00
#REF! 7000016517 660 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1-Phase CVT including nuts, bolts, all type of washers, packplates, step bolts and gusset platesexcluding foundation bolts EA 6 Included 0.00 0 0.00
#REF! 7000016517 670 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1 - PH BPI for WT including nuts, bolts, all type of washers, packplates, step bolts and gussetplates excluding foundation bolts SET 4 Included 0.00 0 0.00
#REF! 7000016517 680 245kV, 50kA AIS EQUIPMENT 18 Air conditioning system for Switchyard Panel Room of 6m length SET 1 Included 0.00 0 0.00
#REF! 7000016517 690 36kV AIS EQUIPMENT 18 Fire Detection and Alarm System for Switchyard Panel Room of 6 m length SET 1 Included 0.00 0 0.00
#REF! 7000016517 700 36kV AIS EQUIPMENT 18 Lighting Fixture LED Luminaires type FL2 as per tech. specifications EA 20 Included 0.00 0 0.00
#REF! 7000016517 710 Erection Hardware for 765 kV S/Y 18 Lighting Panel type ACP-2 as per technical specification EA 1 Included 0.00 0 0.00
#REF! 7000016517 720 Erection Hardware for 765 kV S/Y 18 Illumination System for switchyard panel room of 6 m length SET 1 Included 0.00 0 0.00
#REF! 7000016517 730 Erection Hardware for 765 kV S/Y 18 Laying of POWER & control cables in Cable trenched including Glanding, Lug, ferrule, Cable Tag etc. Included 0.00 0 0.00
#REF! 7000016517 740 Erection Hardware for 765 kV S/Y 18 1.1kV grade 3.5Cx70 sqmm (PVC) Power Cable KM 5 Included 0.00 0 0.00
#REF! 7000016517 750 Erection Hardware for 765 kV S/Y 18 1.1kV grade 3.5Cx35 sqmm (PVC) Power Cable KM 2 Included 0.00 0 0.00
#REF! 7000016517 760 Erection Hardware for 765 kV S/Y 18 1.1kV grade 4Cx16 sqmm (PVC) Power Cable KM 3 Included 0.00 0 0.00
#REF! 7000016517 770 Erection Hardware for 765 kV S/Y 18 1.1kV grade 4Cx6 sqmm (PVC) Power Cable KM 4 Included 0.00 0 0.00
#REF! 7000016517 780 765kV Insulator and Hardware 18 1.1kV grade 2Cx6 sqmm (PVC) Power Cable KM 5 Included 0.00 0 0.00
#REF! 7000016517 790 765kV Insulator and Hardware 18 1.1kV grade 3Cx2.5 sqmm Control Cable KM 7 Included 0.00 0 0.00
#REF! 7000016517 800 765kV Insulator and Hardware 18 1.1kV grade 5Cx2.5 sqmm Control Cable KM 3 Included 0.00 0 0.00
#REF! 7000016517 810 765kV Insulator and Hardware 18 1.1kV grade 7Cx2.5 sqmm Control Cable KM 2 Included 0.00 0 0.00
#REF! 7000016517 820 765kV Insulator and Hardware 18 1.1kV grade 10Cx2.5 sqmm Control Cable KM 1 Included 0.00 0 0.00
#REF! 7000016517 830 Erection Hardware for 420 kV I Type S/Y 18 1.1kV grade 14Cx2.5 sqmm Control Cable KM 3 Included 0.00 0 0.00
#REF! 7000016517 840 Erection Hardware for 420 kV I Type S/Y 18 1.1kV grade 19Cx2.5 sqmm Control Cable KM 1 Included 0.00 0 0.00
#REF! 7000016517 850 Erection Hardware for 420 kV I Type S/Y 18 1.1kV grade 27Cx2.5 sqmm Control Cable KM 1 Included 0.00 0 0.00
#REF! 7000016517 860 Erection Hardware for 420 kV I Type S/Y 18 Fibre Optic Approach cabling: Including installation hardware like ties/clips/cleats, conduits, ducts, supports, fittings, accessories etc.: 24 Fibre KM 1 Included 0.00 0 0.00
#REF! 7000016517 870 Erection Hardware for 420 kV I Type S/Y 18 220kV, 1600A, 0.5mH, 40 kA Line Trap EA 4 Included 0.00 0 0.00
#REF! 7000016517 880 420kV Insulator and Hardware 18 245 kV ,1 phase Bus Post Insulators for Line Traps EA 12 Included 0.00 0 0.00
#REF! 7000016517 890 420kV Insulator and Hardware 18 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 66 Included 0.00 0 0.00
#REF! 7000016517 900 420kV Insulator and Hardware 18 400KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR QUAD CONDUCTOR EA 24 Included 0.00 0 0.00
#REF! 7000016517 910 Erection Hardware for 220 kV DMT Type S 18 Erection Hardware for 220kV layout (Double Main and TransferScheme)-Transformer Bay as per technical specification SET 3 Included 0.00 0 0.00
#REF! 7000016517 920 220kV Insulator and Hardware 18 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 18 Included 0.00 0 0.00
#REF! 7000016517 930 220kV Insulator and Hardware 18 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITHOUT TURN BUCKLE SUITABLE FOR TWIN CONDUCTOR EA 18 Included 0.00 0 0.00
#REF! 7000016517 940 220kV Insulator and Hardware 18 220KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR TWIN CONDUCTOR EA 9 Included 0.00 0 0.00
#REF! 7000016517 950 Earthmat 18 40 MM MS ROD FOR MAIN EARTHMAT KM 48 Included 0.00 0 0.00
#REF! 7000016517 960 CSD 18 Controlled Switching Device for 420 kV, 3-ph Circuit Breaker EA 9 Included 0.00 0 0.00
#REF! 7000016517 970 CSD 18 Controlled Switching Device for 765 kV, 3-ph Circuit Breaker EA 9 Included 0.00 0 0.00
#REF! 7000016517 980 CRP for 765kV Bays 18 765 kV Circuit Breaker Relay Panel With Auto Reclose (with Automation) EA 11 Included 0.00 0 0.00
#REF! 7000016517 990 CRP for 765kV Bays 18 765kV Line Protection Panel (with Automation) EA 2 Included 0.00 0 0.00
#REF! 7000016517 1000 CRP for 765kV Bays 18 765kV Transformer Protection Panel (For both HV & MV side)-(withAutomation) EA 3 Included 0.00 0 0.00
#REF! 7000016517 1010 CRP for 765kV Bays 18 765kV Reactor Protection Panel (with Automation) EA 2 Included 0.00 0 0.00
#REF! 7000016517 1020 CRP for 765kV Bays 18 765kV Bus Bar Protection Panel (Duplicate)-(with Automation) SET 1 Included 0.00 0 0.00
#REF! 7000016517 1030 CRP for 420kV Bays with SAS 18 400kV Circuit Breaker Relay Panel with Auto Reclose (with Automation) EA 12 Included 0.00 0 0.00
#REF! 7000016517 1040 CRP for 420kV Bays with SAS 18 400kV Transformer Protection Panel (For both HV & MV side)-(withAutomation) EA 3 Included 0.00 0 0.00
#REF! 7000016517 1050 CRP for 420kV Bays with SAS 18 400kV Reactor Protection Panel (with Automation) EA 2 Included 0.00 0 0.00
#REF! 7000016517 1060 CRP for 420kV Bays with SAS 18 Augmentation of existing 400kV bus bar protection scheme.(No. of baysas per specification)-(with Automation) SET 1 Included 0.00 0 0.00
#REF! 7000016517 1070 CRP for 220kV Bays with SAS 18 220kV Circuit Breaker Relay Panel with Auto Reclose (with Automation) EA 3 Included 0.00 0 0.00
#REF! 7000016517 1080 CRP for 220kV Bays with SAS 18 Augmentation of existing 220kV bus bar protection scheme.(No. of baysas per specification)-(with Automation) SET 1 Included 0.00 0 0.00
#REF! 7000016517 1090 SAS-AUG 18 Augmentation of Substation automation System for 220kV bay as perTechnical Specification EA 3 Included 0.00 0 0.00
#REF! 7000016517 1100 SAS-AUG 18 Augmentation of Substation automation System for 400kV Tie bay as perTechnical Specification EA 4 Included 0.00 0 0.00
#REF! 7000016517 1110 SAS-AUG 18 Augmentation of Substation automation System for 400kV Main bay as perTechnical Specification EA 8 Included 0.00 0 0.00
#REF! 7000016517 1120 SAS-AUG 18 Augmentation of Substation automation System for 765kV Tie bay as perTechnical Specification EA 4 Included 0.00 0 0.00
#REF! 7000016517 1130 SAS-AUG 18 Augmentation of Substation automation system for 765kV Main bay as perTechnical Specification EA 7 Included 0.00 0 0.00
#REF! 7000016517 1140 VMS 18 COLOR IP CAMERA, WITH PAN, TILT AND ZOOM FACILITIES, ALONGWITH ALLREQUIRED ITEMS, ACCESSORIES, LINE INTERFACE UNITS, FIBER PATCH CORDS,POWER SUPPLY UNITS, JUNCTION BOXES, CABLES, FIBER OPTIC CABLES, ETC.,AND INCLUDING INTEGRATION IN EXISTING HARDWARE AND SOFTWARE FORAUGMENTATION OF VISUAL MONITORING SYSTEM AS PER TECHNICALSPECIFICATION. SET 1 Included 0.00 0 0.00
#REF! 7000016517 1150 PLCC Equipment 18 765kV,3150A,1.0mH , 50kA Line Trap EA 4 Included 0.00 0 0.00
#REF! 7000016517 1160 POWER & CONTROL CABLE 18 1.1KV GRADE 3.5CX300 SQMM (XLPE) POWER CABLE KM 2 Included 0.00 0 0.00
#REF! 7000016517 1170 POWER & CONTROL CABLE 18 1.1KV GRADE 3.5CX70 SQMM (PVC) POWER CABLE KM 6 Included 0.00 0 0.00
#REF! 7000016517 1180 POWER & CONTROL CABLE 18 1.1KV GRADE 3.5CX35 SQMM (PVC) POWER CABLE KM 2 Included 0.00 0 0.00
#REF! 7000016517 1190 POWER & CONTROL CABLE 18 1.1KV GRADE 4CX16 SQMM (PVC) POWER CABLE KM 2 Included 0.00 0 0.00
#REF! 7000016517 1200 POWER & CONTROL CABLE 18 1.1KV GRADE 4CX6 SQMM (PVC) POWER CABLE KM 20 Included 0.00 0 0.00
#REF! 7000016517 1210 POWER & CONTROL CABLE 18 1.1KV GRADE 2CX6 SQMM (PVC) POWER CABLE KM 14 Included 0.00 0 0.00
#REF! 7000016517 1220 POWER & CONTROL CABLE 18 1.1KV GRADE 3CX2.5 SQMM CONTROL CABLE KM 40 Included 0.00 0 0.00
#REF! 7000016517 1230 POWER & CONTROL CABLE 18 1.1KV GRADE 5CX2.5 SQMM CONTROL CABLE KM 68 Included 0.00 0 0.00
#REF! 7000016517 1240 POWER & CONTROL CABLE 18 1.1KV GRADE 10CX2.5 SQMM CONTROL CABLE KM 31 Included 0.00 0 0.00
#REF! 7000016517 1250 POWER & CONTROL CABLE 18 1.1KV GRADE 19CX1.5 SQMM CONTROL CABLE KM 29 Included 0.00 0 0.00
#REF! 7000016517 1260 POWER & CONTROL CABLE 18 1.1KV GRADE 27CX1.5 SQMM CONTROL CABLE KM 7 Included 0.00 0 0.00
#REF! 7000016517 1270 POWER & CONTROL CABLE 18 4PAIR, 0.5SQMM SCREENED CABLE KM 11 Included 0.00 0 0.00
#REF! 7000016517 1280 AIR CONDITIONING & VENTILATION SYSTEM 28 Air conditioning system for Switchyard Panel Room of 6m length SET 5 Included 0.00 0 0.00
#REF! 7000016517 1290 AIR CONDITIONING & VENTILATION SYSTEM 28 Air conditioning system for Switchyard Panel Room of 9m length SET 4 Included 0.00 0 0.00
#REF! 7000016517 1300 FIRE FIGHTING SYSTEM 18 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 500 MVA,(765/v3)/(400/v3)/(33) kV, 1 -phase Autotransformer SET 10 Included 0.00 0 0.00
#REF! 7000016517 1310 FIRE FIGHTING SYSTEM 18 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 110 MVAR, 765/√3 kVsingle phase Shunt Reactor SET 7 Included 0.00 0 0.00
127 7000016517 1320 FIRE FIGHTING SYSTEM 18 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 500MVA , 400KV/220/33kV, 3-phase Autotransformer SET 3 Included 0.00 0 0.00
128 7000016517 1330 FIRE FIGHTING SYSTEM 18 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 125 MVAR, 420kV, 3 phaseBus Reactor SET 2 Included 0.00 0 0.00
129 7000016517 1340 FIRE FIGHTING SYSTEM 18 Fire Detection and Alarm System for Switchyard Panel Room of 9 mlength SET 4 Included 0.00 0 0.00
130 7000016517 1350 FIRE FIGHTING SYSTEM 18 Fire Detection and Alarm System for Switchyard Panel Room of 6 mlength SET 5 Included 0.00 0 0.00
131 7000016517 1360 FIRE FIGHTING SYSTEM 18 4.5 kg CO2 type Portable Fire extinguisher EA 9 Included 0.00 0 0.00
132 7000016517 1370 ILLUMINATION SYSTEM 18 Lighting Panel type ACP-2 as per technical specification EA 6 Included 0.00 0 0.00
133 7000016517 1380 ILLUMINATION SYSTEM 18 Outdoor Power Receptacle for oilfiltration unit (250A) EA 4 Included 0.00 0 0.00
134 7000016517 1390 ILLUMINATION SYSTEM 18 LED FLOOD LIGHT LUMINARIESTYPE FL-1 (150W) AS PER TECHNICALSPECIFICATION EA 50 Included 0.00 0 0.00
135 7000016517 1400 ILLUMINATION SYSTEM 18 LIGHTING FIXTURE LED LUMINAIRES TYPE FL2 AS PER TECH. SPECIFICATIONS EA 40 Included 0.00 0 0.00
136 7000016517 1410 ILLUMINATION SYSTEM 18 Illumination System for switchyard panel room of 6 m length LS 5 Included 0.00 0 0.00
137 7000016517 1420 ILLUMINATION SYSTEM 18 Illumination System for switchyard panel room of 9 m length LS 4 Included 0.00 0 0.00
138 7000016517 1430 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV WT (1PH) EA 4 Included 0.00 0 0.00
139 7000016517 1440 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV BPI (1PH) EA 63 Included 0.00 0 0.00
140 7000016517 1450 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CVT (1PH) EA 12 Included 0.00 0 0.00
141 7000016517 1460 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CT (1PH) EA 33 Included 0.00 0 0.00
142 7000016517 1470 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CLASS SA (1PH) EA 23 Included 0.00 0 0.00
143 7000016517 1480 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV ISO (1PH) EA 45 Included 0.00 0 0.00
144 7000016517 1490 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV ISO (3PH) EA 25 Included 0.00 0 0.00
145 7000016517 1500 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV ISOLATOR (3PH) EA 29 Included 0.00 0 0.00
146 7000016517 1510 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV ISOLATOR (1PH) EA 18 Included 0.00 0 0.00
147 7000016517 1520 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV BPI (1PH) EA 31 Included 0.00 0 0.00
148 7000016517 1530 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV HBPI (1PH) EA 36 Included 0.00 0 0.00
149 7000016517 1540 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CT (1PH) EA 36 Included 0.00 0 0.00
150 7000016517 1550 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CLASS SA (1PH) EA 15 Included 0.00 0 0.00
151 7000016517 1560 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CLASS HIGH LEVELSA (1PH) EA 10 Included 0.00 0 0.00
152 7000016517 1570 220kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV HIGH BPI (1PH) EA 9 Included 0.00 0 0.00
153 7000016517 1580 220kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV BPI (1PH) EA 32 Included 0.00 0 0.00
154 7000016517 1590 220kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CLASS SA (1PH) EA 9 Included 0.00 0 0.00
155 7000016517 1600 220kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV ISOLATOR (3PH) EA 12 Included 0.00 0 0.00
156 7000016517 1610 220kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CT (1PH) EA 9 Included 0.00 0 0.00
157 7000016517 1620 Mandatory Spare LOT 18 Spare-765KV Circuit Breaker LOT 1 Included 0.00 0 0.00
158 7000016517 1630 Mandatory Spare LOT 18 Spare-765kV VKDB Isolator LOT 1 Included 0.00 0 0.00
159 7000016517 1640 Mandatory Spare LOT 18 SPARE-765KV CURRENT TRANSFORMER LOT 1 Included 0.00 0 0.00
160 7000016517 1650 Mandatory Spare LOT 18 SPARE-765KV CAPACITIVE VOLTAGE TRANSFORMER LOT 1 Included 0.00 0 0.00
161 7000016517 1660 Mandatory Spare LOT 18 SPARES FOR 624KV SURGE ARRESTER LS 1 Included 0.00 0 0.00
162 7000016517 1670 Mandatory Spare LOT 18 Spare For 400kV Bus Reactor LS 1 Included 0.00 0 0.00
163 7000016517 1680 Mandatory Spare LOT 18 Spares for 420kV Circuit Breaker LS 1 Included 0.00 0 0.00
164 7000016517 1690 Mandatory Spare LOT 18 Spares for 420kV Double break Isolator LS 1 Included 0.00 0 0.00
165 7000016517 1700 Mandatory Spare LOT 18 SPARES FOR 336KV SURGE ARRESTER LS 1 Included 0.00 0 0.00
166 7000016517 1710 Mandatory Spare LOT 18 Spare-420kV BPI SET 1 Included 0.00 0 0.00
167 7000016517 1720 Mandatory Spare LOT 18 Spare-420kV CT 1 SET 1 Included 0.00 0 0.00
168 7000016517 1730 Mandatory Spare LOT 18 Spare-245kV Circuit Breaker SET 1 Included 0.00 0 0.00
169 7000016517 1740 Mandatory Spare LOT 18 Spare-245kV Isolator SET 1 Included 0.00 0 0.00
170 7000016517 1750 Mandatory Spare LOT 18 Spare-245kV CT SET 1 Included 0.00 0 0.00
171 7000016517 1760 Mandatory Spare LOT 18 Spare-245kV BPI SET 1 Included 0.00 0 0.00
172 7000016517 1770 Mandatory Spare LOT 18 Relay & protection Panels (with automation) LS 1 Included 0.00 0 0.00
173 7000016517 1780 Mandatory Spare LOT 18 Spares-Substation Automation System LS 1 Included 0.00 0 0.00
174 7000016517 1790 Mandatory Spare LOT 18 SPARES FOR CLAMPS & CONNECTORS LOT 1 Included 0.00 0 0.00
175 7000016517 1800 Mandatory Spare LOT 18 Spares for Fire Protection System LS 1 Included 0.00 0 0.00
176 7000016517 1810 Mandatory Spare LOT 18 Spare-216kV Surge Arrester SET 1 Included 0.00 0 0.00
177 7000016517 1820 Mandatory Spare LOT 18 SPARE-800KV BUS POST INSULATOR LOT 1 Included 0.00 0 0.00
Total Ex-works Price 0.00 0.00 0.00
Total Type Test charges as per Schedule-7 0.00
Total Ex-works Price including Type Test charges 0.00
Total GST Tax as confirmed by Bidder 0.00
Note : Specify amount of GST on the transaction between the Contractor and the Employer.
* In case the bidder leaves the cell for confirmation of the HSN code and/or GST rate “blank”, the HSN code and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Place : Printed Name :
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Schedule - 1 Direct Total 0 0 `
BO Total #REF! 0
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(SCHEDULE OF RATES AND PRICES : EX-WORKS PRICES)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
Plant and Equipment (including Mandatory Spares Parts) to be supplied, including Type Test Charges for Tests to be conducted. Direct
All Prices are in Indian Rupees. Bought-Out
SI. No. Item Description Unit Qty. Unit Ex-works price Total Ex-works price Mode of Transaction (Direct / Bought-out)
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
Total Ex-Works Price Direct 0.00 Direct
Total Ex-Works Price Bought Out 0.00
Total Ex-Works Price 0.00
Total Type Test charges as per Schedule-7 #REF! #REF! #REF!
Total Ex-works Price including Type Test charges #REF! #REF! #REF!
Discount Sch-1 #REF! MPD Sch-1 #REF!
Dis Alert #REF!
Note : Specify amount of Excise Duty, Sales Tax/'VAT and other taxes payable on the transaction between the Contractor and the Employer and octroi/entry tax as applicable for destination site/state on all items of supply including bought-out finished items (to be identified in the Contract), which shall be dispatched directly from the sub-vendor’s works to the Employer’s site (sale-in-transit), separately in Schedule-5. Excise Duty, Sales tax and other levies for all the bought-out items are to be included in the EXW Price (Col. No. 5) only and not to be indicated in Schedule-5.
Place : Printed Name :
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Schedule - 2 Dis
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal As per Lum-sum 0
(SCHEDULE OF RATES AND PRICES : FREIGHT & INSURANCE CHARGES) AS per Percent #REF!
As per lum-sum on Sch-2 0.00%
Bidder’s Name and Address (Lead Partner) : To: As per Percent on Sch-2 #REF!
Power Grid Corporation of India Limited Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
…….. …….. …….. …….. …….. …….. Faridabad-121002, Haryana Multipackage Discount 0.00%
All Prices are in Indian Rupees. Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
SI. No. Description Unit Quantity Unit Freight & Insurance Charges Total Freight & Insurance Charges Unit Freight & Insurance Charges Total Freight & Insurance Charges Unit Freight & Insurance Charges Total Freight & Insurance Charges
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
Total F&I Price #REF!
Place : Printed Name :
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Schedule - 2
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
LOCAL TRANSPORTATION, IN-TRANSIT INSURANCE, LOADING AND UNLOADING
All Prices are in Indian Rupees.
SI. No. PR No PR Line Item No Activity Description Material Code S.No. Description Unit Quantity Unit Freight, In-transit Insurance, loading & unloading Charges Total Freight, In-transit Insurance, loading & unloading Charges
1 7000016517 20 GANTRY STRCUTURES 1000011713 1 Design, manufacturing & supply of 300/50T EOT crane as per TS. LS 1 Included
2 7000016517 30 GANTRY STRCUTURES 1000012373 2 Design, manufacturing & supply of 50/10T span EOT crane as per TS. LS 1 Included
3 7000016517 40 GANTRY STRCUTURES 1000015953 3 1000kVA Out door transformer nos 2 Included
4 7000016517 50 GANTRY STRCUTURES 1000015954 4 Ring Main Unit (RMU) nos 1 Included
5 7000016517 70 Tele BoQ at Fatehgarh-3 (Extn) 1000031367 5 Diesel Generator Set nos 1 Included
6 7000016517 80 Tele BoQ at Fatehgarh-3 (Extn) 1000031405 6 HT Panel nos 1 Included
7 7000016517 90 Tele BoQ at Fatehgarh-3 (Extn) 1000018706 7 MLVP-01 Panel nos 1 Included
8 7000016517 100 Tele BoQ at Fatehgarh-3 (Extn) 1000031374 8 Generator/Synchronizing Panel nos 1 Included
9 7000016517 110 Tele BoQ at Fatehgarh-3 (Extn) 1000034950 9 APPFC-01(CAPACITOR BANK) 1000KVAR nos 1 Included
10 MDP-EQ nos 1 Included
11 SMDP-EX nos 1 Included
12 RMU Incomming Cables m 1400 Included
13 Cables for RMU to Transformer (3Cx120mm² XLPE/SWA/PVC COPPER,11KV CABLE) Km 0.05 Included
14 Cables for Transformer to MLVP-01 Panel (14Runs/Nos x1Cx630sqmm XLPE/AWA/PVC/Cu. CABLES) Km 0.05 Included
15 Cables for Generator to Synchronizing Panel Km 0.05 Included
16 5Runs/Nos x4Cx240mm² XLPE/SWA/PVC/CU CABLE and 3Runs x185mm² PVC Earth Cable Km 0.05 Included
17 4Runs/Nos x4Cx185mm² XLPE/SWA/PVC/CU CABLE and 2Runs x185mm² PVC Earth Cable Km 0.05 Included
18 2Runs/Nos x4Cx240mm² XLPE/SWA/PVC/CU CABLE and 240mm² PVC Earth Cable Km 0.15 Included
19 4Cx240mm² XLPE/SWA/PVC/CU CABLE and 120mm² PVC Earth Cable Km 0.25 Included
20 4Cx95mm² XLPE/SWA/PVC/CU CABLE and 50mm² PVC Earth Cable Km 0.15 Included
21 4Cx70mm² XLPE/SWA/PVC/CU CABLE and 35mm² PVC Earth Cable Km 0.6 Included
22 4Cx35mm² XLPE/SWA/PVC/CU CABLE and 25mm² PVC Earth Cable Km 0.35 Included
23 4Cx25mm² XLPE/SWA/PVC/CU CABLE and 16mm² PVC Earth Cable Km 0.25 Included
24 4Cx16mm² XLPE/SWA/PVC/CU CABLE and 10mm² PVC Earth Cable Km 0.35 Included
25 4Cx10mm² XLPE/SWA/PVC/CU CABLE and 10mm² PVC Earth Cable Km 0.6 Included
26 4Cx6mm² XLPE/SWA/PVC/CU CABLE and 6mm² PVC Earth Cable Km 0.8 Included
27 2C x 6mm² XLPE/SWA/PVC Copper Cable Km 0.8 Included
28 2C x 4mm² XLPE/SWA/PVC Copper Cable Km 2 Included
29 2C x 2.5 mm² XLPE/SWA/PVC Copper Cable Km 2 Included
30 DB-LDB nos 2 Included
31 DB-PDB-1 nos 2 Included
32 DB-PDB-2 nos 1 Included
33 DB-PDB-3 nos 1 Included
34 DB-PDB-4 nos 1 Included
35 DB-PDB-5 nos 1 Included
36 DB-PR nos 1 Included
37 800A Control Panel nos 2 Included
38 400A Control Panel nos 2 Included
39 200A Control Panel nos 2 Included
40 160A Control Panel nos 4 Included
41 63A Control Panel nos 1 Included
42 40A Control Panel nos 4 Included
43 32A Control Panel nos 1 Included
44 32A TPN Isolator For Exhaust Fan nos 15 Included
45 20A TPN Isolator For Rolling Shutter nos 2 Included
46 25A or 32A SPN Isolator For Outdoor Units nos 14 Included
47 600mm Cable Tray m 550 Included
48 450mm Cable Tray m 550 Included
49 300mm Cable Tray m 400 Included
50 150mm Cable Tray m 300 Included
51 100x100 GI Trunking m 400 Included
52 75x75 GI Trunking m 400 Included
53 110 Dia Sleeve m 350 Included
54 160 Dia Sleeve m 200 Included
55 200 Dia Sleeve m 75 Included
56 32mm GI Conduits Approx. m 1800 Included
57 300W LED HIGH BAY METAL LIGHT FITTING nos 85 Included
58 4x18W RECESSED TYPE LIGHT FITTING IP20 nos 25 Included
59 2x42W SUSPENDED TYPE LINEAR LIGHT FITTING IP65 nos 20 Included
60 2x32W SUSPENDED TYPE LINEAR LIGHT FITTING IP65 nos 10 Included
61 1x18W RECESSED MOUNTED DOWN LIGHT FITTING IP44 nos 20 Included
62 1x26W RECESSED MOUNTED DOWN LIGHT FITTING IP20 nos 20 Included
63 11W MIRROR LIGHT nos 15 Included
64 70W LED SECURITY LIGHT IP54 nos 12 Included
65 250W LED FLOOD LIGHT FITTING IP65 nos 15 Included
66 10A ONE WAY SWITCH nos 70 Included
67 10A TWO WAY SWITCH nos 10 Included
68 MULTI SOCKET OUTLET BOX WEATHER PROOF TYPE (4x20A 1∅, 1x16A 3∅ & 1x32A 3∅) nos 45 Included
69 FLOOR BOX, 1Nos.13A TWIN SWITCHED SOCKET (NORMAL SUPPLY)/1Nos. TWIN SWITCHED SOCKET (UPS SUPPLY) & Nos. OF DUAL DATA OUTLETS. nos 20 Included
70 13A SINGLE SWITCHED SOCKET. nos 40 Included
71 13A TWIN SWITCHED SOCKET. nos 40 Included
72 RJ45 SINGLE DATE OUTLET nos 20 Included
73 RJ45 DUEL DATE OUTLET nos 20 Included
74 FUSED SPUR OUTLET nos 20 Included
75 20A DP SWITCH WITH INDICATOR nos 20 Included
76 WALL MOUNTED CCTV nos 20 Included
77 CEILING MOUNTED CAMERA nos 8 Included
78 CEILING MOUNTED SPEAKER nos 15 Included
79 WALL MOUNTED SPEAKER nos 20 Included
80 ELV JUNCTION BOX nos 4 Included
81 ELECTRICAL MANHOLE nos 4 Included
82 ELV MANHOLE nos 12 Included
83 Split AC - 1.0 Tr Nos 2 Included
84 Split AC - 1.5 Tr Nos 3 Included
85 Split AC - 2.0 Tr Nos 6 Included
86 Outdoor Units (for above 11 split AC) Nos 11 Included
87 Wall Mounted Exhaust Fan - 30 l/s Nos 5 Included
88 Wall Mounted Exhaust Fan - 75 l/s Nos 4 Included
89 Wall Mounted Exhaust Fan - 150 l/s Nos 4 Included
90 Thermostat Control ( for above 11 split AC) Nos 11 Included
91 Refrigerant Pipes ( for above 11 split AC) m 160 Included
92 SMOKE DETECTOR Nos 75 Included
93 HEAT DETECTOR Nos 8 Included
94 EMERGENCY LIGHT Nos 102 Included
95 FIRE EXIT SIGNS/LIGHT Nos 14 Included
96 MANUAL FIRE ALARM CALL POINT Nos 14 Included
97 FIRE ALARM SOUNDER Nos 10 Included
98 FIRE ALARM SOUNDER WITH STROBE LIGHT Nos 7 Included
99 FIRE ALARM PANEL Nos 2 Included
100 FIRE HOSE REEL (45M) Nos 10 Included
101 FIRE EXTINGUISHERS (FOAM TYPE) AFFF Nos 14 Included
102 FIRE EXTINGUISHERS (CARBON DIOXIDE) CO2 Nos 14 Included
103 FIRE EXTINGUISHERS (DRY POWDER) Nos 4 Included
104 FIRE BLANKET Nos 2 Included
105 FIRE HYDRANT Nos 6 Included
106 VALVE CHAMBER WITH VALVE Nos 7 Included
107 FIRE PUMP SET DUTY/STANDBY/JOCKEY CAP:- 750 GPM @ 8 BAR) Set 2 Included
108 160 DIA FIRE PIPE m 440 Included
109 50 DIA FIRE PIPE m 190 Included
110 European Water Closet (EWC) with complete accessories Set 2 Included
111 Asian Water Closet (AWC) with complete accessories Set 9 Included
112 Urinal with flush valve manual type with complete accessories Set 4 Included
113 Counter Top Wash Basin with complete accessories Set 10 Included
114 Kitchen Sink with complete accessories Set 2 Included
115 Water Cooler with complete accessories Set 2 Included
116 50 Liter Water Heater with complete accessories Set 4 Included
117 Sump Pump For Pump Room Set 2 Included
10 7000016517 120 Tele BoQ at Fatehgarh-3 (Extn) 1000031381 118 COLD WATER BOOSTER PUMP SET (1 DUTY/1 STANDBY) (CAPA: 2.5 LPS @ 3 BAR+200 Litre) PRESSURE VESSEL) Set 2 Included
11 7000016517 130 Tele BoQ at Fatehgarh-3 (Extn) 1000026228 119 Floor Trap Nos 7 Included
12 7000016517 140 Tele BoQ at Fatehgarh-3 (Extn) 1000028495 120 Floor Clean Out Nos 8 Included
13 7000016517 150 Tele BoQ at Fatehgarh-3 (Extn) 1000028265 121 Gully Trap Nos 5 Included
14 7000016517 160 Tele BoQ at Fatehgarh-3 (Extn) 1000034998 122 Isolation Valve Nos 14 Included
15 7000016517 170 Tele BoQ at Fatehgarh-3 (Extn) 1000030942 123 Valve Chamber With Valve Nos 4 Included
16 7000016517 180 Tele BoQ at Fatehgarh-3 (Extn) 1000023471 124 Sewage Manhole Nos 10 Included
17 7000016517 200 Spares- Tele BoQ at Fatehgarh-3 1000031369 125 75mm Dia m 125 Included
18 7000016517 210 Spares- Tele BoQ at Fatehgarh-3 1000018706 126 63mm Dia m 25 Included
19 7000016517 220 Spares- Tele BoQ at Fatehgarh-3 1000031405 127 50mm Dia m 25 Included
20 7000016517 230 Spares- Tele BoQ at Fatehgarh-3 1000031374 128 40mm Dia m 150 Included
21 7000016517 240 Spares- Tele BoQ at Fatehgarh-3 1000034950 129 32mm Dia m 25 Included
22 7000016517 250 Spares- Tele BoQ at Fatehgarh-3 1000031381 130 25mm Dia m 65 Included
23 7000016517 260 Spares- Tele BoQ at Fatehgarh-3 1000034998 131 25mm Dia m 375 Included
24 7000016517 270 Spares- Tele BoQ at Fatehgarh-3 1000031398 132 32mm Dia m 95 Included
25 7000016517 280 Spares- Tele BoQ at Fatehgarh-3 1000030942 133 50mm Dia m 95 Included
26 7000016517 290 Spares- Tele BoQ at Fatehgarh-3 1000023469 134 82mm Dia m 95 Included
27 7000016517 300 Rep ( Fatehgarh-3 - Beawer ) 1000031367 135 110mm Dia m 125 Included
28 7000016517 310 Rep ( Fatehgarh-3 - Beawer ) 1000031405 136 160mm Dia m 375 Included
#REF! 7000016517 430 420kV SHUNT REACTOR 1000013947 400A Control Panel nos 2 Included
#REF! 7000016517 440 800kV 50kA AIS EQUIPMENT 1000005827 200A Control Panel nos 2 Included
#REF! 7000016517 450 800kV 50kA AIS EQUIPMENT 1000005826 160A Control Panel nos 4 Included
#REF! 7000016517 460 800kV 50kA AIS EQUIPMENT 1000005848 63A Control Panel nos 1 Included
#REF! 7000016517 470 800kV 50kA AIS EQUIPMENT 1000005840 40A Control Panel nos 4 Included
#REF! 7000016517 480 800kV 50kA AIS EQUIPMENT 1000005853 32A Control Panel nos 1 Included
#REF! 7000016517 490 800kV 50kA AIS EQUIPMENT 1000005854 32A TPN Isolator For Exhaust Fan nos 15 Included
#REF! 7000016517 500 800kV 50kA AIS EQUIPMENT 1000005820 20A TPN Isolator For Rolling Shutter nos 2 Included
#REF! 7000016517 510 800kV 50kA AIS EQUIPMENT 1000005819 25A or 32A SPN Isolator For Outdoor Units nos 14 Included
#REF! 7000016517 520 800kV 50kA AIS EQUIPMENT 1000020421 600mm Cable Tray m 550 Included
#REF! 7000016517 530 800kV 50kA AIS EQUIPMENT 1000005791 450mm Cable Tray m 550 Included
#REF! 7000016517 540 800kV 50kA AIS EQUIPMENT 1000005790 300mm Cable Tray m 400 Included
#REF! 7000016517 550 420kV, 63kA AIS EQUIPMENT 1000004401 150mm Cable Tray m 300 Included
#REF! 7000016517 560 420kV, 63kA AIS EQUIPMENT 1000020419 100x100 GI Trunking m 400 Included
#REF! 7000016517 570 420kV, 63kA AIS EQUIPMENT 1000004495 75x75 GI Trunking m 400 Included
#REF! 7000016517 580 420kV, 63kA AIS EQUIPMENT 1000004496 110 Dia Sleeve m 350 Included
#REF! 7000016517 590 420kV, 63kA AIS EQUIPMENT 1000004498 160 Dia Sleeve m 200 Included
#REF! 7000016517 600 420kV, 63kA AIS EQUIPMENT 1000004463 200 Dia Sleeve m 75 Included
#REF! 7000016517 610 420kV, 63kA AIS EQUIPMENT 1000004501 32mm GI Conduits Approx. m 1800 Included
#REF! 7000016517 620 245kV, 50kA AIS EQUIPMENT 1000001683 300W LED HIGH BAY METAL LIGHT FITTING nos 85 Included
#REF! 7000016517 630 245kV, 50kA AIS EQUIPMENT 1000001684 4x18W RECESSED TYPE LIGHT FITTING IP20 nos 25 Included
#REF! 7000016517 640 245kV, 50kA AIS EQUIPMENT 1000001688 2x42W SUSPENDED TYPE LINEAR LIGHT FITTING IP65 nos 20 Included
#REF! 7000016517 650 245kV, 50kA AIS EQUIPMENT 1000001689 2x32W SUSPENDED TYPE LINEAR LIGHT FITTING IP65 nos 10 Included
#REF! 7000016517 660 245kV, 50kA AIS EQUIPMENT 1000032777 1x18W RECESSED MOUNTED DOWN LIGHT FITTING IP44 nos 20 Included
#REF! 7000016517 670 245kV, 50kA AIS EQUIPMENT 1000020417 1x26W RECESSED MOUNTED DOWN LIGHT FITTING IP20 nos 20 Included
#REF! 7000016517 680 245kV, 50kA AIS EQUIPMENT 1000001695 11W MIRROR LIGHT nos 15 Included
#REF! 7000016517 690 36kV AIS EQUIPMENT 1000001998 70W LED SECURITY LIGHT IP54 nos 12 Included
#REF! 7000016517 700 36kV AIS EQUIPMENT 1000001999 250W LED FLOOD LIGHT FITTING IP65 nos 15 Included
#REF! 7000016517 710 Erection Hardware for 765 kV S/Y 1000015928 10A ONE WAY SWITCH nos 70 Included
#REF! 7000016517 720 Erection Hardware for 765 kV S/Y 1000054975 10A TWO WAY SWITCH nos 10 Included
#REF! 7000016517 730 Erection Hardware for 765 kV S/Y 1000011362 MULTI SOCKET OUTLET BOX WEATHER PROOF TYPE (4x20A 1∅, 1x16A 3∅ & 1x32A 3∅) nos 45 Included
#REF! 7000016517 740 Erection Hardware for 765 kV S/Y 1000011349 FLOOR BOX, 1Nos.13A TWIN SWITCHED SOCKET (NORMAL SUPPLY)/1Nos. TWIN SWITCHED SOCKET (UPS SUPPLY) & Nos. OF DUAL DATA OUTLETS. nos 20 Included
#REF! 7000016517 750 Erection Hardware for 765 kV S/Y 1000011363 13A SINGLE SWITCHED SOCKET. nos 40 Included
#REF! 7000016517 760 Erection Hardware for 765 kV S/Y 1000011358 13A TWIN SWITCHED SOCKET. nos 40 Included
#REF! 7000016517 770 Erection Hardware for 765 kV S/Y 1000011350 RJ45 SINGLE DATE OUTLET nos 20 Included
73 7000016517 780 765kV Insulator and Hardware 1000055992 RJ45 DUEL DATE OUTLET nos 20 Included
74 7000016517 790 765kV Insulator and Hardware 1000055993 FUSED SPUR OUTLET nos 20 Included
75 7000016517 800 765kV Insulator and Hardware 1000055995 20A DP SWITCH WITH INDICATOR nos 20 Included
76 7000016517 810 765kV Insulator and Hardware 1000055996 WALL MOUNTED CCTV nos 20 Included
77 7000016517 820 765kV Insulator and Hardware 1000055997 CEILING MOUNTED CAMERA nos 8 Included
78 7000016517 830 Erection Hardware for 420 kV I Type S/Y 1000011318 CEILING MOUNTED SPEAKER nos 15 Included
79 7000016517 840 Erection Hardware for 420 kV I Type S/Y 1000011327 WALL MOUNTED SPEAKER nos 20 Included
80 7000016517 850 Erection Hardware for 420 kV I Type S/Y 1000011317 ELV JUNCTION BOX nos 4 Included
81 7000016517 860 Erection Hardware for 420 kV I Type S/Y 1000011326 ELECTRICAL MANHOLE nos 4 Included
82 7000016517 870 Erection Hardware for 420 kV I Type S/Y 1000011320 ELV MANHOLE nos 12 Included
83 7000016517 880 420kV Insulator and Hardware 1000055984 Split AC - 1.0 Tr Nos 2 Included
84 7000016517 890 420kV Insulator and Hardware 1000055991 Split AC - 1.5 Tr Nos 3 Included
85 7000016517 900 420kV Insulator and Hardware 1000055986 Split AC - 2.0 Tr Nos 6 Included
86 7000016517 910 Erection Hardware for 220 kV DMT Type S 1000011264 Outdoor Units (for above 11 split AC) Nos 11 Included
87 7000016517 920 220kV Insulator and Hardware 1000055981 Wall Mounted Exhaust Fan - 30 l/s Nos 5 Included
88 7000016517 930 220kV Insulator and Hardware 1000055980 Wall Mounted Exhaust Fan - 75 l/s Nos 4 Included
89 7000016517 940 220kV Insulator and Hardware 1000055975 Wall Mounted Exhaust Fan - 150 l/s Nos 4 Included
90 7000016517 950 Earthmat 1000032055 Thermostat Control ( for above 11 split AC) Nos 11 Included
91 7000016517 960 CSD 1000009713 Refrigerant Pipes ( for above 11 split AC) m 160 Included
92 7000016517 970 CSD 1000009714 SMOKE DETECTOR Nos 75 Included
93 7000016517 980 CRP for 765kV Bays 1000005074 HEAT DETECTOR Nos 8 Included
94 7000016517 990 CRP for 765kV Bays 1000005522 EMERGENCY LIGHT Nos 102 Included
95 7000016517 1000 CRP for 765kV Bays 1000005789 FIRE EXIT SIGNS/LIGHT Nos 14 Included
96 7000016517 1010 CRP for 765kV Bays 1000005533 MANUAL FIRE ALARM CALL POINT Nos 14 Included
97 7000016517 1020 CRP for 765kV Bays 1000005071 FIRE ALARM SOUNDER Nos 10 Included
98 7000016517 1030 CRP for 420kV Bays with SAS 1000002165 FIRE ALARM SOUNDER WITH STROBE LIGHT Nos 7 Included
99 7000016517 1040 CRP for 420kV Bays with SAS 1000004274 FIRE ALARM PANEL Nos 2 Included
100 7000016517 1050 CRP for 420kV Bays with SAS 1000003407 FIRE HOSE REEL (45M) Nos 10 Included
101 7000016517 1060 CRP for 420kV Bays with SAS 1000002146 FIRE EXTINGUISHERS (FOAM TYPE) AFFF Nos 14 Included
102 7000016517 1070 CRP for 220kV Bays with SAS 1000001170 FIRE EXTINGUISHERS (CARBON DIOXIDE) CO2 Nos 14 Included
103 7000016517 1080 CRP for 220kV Bays with SAS 1000001167 FIRE EXTINGUISHERS (DRY POWDER) Nos 4 Included
104 7000016517 1090 SAS-AUG 1000001333 FIRE BLANKET Nos 2 Included
105 7000016517 1100 SAS-AUG 1000003411 FIRE HYDRANT Nos 6 Included
106 7000016517 1110 SAS-AUG 1000003409 VALVE CHAMBER WITH VALVE Nos 7 Included
107 7000016517 1120 SAS-AUG 1000005537 FIRE PUMP SET DUTY/STANDBY/JOCKEY CAP:- 750 GPM @ 8 BAR) Set 2 Included
108 7000016517 1130 SAS-AUG 1000005535 160 DIA FIRE PIPE m 440 Included
109 7000016517 1140 VMS 1000030433 50 DIA FIRE PIPE m 190 Included
110 7000016517 1150 PLCC Equipment 1000005823 European Water Closet (EWC) with complete accessories Set 2 Included
111 7000016517 1160 POWER & CONTROL CABLE 1000031951 Asian Water Closet (AWC) with complete accessories Set 9 Included
112 7000016517 1170 POWER & CONTROL CABLE 1000031957 Urinal with flush valve manual type with complete accessories Set 4 Included
113 7000016517 1180 POWER & CONTROL CABLE 1000031953 Counter Top Wash Basin with complete accessories Set 10 Included
114 7000016517 1190 POWER & CONTROL CABLE 1000031976 Kitchen Sink with complete accessories Set 2 Included
115 7000016517 1200 POWER & CONTROL CABLE 1000031985 Water Cooler with complete accessories Set 2 Included
116 7000016517 1210 POWER & CONTROL CABLE 1000031943 50 Liter Water Heater with complete accessories Set 4 Included
117 7000016517 1220 POWER & CONTROL CABLE 1000031964 Sump Pump For Pump Room Set 2 Included
118 7000016517 1230 POWER & CONTROL CABLE 1000031987 COLD WATER BOOSTER PUMP SET (1 DUTY/1 STANDBY) (CAPA: 2.5 LPS @ 3 BAR+200 Litre) PRESSURE VESSEL) Set 2 Included
119 7000016517 1240 POWER & CONTROL CABLE 1000031887 Floor Trap Nos 7 Included
120 7000016517 1250 POWER & CONTROL CABLE 1000056264 Floor Clean Out Nos 8 Included
121 7000016517 1260 POWER & CONTROL CABLE 1000056265 Gully Trap Nos 5 Included
122 7000016517 1270 POWER & CONTROL CABLE 1000032050 Isolation Valve Nos 14 Included
123 7000016517 1280 AIR CONDITIONING & VENTILATION SYSTEM 1000006284 Valve Chamber With Valve Nos 4 Included
124 7000016517 1290 AIR CONDITIONING & VENTILATION SYSTEM 1000006285 Sewage Manhole Nos 10 Included
125 7000016517 1300 FIRE FIGHTING SYSTEM 1000012072 75mm Dia m 125 Included
126 7000016517 1310 FIRE FIGHTING SYSTEM 1000012041 63mm Dia m 25 Included
127 7000016517 1320 FIRE FIGHTING SYSTEM 1000012069 50mm Dia m 25 Included
128 7000016517 1330 FIRE FIGHTING SYSTEM 1000012042 40mm Dia m 150 Included
129 7000016517 1340 FIRE FIGHTING SYSTEM 1000012019 32mm Dia m 25 Included
130 7000016517 1350 FIRE FIGHTING SYSTEM 1000012018 25mm Dia m 65 Included
131 7000016517 1360 FIRE FIGHTING SYSTEM 1000012022 25mm Dia m 375 Included
132 7000016517 1370 ILLUMINATION SYSTEM 1000014547 32mm Dia m 95 Included
133 7000016517 1380 ILLUMINATION SYSTEM 1000001894 50mm Dia m 95 Included
134 7000016517 1390 ILLUMINATION SYSTEM 1000038387 82mm Dia m 95 Included
135 7000016517 1400 ILLUMINATION SYSTEM 1000038325 110mm Dia m 125 Included
136 7000016517 1410 ILLUMINATION SYSTEM 1000013795 160mm Dia m 375 Included
137 7000016517 1420 ILLUMINATION SYSTEM 1000013796 Illumination System for switchyard panel room of 9 m length LS 4 Included
138 7000016517 1430 765 kV Equipment support structures 1000050816 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV WT (1PH) EA 4 Included
139 7000016517 1440 765 kV Equipment support structures 1000050811 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV BPI (1PH) EA 63 Included
140 7000016517 1450 765 kV Equipment support structures 1000050813 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CVT (1PH) EA 12 Included
141 7000016517 1460 765 kV Equipment support structures 1000050812 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CT (1PH) EA 33 Included
142 7000016517 1470 765 kV Equipment support structures 1000050815 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CLASS SA (1PH) EA 23 Included
143 7000016517 1480 765 kV Equipment support structures 1000050814 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV ISO (1PH) EA 45 Included
144 7000016517 1490 765 kV Equipment support structures 1000050817 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV ISO (3PH) EA 25 Included
145 7000016517 1500 400kV Equipment support structures 1000049657 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV ISOLATOR (3PH) EA 29 Included
146 7000016517 1510 400kV Equipment support structures 1000050810 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV ISOLATOR (1PH) EA 18 Included
147 7000016517 1520 400kV Equipment support structures 1000049652 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV BPI (1PH) EA 31 Included
148 7000016517 1530 400kV Equipment support structures 1000054972 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV HBPI (1PH) EA 36 Included
149 7000016517 1540 400kV Equipment support structures 1000049653 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CT (1PH) EA 36 Included
150 7000016517 1550 400kV Equipment support structures 1000049655 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CLASS SA (1PH) EA 15 Included
151 7000016517 1560 400kV Equipment support structures 1000054973 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CLASS HIGH LEVELSA (1PH) EA 10 Included
152 7000016517 1570 220kV Equipment support structures 1000052285 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV HIGH BPI (1PH) EA 9 Included
153 7000016517 1580 220kV Equipment support structures 1000049646 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV BPI (1PH) EA 32 Included
154 7000016517 1590 220kV Equipment support structures 1000049649 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CLASS SA (1PH) EA 9 Included
155 7000016517 1600 220kV Equipment support structures 1000049651 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV ISOLATOR (3PH) EA 12 Included
156 7000016517 1610 220kV Equipment support structures 1000049647 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CT (1PH) EA 9 Included
157 7000016517 1620 Mandatory Spare LOT 1000027625 Spare-765KV Circuit Breaker LOT 1 Included
158 7000016517 1630 Mandatory Spare LOT 1000028091 Spare-765kV VKDB Isolator LOT 1 Included
159 7000016517 1640 Mandatory Spare LOT 1000054976 SPARE-765KV CURRENT TRANSFORMER LOT 1 Included
160 7000016517 1650 Mandatory Spare LOT 1000054977 SPARE-765KV CAPACITIVE VOLTAGE TRANSFORMER LOT 1 Included
161 7000016517 1660 Mandatory Spare LOT 1000028372 SPARES FOR 624KV SURGE ARRESTER LS 1 Included
162 7000016517 1670 Mandatory Spare LOT 1000028245 Spare For 400kV Bus Reactor LS 1 Included
163 7000016517 1680 Mandatory Spare LOT 1000019918 Spares for 420kV Circuit Breaker LS 1 Included
164 7000016517 1690 Mandatory Spare LOT 1000019919 Spares for 420kV Double break Isolator LS 1 Included
165 7000016517 1700 Mandatory Spare LOT 1000024186 SPARES FOR 336KV SURGE ARRESTER LS 1 Included
166 7000016517 1710 Mandatory Spare LOT 1000025940 Spare-420kV BPI SET 1 Included
167 7000016517 1720 Mandatory Spare LOT 1000025941 Spare-420kV CT 1 SET 1 Included
168 7000016517 1730 Mandatory Spare LOT 1000025935 Spare-245kV Circuit Breaker SET 1 Included
169 7000016517 1740 Mandatory Spare LOT 1000025936 Spare-245kV Isolator SET 1 Included
170 7000016517 1750 Mandatory Spare LOT 1000025933 Spare-245kV CT SET 1 Included
171 7000016517 1760 Mandatory Spare LOT 1000025932 Spare-245kV BPI SET 1 Included
172 7000016517 1770 Mandatory Spare LOT 1000019912 Relay & protection Panels (with automation) LS 1 Included
173 7000016517 1780 Mandatory Spare LOT 1000019927 Spares-Substation Automation System LS 1 Included
174 7000016517 1790 Mandatory Spare LOT 1000053851 SPARES FOR CLAMPS & CONNECTORS LOT 1 Included
175 7000016517 1800 Mandatory Spare LOT 1000019925 Spares for Fire Protection System LS 1 Included
176 7000016517 1810 Mandatory Spare LOT 1000025930 Spare-216kV Surge Arrester SET 1 Included
177 7000016517 1820 Mandatory Spare LOT 1000054979 SPARE-800KV BUS POST INSULATOR LOT 1 Included
Total F&I Price 0.00
Place: Printed Name :
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Schedule - 3
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-3 0.00%
Bidder’s Name and Address (Lead Partner) : To: As per Percent on Sch-3 #REF!
Power Grid Corporation of India Limited Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
…….. …….. …….. …….. …….. …….. Faridabad-121002, Haryana Multipackage lum-sum 0.00%
INSTALLATION CHARGES INSTALLATION CHARGES Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
All Prices are in Indian Rupees.
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code/DSR CODE-2023 SAC (Service Accounting Codes) Whether SAC in column '8’ is confirmed. If not indicate applicable the SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Erection Charges Total Erection Charges Total GST as confirmed by Bidder Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges
1 7000016517 10 10 10 CIVIL WORKS 2.31 995433 18% Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. Sqm 5300 Included 0.00 0 0
2 7000016517 10 10 20 CIVIL WORKS 2.6.1 995454 18% Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil Cum 1900 Included 0.00 0 0
3 7000016517 10 10 30 CIVIL WORKS 2.7.1 995454 18% Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. Ordinary rock Cum 950 Included 0.00 0 0
4 7000016517 10 10 50 CIVIL WORKS 2.7.3 995454 18% Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. Hard rock (blasting prohibited) Cum 750 Included 0.00 0 0
5 7000016517 10 10 60 CIVIL WORKS 2.26.1 995454 18% Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil Cum 900 Included 0.00 0 0
6 7000016517 10 10 70 CIVIL WORKS 1.1.2 995428 18% CARRIAGE OF MATERIALS By Mechanical Transport including loading,unloading and stacking - Earth - up to 1 KM Cum 1850 Included 0.00 0 0
7 7000016517 10 10 80 CIVIL WORKS 2.25 995455 18% Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Cum 2850 Included 0.00 0 0
8 7000016517 10 10 90 CIVIL WORKS 2.25a 995428 18% Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. Cum 2180 Included 0.00 0 0
9 7000016517 10 10 100 CIVIL WORKS 2.27 995424 18% Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. Cum 230 Included 0.00 0 0
10 7000016517 10 10 110 CIVIL WORKS 2.34.1 995454 18% Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos emulsifiable concentrate of 20% Litre 1820 Included 0.00 0 0
11 7000016517 10 10 120 CIVIL WORKS 4.1.8 995432 18% Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) Cum 450.00 Included 0.00 0 0
12 7000016517 10 10 130 CIVIL WORKS 4.1.5 995432 18% Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources) natural sources) Cum 600.00 Included 0.00 0 0
13 7000016517 10 10 140 CIVIL WORKS 5.33.1.2 995432 18% Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level - Concrete of M30 grade with minimum cement content of 350 kg /cum Cum 2100.00 Included 0.00 0 0
14 7000016517 10 10 160 CIVIL WORKS 5.35 995421 18% Add for using extra cement in the item of design mix over and above the specified cement content therein Quintal 933.00 Included 0.00 0 0
15 7000016517 10 10 170 CIVIL WORKS 5.2.2 995421 18% Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Cum 30.00 Included 0.00 0 0
16 7000016517 10 10 180 CIVIL WORKS 5.3 995421 18% Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand(zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). Cum 150.00 Included 0.00 0 0
17 7000016517 10 10 190 CIVIL WORKS 5.22.6 & 5.22.6A 995462 18% Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level and above plinth level. Kg 345600 Included 0.00 0 0
18 7000016517 10 10 200 CIVIL WORKS 4.3.1 995462 18% Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns SQM 800 Included 0.00 0 0
19 7000016517 10 10 210 CIVIL WORKS 5.9.5 995462 18% Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers SQM 1600 Included 0.00 0 0
20 7000016517 10 10 220 CIVIL WORKS 5.9.6 995462 18% Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts SQM 350 Included 0.00 0 0
21 7000016517 10 10 230 CIVIL WORKS 4.13 995462 18% Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7 kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. Sqm 110.00 Included 0.00 0 0
22 7000016517 10 10 240 CIVIL WORKS 4.10 995454 18% Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources) Sqm 110.00 Included 0.00 0 0
23 7000016517 10 10 250 CIVIL WORKS 16.1 995454 18% Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. SQM 0.00 Included 0.00 0 0
24 7000016517 10 10 260 CIVIL WORKS 16.79 995454 18% Providing, laying, spreading and compacting graded stone aggregate (sizerange 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts,laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge. Cum 1800.00 Included 0.00 0 0
25 7000016517 10 10 270 CIVIL WORKS 16.68 995454 18% Providing and laying 60 mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. Sqm 0.00 Included 0.00 0 0
26 7000016517 10 10 280 CIVIL WORKS 16.69 995454 18% Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete etc. as per direction of Engineerin- charge (length of finished kerb edging shall be measured to calculate volume for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). Cum 290.00 Included 0.00 0 0
27 7000016517 10 10 290 CIVIL WORKS 16.75 995451 18% Providing and laying C.C. pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-in-charge. (The panel shuttering work shall be paid for separately). (Note:- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately). Cum 600.00 Included 0.00 0 0
28 7000016517 10 10 300 CIVIL WORKS 4.17 995454 18% Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. Sqm 192.00 Included 0.00 0 0
29 7000016517 10 10 310 CIVIL WORKS 6.1.2 995454 18% Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) Cum 0.00 Included 0.00 0 0
30 7000016517 10 10 320 CIVIL WORKS 13.9.1 995454 18% Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement. 12 mm cement plaster Sqm 0.00 Included 0.00 0 0
31 7000016517 10 10 330 CIVIL WORKS 6.4.2 995454 18% Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) Cum 0.00 Included 0.00 0 0
32 7000016517 10 10 340 CIVIL WORKS 6.13.2 995428 18% Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand) Sqm 260.00 Included 0.00 0 0
33 7000016517 10 10 350 CIVIL WORKS 6.15 995428 18% Extra for providing and placing in position 2 Nos 6mm dia. M.S. bars at every third course of half brick masonry. Sqm 260.00 Included 0.00 0 0
34 7000016517 10 10 360 CIVIL WORKS 13.1.2 995428 18% 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) Sqm 0.00 Included 0.00 0 0
35 7000016517 60 30 10 CIVIL WORKS 13.2.2 995455 18% 15 mm cement plaster on the rough side of single or half brick wall of mix : 1:6 (1 cement: 6 fine sand) Sqm 0.00 Included 0.00 0 0
36 7000016517 60 30 20 CIVIL WORKS 13.11 995455 18% 18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster 1:6 (1 cement : 6 fine sand). Sqm 1704.00 Included 0.00 0 0
37 7000016517 60 30 30 CIVIL WORKS 13.26 995455 18% Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. Sqm 5600.00 Included 0.00 0 0
38 7000016517 60 30 40 CIVIL WORKS 13.47.1 995455 18% Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm Sqm 1700.00 Included 0.00 0 0
39 7000016517 190 20 10 CIVIL WORKS 13.48.1 998734 18% Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm Sqm 3900.00 Included 0.00 0 0
40 7000016517 190 20 20 CIVIL WORKS 13.61.1 998734 18% Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Sqm 0.00 Included 0.00 0 0
41 7000016517 190 20 30 CIVIL WORKS 13.85.1 998734 18% Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. With ready mixed pink or grey primer on wood work (hard and soft wood) having VOC content less than 50 grams/ litre Sqm 50.00 Included 0.00 0 0
42 7000016517 190 20 40 CIVIL WORKS 13.52(M) 998734 18% Finishing with Epoxy paint two or more coats at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete as per TS for STRUCTURAL STEEL WORK Sqm 8000.00 Included 0.00 0 0
43 CIVIL WORKS 10.6.1 18% Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. 80x1.25 mm M.S. laths with 1.25 mm thick top cover Sqm 126.00 Included 0.00 0 0 CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS
44 7000016517 190 20 50 CIVIL WORKS 10.7 998336 18% Providing and fixing ball bearing for rolling shutters. Each 4.00 Included 0.00 0 0
45 CIVIL WORKS 10.8.2 18% Extra for providing mechanical device chain and crank operation for operating rolling shutters. Exceeding 16.80 sqm in area Sqm 126.00 Included 0.00 0 0
46 CIVIL WORKS 10.25.2 18% Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works Kg 3000.00 Included 0.00 0 0
47 CIVIL WORKS 9.147.A4.2 18% Providing and fixing factory made uPVC glazed /wire mesh windows/ doors comprising of lead free uPVC multi-chambered frame, sash and mullion/coupler (where ever required) extruded profiles having minimum wall thickness of 1.70 mm for Series R1 and R2 profiles and 2.10 mm for Series R3 and R4 profiles conforming to EN: 12608 in any shape, colour and design duly reinforced with galvanized mild steel section made of required shape & size as per CPWD Specification, uPVC extruded glazing beads, interlocks and inline sash adaptor (where ever required) of appropriate dimension , EPDM gasket, hardware, SS 304 grade fasteners of minimum 8 mm dia with countersunk head, comprising of matching polyamide PA6 grade sleeve for fixing frame to finished wall as per IS 1367 : Part 1 to 14, plastic packers, plastic caps and necessary stainless steel screws etc. profile of frame, sash & mullion (if required) shall be mitred cut and fusion welded/mechanically jointed duly sealed at all corners, including drilling of holes for fixing hardware and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weatherproof silicon sealant over backer rod of approved size and quality, all complete as per approved drawing conforming to CPWD specification & direction of Engineer-in-Charge. Section of steel reinforcement and cross sections of uPVC profiles to be as per design approved by Engineer-in-Charge. Wire mesh I Glazing of plain/ toughened/ laminated/ double glass unit with I without high performance coatings as per design requirements and conforming to IS: 3548 & IS: 16231 shall be paid separately. Note:- Structural design proof checked from a Government Engineering Institute, to be provided by the manufacturer for : (i) Sites with basic wind speed > 45 m/sec as per IS 875 - Part 3 (ii) Sites with structure height more than 20m for all wind speeds Three track three panels with Aluminium channel for roller trac, wool pipe, nylon rollers with SS 304 body. Using R3 series with frame (98mm and above) x (40mm and above) & glazed and fly screen sash (30mm and above) x (55mm and above) with zinc alloy (zamak) powder coated handle on each glazed panel with multi-point locking system (height up to 1.8m). Sqm 160.00 Included 0.00 0 0
48 CIVIL WORKS 18% Providing and fixing factory made uPVC glazed /wire mesh windows/ doors comprising of lead free uPVC multi-chambered frame, sash and mullion/coupler (where ever required) extruded profiles having minimum wall thickness of 1.70 mm for Series R1 and R2 profiles and 2.10 mm for Series R3 and R4 profiles conforming to EN: 12608 in any shape, colour and design duly reinforced with galvanized mild steel section made of required shape & size as per CPWD Specification, uPVC extruded glazing beads, interlocks and inline sash adaptor (where ever required) of appropriate dimension , EPDM gasket, hardware, SS 304 grade fasteners of minimum 8 mm dia with countersunk head, comprising of matching polyamide PA6 grade sleeve for fixing frame to finished wall as per IS 1367 : Part 1 to 14, plastic packers, plastic caps and necessary stainless steel screws etc. profile of frame, sash & mullion (if required) shall be mitred cut and fusion welded/mechanically jointed duly sealed at all corners, including drilling of holes for fixing hardware and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weatherproof silicon sealant over backer rod of approved size and quality, all complete as per approved drawing conforming to CPWD specification & direction of Engineer-in-Charge. Section of steel reinforcement and cross sections of uPVC profiles to be as per design approved by Engineer-in-Charge. Wire mesh I Glazing of plain/ toughened/ laminated/ double glass unit with I without high performance coatings as per design requirements and conforming to IS: 3548 & IS: 16231 shall be paid separately. Note:- Structural design proof checked from a Government Engineering Institute, to be provided by the manufacturer for : (i) Sites with basic wind speed > 45 m/sec as per IS 875 - Part 3 (ii) Sites with structure height more than 20m for all wind speeds Ventilator Casement window single panel with or without fixed panel with S.S 305 friction hinges as per size and weight of sash, single point locking zinc alloy (zamak) powder coated handles. Using R1 series with frame (33mm and above) x (35mm and above) & screen/million (33mm and above) x (50mm and above) (Height up to 0.90 Meter). Sqm 10.00 Included 0.00 0 0
49 CIVIL WORKS 21.3.2 18% Providing and fixing glazing in aluminium/uvpc door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item): With float glass panes of 5 mm thickness (weight not less than 12.50 kg/sqm) Sqm 177.00 Included 0.00 0 0
50 CIVIL WORKS 21.8.1 18% Filling the gap in between aluminium frame & adjacent RCC/ Brick/ Stone work by providing weather silicon sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete. Upto 5 mm depth and 5 mm width MTR 400.00 Included 0.00 0 0
51 CIVIL WORKS 2.10.1.1 18% Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : Pipes, cables etc, not exceeding 80 mm dia. MTR 100.00 Included 0.00 0 0
52 CIVIL WORKS 2.10.1.2 18% Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia MTR 100.00 Included 0.00 0 0
53 CIVIL WORKS 13.68.1 18% French spirit polishing. Two or more coats on new works including a coat of wood filler Sqm 100.00 Included 0.00 0 0
54 CIVIL WORKS 8.2.1.1 18% Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing of edges to give high gloss finish etc. complete at all levels. Raj Nagar Plain white marble/ Udaipur green marble/ Zebra black marble -Area of slab upto 0.50 sqm Sqm 8.00 Included 0.00 0 0
55 CIVIL WORKS 18% Included 0.00 0 0
56 CIVIL WORKS 8.31 18% Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. Sqm 0.00 Included 0.00 0 0
57 CIVIL WORKS 11.41A.2 18% Providing and laying Vitrified tiles in floor in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid on 20 mm thick cement mortar 1:4 (1 cement: 4 coarse sand) jointing with grey cement slurry @3.3 kg/sqm including grouting the joints with white cement and matching pigments etc. The tiles must be cut with the zero chipping diamond cutter only . Laying of tiles will be done with the notch trowel, plier, wedge, clips of required thickness, leveling system and rubber mallet for placing the tiles gently and easily. Glazed vitrified floor tiles polished finish of size. Size of Tile 600 x 600 mm Sqm 0.00 Included 0.00 0 0
58 CIVIL WORKS 11.46.2 18% Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, in skirting, riser of steps, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mm Sqm 30.00 Included 0.00 0 0
59 CIVIL WORKS 11.38 18% Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ sq.m including pointing the joints with white cement and matching pigments etc., complete. Sqm 0.00 Included 0.00 0 0
60 CIVIL WORKS 17.2.1 18% Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid Each 5.00 Included 0.00 0 0
61 CIVIL WORKS 17.7.4 18% Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Flat back wash basin size 550x 400 mm with single 15 mm C.P. brass pillar tap Each 4.00 Included 0.00 0 0
62 CIVIL WORKS 17.4.1 18% Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : One urinal basin with 5 litre white P.V.C. automatic flushing cistern Each 3.00 Included 0.00 0 0
63 CIVIL WORKS 17.8 18% Providing and fixing white vitreous china pedestal for wash basin completely recessed at the back for the reception of pipes and fittings. Each 4.00 Included 0.00 0 0
64 CIVIL WORKS 17.10.1.3 18% Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS:13983 with C.I. brackets and stainless steel plug 40 mm,including painting of fittings and brackets, cutting and making good the walls wherever required :Kitchen sink with drain board :510x1040 mm bowl depth 200 mm Each 1.00 Included 0.00 0 0
65 CIVIL WORKS 17.28.2.1 18% Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete.Flexible pipe: - 32 mm dia Each 5.00 Included 0.00 0 0
66 CIVIL WORKS 17.32.2 18% Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing : Rectangular shape 453x357 mm Each 4.00 Included 0.00 0 0
67 CIVIL WORKS 17.69.2 18% Providing and fixing PTMT Waste Coupling for wash basin and sink, of approved quality and colour.:Waste coupling 38 mm dia of 83 mm length and 77mm breadth, weighing not less than 60 gms Each 4.00 Included 0.00 0 0
68 CIVIL WORKS 17.70.1 18% Providing and fixing PTMT Bottle Trap for Wash basin and sink :Bottle trap 31mm single piece moulded with height of 270 mm, effective length of tail pipe 260 mm from the centre of the waste coupling, 77 mm breadth with 25 mm minimum water seal, weighing not less than 260 gms each. Each 3.00 Included 0.00 0 0
69 CIVIL WORKS 18.7.4 18% Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall 32 mm nominal outer dia Pipes MTR 100.00 Included 0.00 0 0
70 CIVIL WORKS 18.8.1 18% Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings and fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 15 mm nominal dia Pipes MTR 20.00 Included 0.00 0 0
71 CIVIL WORKS 18.8.2 18% Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings and fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 20 mm nominal dia Pipes MTR 20.00 Included 0.00 0 0
72 CIVIL WORKS 11.54.2 18% Providing and fixing removable raised/false access flooring with system and its components of approved make for different plenum height with possible height adjustment upto 50 mm, comprising of modular load bearing floor panels supported on G.l. rectangular stinger frame work and G.I. Pedestal etc. all complete, as per the architectural drawings, as specified and as directed by Engineer-in-charge consisting of: (a) Providing at required spacing to form modular framework, pedestals made out of Gl tube of thickness minimum 2 mm and 25 mm outer diameter, fully welded on to the G.I. Base plate of size 100 mm x 100 mm x 3 mm at the bottom of the pedestal tube, G.l. pedestal head of size 75mmx75mmx3.5 mm welded with Gl fully threaded stud 16 mm outer diameter with two Gl Check nuts screwed on the stud for level adjustment upto 50mm, locking and stabilizing the pedestal head in position at the required level. The pedestals shall be fixed to the subfloor (base) through base plate using epoxy based adhesive of approved make or the machine screw with rawl plug. (b) Stringers system in all steel construction hot dipped galvanized of rectangular size 570x20x30x0.80 mm thick having holes at both ends for securing the stringers on to the pedestal head using fully threaded screws ensuring maximum lateral stability in all directions, the grid formed by the pedestal and stringer assembly shall receive the floor panel, this system shall provide adequate solid, rigid support for access floor panel, the system shall provide a minimum clear uninterrupted clearance between the bottom of the floor for electrical conduits and wiring etc. all complete as per the architectural drawings, as specified and as directed by the Engineer-in-charge. (c) Providing and fixing Access Floor panel of 600x600x32 mm medium grade Filled Steel anti static high pressure Lamination of 800H grade (FS800H). Access Floor panel shall be steel welded construction with an enclosed bottom pan with uniform pattern of 64 hemispherical cones. The top and bottom plates of Steel Gauges: top 0.6 mm and bottom 0.7 mm fused spot welded together (minimum 64 welds in each dome and 20 welds along each flange). The panel should be Corroresist epoxy coated for lifetime rust protection and cavity formed by the top and bottom plate is filled with Pyrogrip noncombustible Portland cementitious core mixed with light weight foaming compound. The access floor shall be factory finished with Anti-static High Pressure laminate with Non Warp technology upto 1 mm thickness for superior adhesion and Surface flatness within 0.75mm. The panel is to withstand a Concentrated Load of 363 kgs applied on area 25 mm x 25 mm without collapse in the centre of the panel which is placed on four steel blocks. The panel will withstand and Uniformly Distributed Load (UDL) minimum 1250 kg/sqm and an impact load of 50kg all complete as per the approved manufacturers specification and as per the direction of Engineer-in-charge. All specification must be printed on the side of the panel to ensure the quality of the product. 300 mm Finished Floor Height (FFH) 450 mm Finished Floor Height (FFH). Sqm 50.00 Included 0.00 0 0
73 CIVIL WORKS 22.23A 18% Providing & Applying polymer modified, flexible cementatious negative side waterproofing coating with elastic waterproofing polymers on interior wall plaster surface in three coats @14.35 kg /10 sqm. one coat of self priming of cementatious waterproofing polymer(dilution with water in the ratio of 1:1) and two coats of cementatious waterproofing polymer (dilution with water in the ratio of 3:1 ) after scrapping and properly cleaning the surface to remove pre-existing paint film & loose particles till plaster is visible, complete in all respect as per the direction of Engineer-in-Charge. Sqm 61.00 Included 0.00 0 0
74 CIVIL WORKS 18.17.1A 18% Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) - 20 mm nominal bore Each 4.00 Included 0.00 0 0
75 CIVIL WORKS 18.17.2 18% Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) - 32 mm nominal bore Each 4.00 Included 0.00 0 0
76 CIVIL WORKS 18.53.1 18% Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931 - 15 mm nominal bore Each 10.00 Included 0.00 0 0
77 CIVIL WORKS 18.48 18% Providing and placing on terrace (at all floor levels) polyethylene water storage tank, ISI : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. Litre 2000.00 Included 0.00 0 0
78 CIVIL WORKS 18.53A 18% Providing and fixing C.P. Brass extension nipple (size 15mmx50mm) of approved make and quality as per direction of Engineer-in-charge. Each 10 Included 0.00 0 0
79 CIVIL WORKS 18.77 18% Cutting holes up to 15x15 cm in R.C.C. floors and roofs for passing drain pipe etc. and repairing the hole after insertion of drain pipe etc. with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), including finishing complete so as to make it leak proof. Each 2 Included 0.00 0 0
80 CIVIL WORKS 19.4.1.1 18% Providing and fixing square-mouth S.W. gully trap class SP-1 complete with C.I. grating brick masonry chamber with water tight C.I. cover with frame of 300 x300 mm size (inside) the weight of cover to be not less than 4.50 kg and frame to be not less than 2.70 kg as per standard design, 100x100 mm size P type : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 Each 4 Included 0.00 0 0
81 CIVIL WORKS 12.41.2 18% Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 110 mm diameter MTR 342 Included 0.00 0 0
82 CIVIL WORKS 12.42.6.2 18% Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. Shoe (Plane) - 110 mm Each 40 Included 0.00 0 0
83 CIVIL WORKS 12.42.1.2 18% Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. Coupler - 110 mm Each 40 Included 0.00 0 0
84 CIVIL WORKS 21.1.1.2 18% Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / panelling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) : For fixed portion - Powder coated aluminium (minimum thickness of powder coating 50 micron) Kg 300 Included 0.00 0 0
85 CIVIL WORKS 21.1.2.2 18% Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / panelling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) : For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately) Powder coated aluminium (minimum thickness of powder coating 50 micron) Kg 100 Included 0.00 0 0
86 CIVIL WORKS 21.18 18% Providing and fixing 12 mm thick frameless toughened glass door shutter of approved brand and manufacture, including providing and fixing top & bottom pivot & double acting hydraulic floor spring type fixing arrangement and making necessary holes etc. for fixing required door fittings, all complete as per direction of Engineer-in-charge (Door handle, lock and stopper etc.to be paid separately). Sqm 35 Included 0.00 0 0
87 CIVIL WORKS 13.52 (M) 18% Finishing with PU coating (two or more coats) over RCC floor at all locations(workshop area) prepared and applied as per manufacturer’s specifications including, preparation of surface, etc. complete. Total thickness of PU coats shall be minimum 300 microns. The final coat of PU shall be applied after Installation of equipments. Sqm 5668 Included 0.00 0 0
88 7000016517 190 20 60 CIVIL WORKS 11.5 998734 18% 62 mm thick cement concrete flooring with concrete hardener topping, under layer 50 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) and top layer 12mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate, 6mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacture’s specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. Sqm 5668 Included 0.00 0 0
89 7000016517 190 20 70 CIVIL WORKS 10.19 (m) 998734 18% Providing and fixing mild steel hot dip galvabizing foundation bolts with nuts and washer plates complete. Kg 5000 Included 0.00 0 0
90 7000016517 190 20 80 CIVIL WORKS 10.2 998734 18% Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Kg 480000 Included 0.00 0 0
91 7000016517 190 20 90 CIVIL WORKS NS 998734 18% Diluting and injecting chemical emulsion (to be supplied under other item) for PRE-CONSTRUCTIONAL anti-termite treatment and creating a continuous chemical barrier under and around the columns pits, wall trenches, basement excavation, along the external perimeter of retaining wall, expansion joints, over top surface consolidated earth on which apron is to be laid, surroundings of pipes and conduits etc., complete as per specifications. Chlorpyriphos/ Lindane emulsifiable concentrate 20% with 1% concentration. (cost of Chlorpyriphos/ Lindane emulsifiable concentrate shall be paid separately. Basement floor slab area of the building only shall be measured for payment) SQM 0 Included 0.00 0 0
92 CIVIL WORKS NS 18% Supply and installation of 50 mm wall panel with PPGI sheet 0.5/0.5 mm both side having PUF Density of 40kg/cum (+/- 2kg per Cum ) etc. complete as per technical specification and drawing. Sqm 5400 Included 0.00 0 0
93 CIVIL WORKS NS 18% Supply and installation of 30/60 mm corrugated Roof Panel with PPGI sheet 0.5/0.5 mm both side having PUF Density of 40kg/cum (+/- 2kg per Cum ) etc. complete as per technical specification and drawing. Sqm 5000 Included 0.00 0 0
94 CIVIL WORKS NS 18% Providing & fixing chicken wire mesh 24 gauge at junctions of RCC and masonry walls including fixing in position, scaffolding etc. complete as directed by Engineer-in-charge. SQM 100 Included 0.00 0 0
95 CIVIL WORKS NS 18% Providing and fixing soil, waste and vent pipes with unplasticised rigid PVC 110mm dia pipes conforming IS 13592 Type B. including jointing, testing etc. all complete as directed by the Engineer in charge MTR 100 Included 0.00 0 0
96 CIVIL WORKS NS 18% Providing and fixing soil, waste and vent pipes with unplasticised rigid PVC 75mm dia pipes conforming IS 13592 Type B.including jointing, testing etc. all complete as directed by the Engineer in charge. MTR 100 Included 0.00 0 0
97 CIVIL WORKS NS 18% Providing and fixing of bend of required degree, insertion rubber washer 3mm thick with necessary PVC 110mm dia bend.including jointing, testing etc. all complete as directed by the Engineer in charge. Each 10 Included 0.00 0 0
98 CIVIL WORKS NS 18% Providing and fixing of bend of required degree, insertion rubber washer 3mm thick with necessary PVC 75mm dia bend.including jointing, testing etc. all complete as directed by the Engineer in charge.. Each 10 Included 0.00 0 0
99 CIVIL WORKS NS 18% Providing and fixing of bend of required degree, insertion rubber washer 3mm thick, with access door with necessary PVC 110mm dia and.including jointing, testing etc. all complete as directed by the Engineer in charge. Each 5 Included 0.00 0 0
100 7000016517 190 20 100 CIVIL WORKS NS 998336 18% Providing and fixing multi floor trap of self cleaning design 110x75mm,all complete as directed by the Engineer in charge. Each 5 Included 0.00 0 0
101 7000016517 190 20 110 CIVIL WORKS NS 998336 18% Providing and fixing floor trap of self cleaning design 110x75mm,all complete as directed by the Engineer in charge. Each 5 Included 0.00 0 0
102 7000016517 190 20 120 CIVIL WORKS NS 998336 18% Providing and fixing soil, waste and vent pipes with unplsticised rigid PVC 160mm dia pipes conforming IS 13592 Type B. all complete as directed by the Engineer in charge. MTR 100 Included 0.00 0 0
103 7000016517 360 50 10 CIVIL WORKS NS 998734 18% Providing and fixing CP Brass 2 in one taps for WC with health faucet, flexible hose pipe complete. Jaguar 5041 for tap & 563 for health facet or equivalent model of approved brands. Each 5 Included 0.00 0 0
104 7000016517 360 50 20 CIVIL WORKS NS 998734 18% Providing and fixing reputed make (As per list attached) WPC solid Door Frames sections of minimum size 100x62mm with one side rebate suitable for fixing Single shutters 28--35mm thick of WPC/Flush or wooden panelled. All complete as directed by the engineer-in-charge. Note: Rates quoted by the agency shall be inclusive of all material, making suitable for fixing, making pattern or design as approved by POWERGRID with all necessary materials, leads and lifts etc. MTR 42 Included 0.00 0 0
105 7000016517 360 50 30 CIVIL WORKS NS 998734 18% Providing and fixing Minimum 28mm thick WPC shutters of approved brand (As per list attached) and design/ pattern with min 3 Nos of 100x58x1.9mm stainless steel hinges. All complete as directed by the Engineer-in-charge. Note: Rates quoted by the agency shall be inclusive of all material, making suitable for fixing, making pattern or design as approved by POWERGRID with all necessary materials, leads and lifts etc. SQM 16 Included 0.00 0 0
106 7000016517 360 50 40 CIVIL WORKS NS 998336 18% Providing and fixing of stainless steel 304 grade of make PULL HANDLES 300 x 22mm, SS 304, Finish : Satin with necessary screws etc. complete. Dormakaba / Godrej / Kich make or equivalent SET 6 Included 0.00 0 0
107 7000016517 360 50 50 CIVIL WORKS NS 998336 18% Provinding and fixing of Pull Handle for Door 600 MM length in Stainless Steel finish fixed on one side of the door with necessary screw etc. SET 2 Included 0.00 0 0
108 7000016517 360 50 60 DESIGN AND PLANNING OF BUILDING CPWD PART 3 998734 18% Design and drawings of PEB building as per tender drawing including design of foundation, structural drawings of all RCC LS 1 Included 0.00 0 0
109 7000016517 410 20 10 EOT CRANE NS 998713 18% Design, manufacturing & supply of 300/50T EOT crane as per TS. LS 1 Included 0.00 0 0
110 7000016517 410 20 20 EOT CRANE NS 998734 18% Design, manufacturing & supply of 50/10T span EOT crane as per TS. LS 1 Included 0.00 0 0
111 7000016517 410 20 30 HV and LV System SOR 998713 18% 1000kVA Out door transformer nos 2 Included 0.00 0 0
112 7000016517 410 20 40 HV and LV System SOR 998713 18% Ring Main Unit (RMU) nos 1 Included 0.00 0 0
113 7000016517 410 20 50 HV and LV System SOR 998734 18% Diesel Generator Set nos 1 Included 0.00 0 0
114 7000016517 1830 1120 10 HV and LV System SOR 998736 18% HT Panel nos 1 Included 0.00 0 0
115 7000016517 1830 1120 20 HV and LV System SOR 998736 18% MLVP-01 Panel nos 1 Included 0.00 0 0
116 7000016517 1840 1290 10 HV and LV System SOR 998736 18% Generator/Synchronizing Panel nos 1 Included 0.00 0 0
117 7000016517 1840 1290 20 HV and LV System SOR 998736 18% APPFC-01(CAPACITOR BANK) 1000KVAR nos 1 Included 0.00 0 0
118 7000016517 1840 1290 30 HV and LV System SOR 998736 18% MDP-EQ nos 1 Included 0.00 0 0
119 7000016517 1840 1290 40 HV and LV System SOR 998736 18% SMDP-EX nos 1 Included 0.00 0 0
120 7000016517 1840 1290 50 Electrical Cable Requirements SOR 998736 18% RMU Incomming Cables m 1400 Included 0.00 0 0
121 7000016517 1840 1290 60 Electrical Cable Requirements SOR 998736 18% Cables for RMU to Transformer (3Cx120mm² XLPE/SWA/PVC COPPER,11KV CABLE) Km 0.05 Included 0.00 0 0
122 7000016517 1840 1290 70 Electrical Cable Requirements SOR 998736 18% Cables for Transformer to MLVP-01 Panel (14Runs/Nos x1Cx630sqmm XLPE/AWA/PVC/Cu. CABLES) Km 0.05 Included 0.00 0 0
123 7000016517 1840 1290 80 Electrical Cable Requirements SOR 998736 18% Cables for Generator to Synchronizing Panel Km 0.05 Included 0.00 0 0
124 7000016517 1840 1290 90 Electrical Cable Requirements SOR 998736 18% 5Runs/Nos x4Cx240mm² XLPE/SWA/PVC/CU CABLE and 3Runs x185mm² PVC Earth Cable Km 0.05 Included 0.00 0 0
125 7000016517 1840 1290 100 Electrical Cable Requirements SOR 998736 18% 4Runs/Nos x4Cx185mm² XLPE/SWA/PVC/CU CABLE and 2Runs x185mm² PVC Earth Cable Km 0.05 Included 0.00 0 0
126 7000016517 1840 1290 110 Electrical Cable Requirements SOR 998734 18% 2Runs/Nos x4Cx240mm² XLPE/SWA/PVC/CU CABLE and 240mm² PVC Earth Cable Km 0.15 Included 0.00 0 0
127 7000016517 1850 1310 10 Electrical Cable Requirements SOR 998734 18% 4Cx240mm² XLPE/SWA/PVC/CU CABLE and 120mm² PVC Earth Cable Km 0.25 Included 0.00 0 0
128 7000016517 1850 1310 20 Electrical Cable Requirements SOR 998736 18% 4Cx95mm² XLPE/SWA/PVC/CU CABLE and 50mm² PVC Earth Cable Km 0.15 Included 0.00 0 0
129 7000016517 1850 1310 30 Electrical Cable Requirements SOR 998736 18% 4Cx70mm² XLPE/SWA/PVC/CU CABLE and 35mm² PVC Earth Cable Km 0.6 Included 0.00 0 0
130 7000016517 1850 1310 40 Electrical Cable Requirements SOR 998736 18% 4Cx35mm² XLPE/SWA/PVC/CU CABLE and 25mm² PVC Earth Cable Km 0.35 Included 0.00 0 0
131 7000016517 1850 1310 50 Electrical Cable Requirements SOR 998736 18% 4Cx25mm² XLPE/SWA/PVC/CU CABLE and 16mm² PVC Earth Cable Km 0.25 Included 0.00 0 0
132 7000016517 1850 1310 60 Electrical Cable Requirements SOR 998736 18% 4Cx16mm² XLPE/SWA/PVC/CU CABLE and 10mm² PVC Earth Cable Km 0.35 Included 0.00 0 0
133 7000016517 1850 1310 70 Electrical Cable Requirements SOR 998736 18% 4Cx10mm² XLPE/SWA/PVC/CU CABLE and 10mm² PVC Earth Cable Km 0.6 Included 0.00 0 0
134 7000016517 1860 1340 10 Electrical Cable Requirements SOR 998736 18% 4Cx6mm² XLPE/SWA/PVC/CU CABLE and 6mm² PVC Earth Cable Km 0.8 Included 0.00 0 0
135 7000016517 1860 1340 20 Electrical Cable Requirements SOR 998736 18% 2C x 6mm² XLPE/SWA/PVC Copper Cable Km 0.8 Included 0.00 0 0
136 7000016517 1860 1340 30 Electrical Cable Requirements SOR 998736 18% 2C x 4mm² XLPE/SWA/PVC Copper Cable Km 2 Included 0.00 0 0
137 Electrical Cable Requirements SOR 18% 2C x 2.5 mm² XLPE/SWA/PVC Copper Cable Km 2 Included 0.00 0 0
138 Electrical Distributions SOR 18% DB-LDB nos 2 Included 0.00 0 0
139 Electrical Distributions SOR 18% DB-PDB-1 nos 2 Included 0.00 0 0
140 Electrical Distributions SOR 18% DB-PDB-2 nos 1 Included 0.00 0 0
141 Electrical Distributions SOR 18% DB-PDB-3 nos 1 Included 0.00 0 0
142 Electrical Distributions SOR 18% DB-PDB-4 nos 1 Included 0.00 0 0
143 Electrical Distributions SOR 18% DB-PDB-5 nos 1 Included 0.00 0 0
144 Electrical Distributions SOR 18% DB-PR nos 1 Included 0.00 0 0
145 Electrical Distributions SOR 18% 800A Control Panel nos 2 Included 0.00 0 0
146 Electrical Distributions SOR 18% 400A Control Panel nos 2 Included 0.00 0 0
147 Electrical Distributions SOR 18% 200A Control Panel nos 2 Included 0.00 0 0
148 Electrical Distributions SOR 18% 160A Control Panel nos 4 Included 0.00 0 0
149 Electrical Distributions SOR 18% 63A Control Panel nos 1 Included 0.00 0 0
150 Electrical Distributions SOR 18% 40A Control Panel nos 4 Included 0.00 0 0
151 Electrical Distributions SOR 18% 32A Control Panel nos 1 Included 0.00 0 0
152 Electrical Distributions SOR 18% 32A TPN Isolator For Exhaust Fan nos 15 Included 0.00 0 0
153 Electrical Distributions SOR 18% 20A TPN Isolator For Rolling Shutter nos 2 Included 0.00 0 0
154 Electrical Distributions SOR 18% 25A or 32A SPN Isolator For Outdoor Units nos 14 Included 0.00 0 0
155 Electrical Containments SOR 18% 600mm Cable Tray m 550 Included 0.00 0 0
156 Electrical Containments SOR 18% 450mm Cable Tray m 550 Included 0.00 0 0
157 Electrical Containments SOR 18% 300mm Cable Tray m 400 Included 0.00 0 0
158 Electrical Containments SOR 18% 150mm Cable Tray m 300 Included 0.00 0 0
159 Electrical Containments SOR 18% 100x100 GI Trunking m 400 Included 0.00 0 0
160 Electrical Containments SOR 18% 75x75 GI Trunking m 400 Included 0.00 0 0
161 Electrical Containments SOR 18% 110 Dia Sleeve m 350 Included 0.00 0 0
162 Electrical Containments SOR 18% 160 Dia Sleeve m 200 Included 0.00 0 0
163 Electrical Containments SOR 18% 200 Dia Sleeve m 75 Included 0.00 0 0
164 Electrical Containments SOR 18% 32mm GI Conduits Approx. m 1800 Included 0.00 0 0
165 Electrical Accessories SOR 18% 300W LED HIGH BAY METAL LIGHT FITTING nos 85 Included 0.00 0 0
166 Electrical Accessories SOR 18% 4x18W RECESSED TYPE LIGHT FITTING IP20 nos 25 Included 0.00 0 0
167 Electrical Accessories SOR 18% 2x42W SUSPENDED TYPE LINEAR LIGHT FITTING IP65 nos 20 Included 0.00 0 0
168 Electrical Accessories SOR 18% 2x32W SUSPENDED TYPE LINEAR LIGHT FITTING IP65 nos 10 Included 0.00 0 0
169 Electrical Accessories SOR 18% 1x18W RECESSED MOUNTED DOWN LIGHT FITTING IP44 nos 20 Included 0.00 0 0
170 Electrical Accessories SOR 18% 1x26W RECESSED MOUNTED DOWN LIGHT FITTING IP20 nos 20 Included 0.00 0 0
171 Electrical Accessories SOR 18% 11W MIRROR LIGHT nos 15 Included 0.00 0 0
172 Electrical Accessories SOR 18% 70W LED SECURITY LIGHT IP54 nos 12 Included 0.00 0 0
173 Electrical Accessories SOR 18% 250W LED FLOOD LIGHT FITTING IP65 nos 15 Included 0.00 0 0
174 Electrical Accessories SOR 18% 10A ONE WAY SWITCH nos 70 Included 0.00 0 0
175 Electrical Accessories SOR 18% 10A TWO WAY SWITCH nos 10 Included 0.00 0 0
176 Electrical Accessories SOR 18% MULTI SOCKET OUTLET BOX WEATHER PROOF TYPE (4x20A 1∅, 1x16A 3∅ & 1x32A 3∅) nos 45 Included 0.00 0 0
177 Electrical Accessories SOR 18% FLOOR BOX, 1Nos.13A TWIN SWITCHED SOCKET (NORMAL SUPPLY)/1Nos. TWIN SWITCHED SOCKET (UPS SUPPLY) & Nos. OF DUAL DATA OUTLETS. nos 20 Included 0.00 0 0
178 Electrical Accessories SOR 18% 13A SINGLE SWITCHED SOCKET. nos 40 Included 0.00 0 0
179 Electrical Accessories SOR 18% 13A TWIN SWITCHED SOCKET. nos 40 Included 0.00 0 0
180 Electrical Accessories SOR 18% RJ45 SINGLE DATE OUTLET nos 20 Included 0.00 0 0
181 Electrical Accessories SOR 18% RJ45 DUEL DATE OUTLET nos 20 Included 0.00 0 0
182 Electrical Accessories SOR 18% FUSED SPUR OUTLET nos 20 Included 0.00 0 0
183 Electrical Accessories SOR 18% 20A DP SWITCH WITH INDICATOR nos 20 Included 0.00 0 0
184 Electrical Accessories SOR 18% WALL MOUNTED CCTV nos 20 Included 0.00 0 0
185 Electrical Accessories SOR 18% CEILING MOUNTED CAMERA nos 8 Included 0.00 0 0
186 Electrical Accessories SOR 18% CEILING MOUNTED SPEAKER nos 15 Included 0.00 0 0
187 Electrical Accessories SOR 18% WALL MOUNTED SPEAKER nos 20 Included 0.00 0 0
188 Electrical Accessories SOR 18% ELV JUNCTION BOX nos 4 Included 0.00 0 0
189 Electrical Accessories SOR 18% ELECTRICAL MANHOLE nos 4 Included 0.00 0 0
190 Electrical Accessories SOR 18% ELV MANHOLE nos 12 Included 0.00 0 0
191 HVAC System SOR 18% Split AC - 1.0 Tr Nos 2 Included 0.00 0 0
192 HVAC System SOR 18% Split AC - 1.5 Tr Nos 3 Included 0.00 0 0
193 HVAC System SOR 18% Split AC - 2.0 Tr Nos 6 Included 0.00 0 0
194 HVAC System SOR 18% Outdoor Units (for above 11 split AC) Nos 11 Included 0.00 0 0
195 HVAC System SOR 18% Wall Mounted Exhaust Fan - 30 l/s Nos 5 Included 0.00 0 0
196 HVAC System SOR 18% Wall Mounted Exhaust Fan - 75 l/s Nos 4 Included 0.00 0 0
197 HVAC System SOR 18% Wall Mounted Exhaust Fan - 150 l/s Nos 4 Included 0.00 0 0
198 HVAC System SOR 18% Thermostat Control ( for above 11 split AC) Nos 11 Included 0.00 0 0
199 HVAC System SOR 18% Refrigerant Pipes ( for above 11 split AC) m 160 Included 0.00 0 0
200 Fire Fighting System SOR 18% SMOKE DETECTOR Nos 75 Included 0.00 0 0
201 Fire Fighting System SOR 18% HEAT DETECTOR Nos 8 Included 0.00 0 0
202 Fire Fighting System SOR 18% EMERGENCY LIGHT Nos 102 Included 0.00 0 0
203 Fire Fighting System SOR 18% FIRE EXIT SIGNS/LIGHT Nos 14 Included 0.00 0 0
204 Fire Fighting System SOR 18% MANUAL FIRE ALARM CALL POINT Nos 14 Included 0.00 0 0
205 Fire Fighting System SOR 18% FIRE ALARM SOUNDER Nos 10 Included 0.00 0 0
206 Fire Fighting System SOR 18% FIRE ALARM SOUNDER WITH STROBE LIGHT Nos 7 Included 0.00 0 0
207 Fire Fighting System SOR 18% FIRE ALARM PANEL Nos 2 Included 0.00 0 0
208 Fire Fighting System SOR 18% FIRE HOSE REEL (45M) Nos 10 Included 0.00 0 0
209 Fire Fighting System SOR 18% FIRE EXTINGUISHERS (FOAM TYPE) AFFF Nos 14 Included 0.00 0 0
210 Fire Fighting System SOR 18% FIRE EXTINGUISHERS (CARBON DIOXIDE) CO2 Nos 14 Included 0.00 0 0
211 Fire Fighting System SOR 18% FIRE EXTINGUISHERS (DRY POWDER) Nos 4 Included 0.00 0 0
212 Fire Fighting System SOR 18% FIRE BLANKET Nos 2 Included 0.00 0 0
213 Fire Fighting System SOR 18% FIRE HYDRANT Nos 6 Included 0.00 0 0
214 Fire Fighting System SOR 18% VALVE CHAMBER WITH VALVE Nos 7 Included 0.00 0 0
215 Fire Fighting System SOR 18% FIRE PUMP SET DUTY/STANDBY/JOCKEY CAP:- 750 GPM @ 8 BAR) Set 2 Included 0.00 0 0
216 Fire Fighting System SOR 18% 160 DIA FIRE PIPE m 440 Included 0.00 0 0
217 Fire Fighting System SOR 18% 50 DIA FIRE PIPE m 190 Included 0.00 0 0
218 Plumbing System SOR 18% European Water Closet (EWC) with complete accessories Set 2 Included 0.00 0 0
219 Plumbing System SOR 18% Asian Water Closet (AWC) with complete accessories Set 9 Included 0.00 0 0
220 Plumbing System SOR 18% Urinal with flush valve manual type with complete accessories Set 4 Included 0.00 0 0
221 Plumbing System SOR 18% Counter Top Wash Basin with complete accessories Set 10 Included 0.00 0 0
222 Plumbing System SOR 18% Kitchen Sink with complete accessories Set 2 Included 0.00 0 0
223 Plumbing System SOR 18% Water Cooler with complete accessories Set 2 Included 0.00 0 0
224 Plumbing System SOR 18% 50 Liter Water Heater with complete accessories Set 4 Included 0.00 0 0
225 Plumbing System SOR 18% Sump Pump For Pump Room Set 2 Included 0.00 0 0
226 Plumbing System SOR 18% COLD WATER BOOSTER PUMP SET (1 DUTY/1 STANDBY) (CAPA: 2.5 LPS @ 3 BAR+200 Litre) PRESSURE VESSEL) Set 2 Included 0.00 0 0
227 Plumbing System SOR 18% Floor Trap Nos 7 Included 0.00 0 0
228 Plumbing System SOR 18% Floor Clean Out Nos 8 Included 0.00 0 0
229 7000016517 1860 1340 40 Plumbing System SOR 998736 18% Gully Trap Nos 5 Included 0.00 0 0
230 7000016517 1860 1340 50 Plumbing System SOR 998736 18% Isolation Valve Nos 14 Included 0.00 0 0
231 7000016517 1860 1340 60 Plumbing System SOR 998736 18% Valve Chamber With Valve Nos 4 Included 0.00 0 0
232 7000016517 1860 1340 70 Plumbing System SOR 998736 18% Sewage Manhole Nos 10 Included 0.00 0 0
233 7000016517 1870 1390 10 Water Piping Details SOR 998736 18% 75mm Dia m 125 Included 0.00 0 0
234 7000016517 1870 1390 20 Water Piping Details SOR 998736 18% 63mm Dia m 25 Included 0.00 0 0
235 7000016517 1880 1400 10 Water Piping Details SOR 998731 18% 50mm Dia m 25 Included 0.00 0 0
236 7000016517 1880 1400 20 Water Piping Details SOR 998731 18% 40mm Dia m 150 Included 0.00 0 0
237 7000016517 1880 1400 30 Water Piping Details SOR 998731 18% 32mm Dia m 25 Included 0.00 0 0
238 7000016517 1880 1400 40 Water Piping Details SOR 998731 18% 25mm Dia m 65 Included 0.00 0 0
239 7000016517 1880 1400 50 Water Piping Details SOR 998731 18% 25mm Dia m 375 Included 0.00 0 0
240 7000016517 1880 1400 60 Drainage Piping Details SOR 998736 18% 32mm Dia m 95 Included 0.00 0 0
241 7000016517 1880 1400 70 Drainage Piping Details SOR 998736 18% 50mm Dia m 95 Included 0.00 0 0
242 7000016517 1890 1401 10 Drainage Piping Details SOR 998731 18% 82mm Dia m 95 Included 0.00 0 0
243 7000016517 1890 1401 20 Drainage Piping Details SOR 998731 18% 110mm Dia m 125 Included 0.00 0 0
244 7000016517 1890 1401 30 Drainage Piping Details SOR 998731 18% 160mm Dia m 375 Included 0.00 0 0
Total Installation Charges 0.00 0
Total GST as confirmed by Bidder 0.00
* In case the bidder leaves the cell for confirmation of the SAC and/or GST rate “blank”, the SAC and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Place : Printed Name :
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Schedule - 3
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES : ERECTION CHARGES) AS per Percent #REF!
As per lum-sum on Sch-3 0.00%
Bidder’s Name and Address (Lead Partner) : To: As per Percent on Sch-3 #REF!
Power Grid Corporation of India Limited Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
…….. …….. …….. …….. …….. …….. Faridabad-121002, Haryana Multipackage lum-sum 0.00%
All Prices are in Indian Rupees. Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
SI. No. Description Unit Quantity Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! (a) Detailed Soil Investigation
#REF! #REF! #REF! #REF! #REF! (b) All kinds of soil except fissured rock & hard rock
#REF! #REF! #REF! #REF! #REF! (e) River Crossing Location
#REF! #REF! #REF! #REF! #REF! (f)
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
Total Erection Price (A+B) #REF!
Place : Printed Name :
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Schedule - 4
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(SCHEDULE OF RATES AND PRICES )
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Training Charges for Training to be imparted
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column '8’ is confirmed. If not indicate applicable the SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Training Charges excluding GST Total Training Charges excluding GST Total GST as confirmed by Bidder
Revaluation of J column Tax Calculation
NOT APPLICABLE Revaluation of J column Tax Calculation
Included 0.00 0 0
Total Training Charges 0.00 0
Total GST as confirmed by Bidder 0.00
Date : -- Printed Name :
Place : Designation :
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Schedule - 4b
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(SCHEDULE OF RATES AND PRICES )
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Maintenance Charges during & after Defect Laibility Period
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column '8’ is confirmed. If not indicate applicable the SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Maintenance Charges excluding GST Total Maintenance Charges excluding GST Total GST as confirmed by Bidder
0 Revaluation of P column Tax Calculation
A. #REF! Revaluation of P column Tax Calculation
1 Included 0.00 0 0
2 Included 0.00 0 0
3 Included 0.00 0 0
4 Included 0.00 0 0
B. #REF! Revaluation of P column Tax Calculation
1 Included 0.00 0 0
2 Included 0.00 0 0
3 Included 0.00 0 0
4 Included 0.00 0 0
Total Maintenance Charges during and after Defect Liabilty Period 0.00 0
Total GST as confirmed by Bidder 0.00
Date : -- Printed Name :
Place : Designation :
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Schedule - 5
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(SUMMARY OF TAXES & DUTIES APPLICABLE ON PLANT & EQUIPMENT)
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Sl. No. Item Nos. Total Price (INR) After Discount After MPDiscount
1 TOTAL GST ON GOODS Excise Duty #REF! Excise Duty #REF!
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable. 0.00
2 TOTAL GST ON SERVICES Sales Tax 0.00 Sales Tax 0.00
Total GST on Installation Services (Schedule-3), Training to be imparted in India (Schedule-4) 0.00 #REF! 0 #REF! 0
GRAND TOTAL [1+2] 0.00 Grand Total after Discount #REF! Grand Total after MPD #REF!
Date : -- Printed Name :
Place : Designation :
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Schedule - 5
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
SUMMARY OF TAXES & DUTIES APPLICABLE ON GOODS
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Sl. No. Item Nos. Total Price (INR)
1 TOTAL GST ON GOODS 0.00
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable.
2 TOTAL GST ON SERVICES 0.00
Total GST on Installation Services (Schedule-3), Training to be imparted in India (Schedule-4a) and Maintenance Charges during and after Defect Liabilty Period (Schedule-4b)
GRAND TOTAL [1+2] 0.00
Date : -- Printed Name :
Place : Designation :
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Schedule - 6
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(GRAND SUMMARY)
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, In-transit Insurance, loading & unloading
3 TOTAL SCHEDULE NO. 3 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 0.00
Training Charges
4b TOTAL SCHEDULE NO. 4b 0.00
Maintenance Charges during & after Defect Laibility Period
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 7 0.00
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+4+5] 0.00
Date : -- Printed Name :
Place : Designation :
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Schedule - 6 After Discount
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(GRAND SUMMARY)
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, In-transit Insurance, loading & unloading
3 TOTAL SCHEDULE NO. 3 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 0.00
Training Charges
4b TOTAL SCHEDULE NO. 4b 0.00
Maintenance Charges during & after Defect Laibility Period
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 7 0.00
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+4+5] 0.00
Date : -- Printed Name :
Place : Designation :
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Schedule 7
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-7 0.00%
Bidder’s Name and Address (Lead Partner) : To: As per Percent on Sch-7 #REF!
Power Grid Corporation of India Limited Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
…….. …….. …….. …….. …….. …….. Faridabad-121002, Haryana Multipackage Discount 0.0000%
Type tests Charges:
SL. NO. PR No Line Item No Code HSN Code Whether HSN in column ‘2’ is confirmed. If not indicate applicable the HSN code * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description of Test Unit Quantity Unit Test Charge Total Test Charges (Rs.) Total GST as confirmed by Bidder Revaluation of M column Tax Calculation Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
1 Included 0.00 0 0.00
2 Included 0.00 0 0.00
TOTAL TYPE TEST CHARGES 0.00
Total GST as confirmed by Bidder 0.00
Date : -- Printed Name :
Place : Designation :
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610)
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal 0 0
(SCHEDULE OF RATES AND PRICES ) 0 0
Bidder’s Name and Address (Lead Partner) :
SL. NO. Description of Test #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610)
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES : TYPE TEST CHARGES) AS per Percent #REF!
As per lum-sum on Sch-7 0.00%
Bidder’s Name and Address (Lead Partner) : To: As per Percent on Sch-7 #REF!
Power Grid Corporation of India Limited Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
…….. …….. …….. …….. …….. …….. Faridabad-121002, Haryana Multipackage Discount 0.0000%
Type Tests on Earthwire
SL. NO. Description of Test Unit Quantity Unit Test Charge Total Test Charges (Rs.) Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
(a) #REF! #REF! #REF! #REF! #REF!
(b) #REF! #REF! #REF! #REF! #REF!
Sub-Total (I) #REF!
TOTAL TEST CHARGES (I) #REF!
Discount Sche-7 #REF! MPD Sche-7 #REF!
Dis Alert #REF!
Date : -- Printed Name :
Place : Designation :
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610)
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal 0 0 0
(SCHEDULE OF RATES AND PRICES : TYPE TEST CHARGES) 0 0 0
Bidder’s Name and Address (Lead Partner) : 0
SL. NO. Description of Test 0
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
This letter of discount is optional. Bidder may / may not offer any discount.
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Letter of Discount
LETTER OF DISCOUNT
Contract Services
Power Grid Corporation of India Ltd.,
"Saudamini", Plot No.-2
Sector-29, (near IFFCO Chowk)
Gurgaon (Haryana) - 122001
Subject : Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
With reference to the subject tender, we hereby offer unconditional discount on the prices quoted by us as per details given here below : Eq Weightage of Rs/ % Final Discount Factor
1 Discount on lum-sum basis on total price quoted by us without Taxes & Duties. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2, Sch-3, Sch-4a, Sch-4b & Sch-7] In Rs. 0.00 0.0000000000%
2 Discount on percent basis on total price quoted by us without Taxes & Duties. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2 , Sch-3, Sch-4a, Sch-4b & Sch-7] In Percent (%) 0.00 0.00%
3 Discount on lum-sum basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Rs.
Schedule-1 : Ex works prices In Rs. 0.00 0.0000000000% Schedule-1 : Ex-Works Price 0.0000000000%
Schedule-2 : Freight & Insurance In Rs. 0.00 0.0000000000% Schedule-2 : Freight & Insurance 0.0000000000%
Schedule-3 : Erection Charges In Rs. 0.00 0.0000000000% Schedule-3 : Erection Charges 0.0000000000%
Schedule-4a : Training Charges In Rs. 0.00 0.0000000000% Schedule-4a : Training Charges 0.0000000000%
Schedule-4b : Maintenance Charges during and after DLP In Rs. 0.00 0.0000000000% Schedule-4b : Maintenance Charges 0.0000000000%
Schedule-7 : Type Test Charges In Rs. 0.00 0.0000000000% Schedule-7 : Type Test Charges 0.0000000000%
4 Discount on percent basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Percent (%)
Schedule-1 : Ex works prices In Percent (%) 0.00 0.00%
Schedule-2 : Freight & Insurance In Percent (%) 0.00 0.00%
Schedule-3 : Erection Charges In Percent (%) 0.00 0.00%
Schedule-4a : Training Charges In Percent (%) 0.00 0.00%
Schedule-4b : Maintenance Charges during and after DLP In Percent (%) 0.00 0.00%
Schedule-7 : Type Test Charges In Percent (%) 0.00 0.00%
Discount(s) offered at sl. No. 1 to 4 will get displayed and accounted for automatically in the respective items of the Schedules.
5 We hereby offer Multi-package discount as given below:
Multi-Package Discount(s) offered at sl. No. 5 will not get automatically accounted for in the respective items of the Schedules. The same shall be worked out saparately for evaluation.
Please consider this letter of discount as the integral part of our price bid.
Thanking you, we remain,
Yours faithfully,
For and on behalf of …….. …….. …….. …….. …….. ……..
Date : -- Printed Name :
Place : Designation :
Details of Octroi
Sl No. Description of Items Amount on which Octroi is applicable Rate of Octroi Octroi
Details of Entry Tax
Sl No. Description of Items Amount on which Entry Tax is applicable Rate of Entry Tax Entry Tax
Details of Other Taxes & Duties
Sl No. Description of Items Amount on which Other Taxes & Duties are applicable Description of Taxes & Duties Rate of Taxes & Duties Amount of Taxes & Duties
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Bid Form 2nd Envelope 0 1 st 1 January
0 2 nd 2 February
BID FORM (Second Envelope) 3 rd 3 March
Bid Proposal Ref. No. 5 th 5 May
Date : -- 6 th #VALUE! 6 June
7 th #VALUE! 7 July
To: 8 th #VALUE! 8 August
Power Grid Corporation of India Limited 9 th #VALUE! 9 September
Northern Region Transmission System–I, Regional Headquarter, 10 th 10 October
SCO Bay No. 5 to 10, Sector 16A, 11 th 11 November
Faridabad-121002, Haryana 12 th 12 December
Name of Contract : Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal 15 th
Dear Ladies and/or Gentlemen, 16 th
Schedule 1 Plant and Equipment (Including Mandatory Spare Parts) to be supplied, including Type Test Charges. 21 st
Schedule 2 Local Transportation, In-transit Insurance, loading and unloading 22 th
Schedule 3 Installation Charges. 23 th
Schedule 4 Training charges for training to be imparted. 24 th
Schedule 4b Maintenance Charges during & after Defect Laibility Period.
Schedule 5 Taxes and Duties not included in Schedule 1 25 th
Schedule 6 Grand Summary [Schedule 1to 5] 26 th
Schedule 7 Break-up of Type Test Charges for Type Tests to be conducted 27 th
2.5 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced. 31 st
3.0 We confirm that except as otherwise specifically provided our Bid Prices in this Second Envelope include all taxes, duties, levies and charges as may be assessed on us/our Associate (applicable for Foreign Bidder), our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
3.1 100% of applicable Taxes and Duties i.e GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
3.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
4.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions. 2
5.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of …….. …….. …….. …….. …….. ……..
Date : -- Printed Name :
Place : Designation :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him.
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
STATEMENT OF QUOTED / CORRECTED PRICES
All Figures are in Rupees
Sl. No. Price Component Quoted Price Corrected Price
1 TOTAL SCHEDULE NO. 1:Ex-Works Price of Plant and Equipment including Type Test Charges 0.00 0.00
2 TOTAL SCHEDULE NO.2: Local Transportation, Insurance and other Incidental Services. 0.00 0.00
3 TOTAL SCHEDULE NO.3: Installation Charges 0.00 0.00
4 TOTAL SCHEDULE NO.4: Training Charges Not Applicable Not Applicable
5 TOTAL BID PRICE: (Excluding Taxes & Duties) 0.00 0.00
6 DISCOUNT #REF! #REF! #REF!
7 NET BID PRICE (Excluding Taxes & Duties) #REF! #REF!
8 TAXES & DUTIES PAYABLE ADDITIONALLY
A) EXCISE DUTY 0 0.00
B) CENTRAL SALES TAX 0 0.00
C) VAT #REF! 0.00
D) ENTRY TAX / OCTROI #REF! 0.00
F) TOTAL TAXES & DUTIES #REF! 0.00
8 TOTAL BID PRICE (INCLUDING TAXES & DUTIES) #REF! 0.00
9 TOTAL SCHEDULE NO.7: Type Test Charges [Total of this Schedule is included in Schedule-1 above] 0.00 0.00
I) Bidder has indicated the following taxes and duties additionally applicable for their bid:
Excise Duty % as Excise Duty
#REF! VAT #REF! #REF!
#REF! Entry Tax/ Octroi #REF! #REF!
Others as Others
II) With regard to Entry Tax, it may be mentioned that the substations covered under the subject pacakge falls in State of MP, where an entry tax @ 2% of Purchase Price is applicable. In view of the above, the taxes and duties inter-alia including entry tax applicable for the bids are calculated :
a) Ex-Works Price of Direct Supplies (after discount, if any) Rs. 0
b) Excise Duty, as applicable on (a) above at the rate : 10.00% Rs. 0
c) Amount on which Sales Tax is applicable 0.00 0
d) CST, as applicable on (a) + ED (b) above at the rate : 2.00% Rs. 0
e) VAT, as applicable on (a) + ED (b) above at the rate : 1.00% 0
g) Purchase Price for Entry Tax (Total Ex-Works+F&I+ED+CST+Others) Rs. 0
h) Entry Tax, as applicable on (e) above at the rate : Rs. 0.00
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal Statement of Quoted / Corrected Prices Page
Spec. No. NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610)
STATEMENT OF QUOTED / CORRECTED PRICES
All Figures are in Rupees
Sl. No. Price Component Quoted Price Corrected Price
1 TOTAL SCHEDULE NO. 1:Ex-Works Price of Plant and Equipment including Type Test Charges 0.00 0.00
2 TOTAL SCHEDULE NO.2: Local Transportation, Insurance and other Incidental Services. 0.00 0.00
3 TOTAL SCHEDULE NO.3: Installation Charges 0.00 0.00
4 TOTAL SCHEDULE NO.4: Training Charges Not Applicable Not Applicable
5 TOTAL BID PRICE: (Excluding Taxes & Duties) 0.00 0.00
6 DISCOUNT #REF! #REF!
7 NET BID PRICE (Excluding Taxes & Duties) #REF! #REF!
8 TAXES & DUTIES PAYABLE ADDITIONALLY
A) EXCISE DUTY #REF! 0.00
B) CENTRAL SALES TAX /VAT #REF! #REF!
C) ENTRY TAX / OCTROI #REF! #REF!
D) OTHERS #REF! 0.00
E) TOTAL TAXES & DUTIES #REF! #REF!
8 TOTAL BID PRICE (INCLUDING TAXES & DUTIES) #REF! #REF!
9 TOTAL SCHEDULE NO.7: Type Test Charges [Total of this Schedule is included in Schedule-1 above] 0.00 0.00
I) Bidder has indicated the following taxes and duties additionally applicable for their bid:
a) Excise Duty Rs. #REF!
b) CST /VAT Rs. #REF!
c) Entry Tax / Octroi Rs. #REF!
d) Others Rs. #REF!
II) Bidder has offered following discount(s)
III) With regard to Entry Tax, it may be mentioned that the substations covered under the subject pacakge falls in State of MP, where an entry tax @ 1% of Purchase Price is applicable. In view of the above, the taxes and duties inter-alia including entry tax applicable for the bids are calculated : Details of dicounts
a) Ex-Works Price of Direct Supplies (after discount, if any) Rs. 0 Gross LS #REF! #REF! #REF! Gross % #REF! #REF! #REF!
b) Excise Duty @ 10.3% of (a) above Rs. 0 #REF! #REF!
c) CST / VAT @ 2% of Ex-Works of Direct Supplies (a) + ED (b) above Rs. #REF! Sch-1 Direct LS #REF! #REF! #REF! Sch-1 Direct % #REF! #REF! #REF!
d) Others Rs. Sch-1 BO LS #REF! #REF! #REF! Sch-1 BO % #REF! #REF! #REF!
e) Purchase Price for Entry Tax (Total Ex-Works+F&I+ED+CST+Others) Rs. #REF! Sch-2 LS #REF! #REF! #REF! Sch-2 % #REF! #REF! #REF!
f) Entry Tax @ 1% of (e) above Rs. #REF! Sch-3 LS #REF! #REF! #REF! Sch-3 % #REF! #REF! #REF!
Sch-7 LS #REF! #REF! #REF! Sch-7 % #REF! #REF! #REF!
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal Statement of Quoted / Corrected Prices Page Different Manner #REF!
Text for Discount #REF!
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Name of Package : Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
Specification No. : NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610)
Completion Period 14 Months
: Attachments : General guidelines for filling up the Attachments : Package - :
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
Specification No.: NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610)
1 Fill up only green shaded cells in the relevent attachments.
2 Attachments 3(JV), 3(QR) 4, 4(A), 4(B), 5, 5(A), 6, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17,18 and Bid Form for 1st Envelope are included here.
3 Attachment 1 Bid Security : Not Applicable.
4 Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
5 Attachment 8 Manufacturer’s Authorisation Form : To be furnished as per proforma provided in the bidding document, on the letter head of the each Manufactures proposed to supply main items. Not included here.
6 Attachment 14 Integrity Pact : To be submitted as per ITB Clause No. 9.3(n) and as per remarks in the Attach 14-IP.
7 Attachment-19, Attachment-20, Attachment-21, Attachment-22, Attachment-23, Attachment-24, Attachment-25 : To be submitted as per the provisions of the Bidding Documents ( Formats Attached seperately in Volume-III of Bidding Documents)
Note : Enable the Active X Control & Macros. Also ensure to keep option of "Trust acess to VBA project object Model" cheched [√]. Ensure that you work on MS Excel 2007 or higher version.
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
Specification No.: NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Sole Bidder 1
Yes JV (Joint Venture) 2
Enter following details of the bidder No
Specify type of Bidder [Select from drop down menu] Sole Bidder Sole Bidder 2 0
Whether the bidder is an MSE (Micro & Small Enterprise) Joint Venture 2 2 0
Enter the Name of Registration Authority
Name of Sole Bidder
Address of Sole Bidder
Are you a ‘Local Suppliers’ under Public Procurement (Preference to Make in India) Order, 2017 and Order dated 20/12/2018 issued by Ministry of Power Yes
Full name of Bid Signatory
Designation of Bid Signatory
E-mail ID of Bid Signatory
Mobile No. of Bid Signatory Route-1 of Annexure-A(BDS)
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-3(JV) Sole Bidder
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Joint Venture Agreement and Power of Attorney for Joint Venture*)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept. &
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
Name(s) and Addresse(s) of other partner(s)
The Joint Venture Agreement (as per the proforma attached at no. 15 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) and Power of Attorney for Joint Venture (as per the proforma attached at no. 14 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) are enclosed herewith. Sole Bidder
Date : -- Printed Name : 0
Place : Designation : 14
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-3(QR)
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Qualifying Requirement Data)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
For our Qualifying Requirements Data, please refer Attachment-QR of this volume.
Date : -- Printed Name :
Place : Designation :
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) ATTACHMENT-3 (QR)
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Qualifying Requirement Data)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name: Power Grid Corporation of India Ltd.,
Address: Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
In support of the Qualification Requirements (QR) for bidders, stipulated in Annexure-A (BDS) of the Section - III (BDS), Volume-I & Additional Information required as per ITB clause 9.3(c) of the Bidding Documents, we furnish herewith our QR data/details along with other information, as follows herewith our stipulations have been reproduced in italics for ready reference, however, in case of any discrepancy the QR as given in BDS shall prevail).
We have submitted bid as :
We have submitted bid as joint venture of following firms :
[For details regarding Qualification Requirements of a Joint Venture, please refer para 4.0 below.]
We are furnishing the following details/document in support of Qualifying requirement for the subject package.
A Attached copies of original documents defining :
a) The constitution or legal status;
b) The principal place of business;
c) The place of incorporation (for bidders who are corporations); or the place of registration and the nationality of the Owners (for applicants who are partnerships or individually-owned firms).
B Attached original & copies of the following documents :
a) Written power of attorney of the signatory of the Bid to commit the bidder.
b) Joint Venture Agreement.
C Whether bidder anticipate any change in legal structure/ ownership of their organisation at present. If Yes, please enclose details of same and copy of procedural document(s) with reference to the same/ as required statutorily, as of now
1.0 GENERAL INFORMATION
Bidder is required to provide general information as per the following format.
[Where the Bidder proposes to use named subcontractor(s) for critical components of the works or for work contents in excess of ten (10) percent of the bid price, the following information should also be supplied for the subcontractor(s)].
S No. Particulars Sole Bidder
1 Name of the Firm 0 0 #REF!
2 Head Office/ Registered Office Address 0 0 #REF!
5 Contact Person
6 Place of Incorporation/ Registration
7 Year of Incorporation/ Registration
8 Nationality of
1.0 TECHNICAL REQUIREMENTS {Reference para 1.0 of Annexure-A (BDS)}
1.1 TECHNICAL EXPERIENCE
1.1 1.1 Route -1: The bidder must have executed similar works i.e. construction of transformer manufacturing facility with minimum 150MT EOT crane during last 07 years and same should be in satisfactory operation# as on the originally scheduled date of bid opening . : satisfactory operation means certificate issued by the Employer/Utility certifying the operation without any adverse remark. 1.2 Route – 2: Alternatively, the bidder who have experience in construction of transformer/ other manufacturing facility but not having the experience of installation of 150MT crane can also be considered provided that a) bidder must associate with a designer/consultant who has the experience for design and supervision of transformer manufacturing facility with minimum 150MT crane years and same should be in satisfactory operation# as on the originally scheduled date of bid opening #: satisfactory operation means certificate issued by the Employer/Utility certifying the operation without any adverse remark. ## Legally binding deed for association with designer/consultant for shall be provided by bidder
Format for individual firm or for different Partner of a Joint Venture (JV):
Bidder’s Name : 0
Single Firm/Lead Partner/Other Partners of a JV :
1 Are you manufacturer of ventilation system
2 Name of Contract Undertaken
3 Contract Reference No. & Date of Award
4 Name and Address of the Employer/Utility for whom the Contract was executed by the firm/Partner of a JV
(a)(i) Scope of work executed under the above contract (Tick only whichever is/are applicable)
5 Details/features of the Contract undertaken relevant to the stipulated QR (as in Sl No (i) of 2.1
i) Capacity of the system
ii) Value of work Rs. in crore
6 Capacity in which the Contract was undertaken (Check One) (Tick whichever is applicable)
7 Date of Completion of Contract
8 Details of documents furnished in the Bid, in support of the aforesaid data/details/information
2.0 FINANCIAL REQUIREMENTS :
Financial Position {Reference Annexure-A (BDS)}
a) Net worth for last 3 financial years should be positive.
a) 2.0 Financial Position: a. Net Worth for last 3 financial years should be positive. b. The minimum average annual turnover* (MAAT) for best three years i.e., thirty six (36) months out of Last Five (05) financial years of the bidder should be not less than INR 48.15 Crores. * Annual total income as incorporated in the profit & loss account except non-recurring income e.g. sale of fixed assets c. The bidder shall have liquid assets (LA) or/and evidence of access to or availability of credit facility of not less than INR 8.02 Crores
As part of supporting documents for meeting financial parameters of QR, the bidder shall furnish along with its Bid, complete annual reports together with audited statements of accounts of the company for last five years of its own (separate) immediately preceding the date of submission of the Bid. Note: (a) In the event the bidder is not able to furnish the information of its own (i.e. separate/standalone), the bidder should submit the audited balance sheets, income statements, other information pertaining to it only (i.e. separate/standalone basis and exclusive of its Subsidiaries/Group/ Holding/ Parent Company) duly certified by any one of the authority (i) Statutory Auditor of the bidder (ii) Company Secretary of the bidder or (iii) A certified Public Accountant] certifying that such information/documents are based on the audited accounts as the case may be. (b) Submission of provisional balance-sheet for latest financial year OR a certificate from the Chartered Accountant on their letterhead certifying the financial turnover/provisional balance sheet is not admissible 3. Requisite Technical and Financial Experience shall be of that Holding company only (i.e. excluding its subsidiaries/ group companies), in case bidder is a Group/ Holding/ Parent company, OR of that Subsidiary company only (i.e., excluding its holding company/ group companies), in case bidder is a Subsidiary of a holding company. 4. MSEs/STARTUPs meeting the specified Financial Position (i.e. MAAT requirement) shall also be considered qualified if they meet 80% (Eighty Percent) of the financial requirements specified. MSEs not meeting the Financial Qualifying Criteria shall also be eligible for consideration of award upto 25% of package award value as per "price preference" indicated in Bidding Documents.
* Note: (i) Annual total income as incorporated in the profit and loss account except non-recurring income e.g. sale of fixed assets. (ii) In case bidder is a holding company, the financial position criteria referred to in clause above shall be of that holding company only (i.e. excluding its subsidiary /group companies). In case bidder is a subsidiary of a holding company, the financial position criteria referred to in clause above shall be of that subsidiary company only (i.e. excluding it’s holding company).
c) Bidder shall have liquid assets (L.A) or/ and evidence of access to or availability of credit facilities of not less than Indian Rs. 2.23 Crore
Note: In case bidder is a holding company, the Financial Position referred to in clause 1.2 shall be of that holding company only (i.e. excluding its subsidiaries/ group companies). In case bidder is a subsidiary of a holding company, the Financial Position referred to in clause 1.2 shall be of that subsidiary company only (i.e., excluding its holding company).
The bidder shall submit complete annual reports together with Audited statement of accounts of the company for last five years of its own (separate) immediately preceding the date of submission of bid
{In support of its ‘Financial Position’, in line with the above, the Bidder must provide the relevant information in support of the same, along with documentary evidence, in the following format}
For Bidders to qualify for both the packages, their financial position shall not be less than the sum of the requirement for the packages they propose to qualify for.
4.0 Financial Qualification Data: 1
Name of the Bidder
B Turnover details:
Turnover (in Crores) Details of documentary evidence submitted in support of Qualification Data
Sl No Financial year
Do you have audited results for FY 2020-21 Yes
Average Annual Turnover for best Three Years is
*(Indicate the rate(s) of exchnage against US Dollar at the end of each year, which have been used for arriving the amount at equivalent US Dollar.)
C Liquid Assets
Currency LA Equivalent US$ (in Million)
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
Networth Equivalent US$ (in Million) exchange rate* Details of documentary evidence submitted in support of Qualification Data
Currency Networth (in Millions)
Sl No Financial year
Do you have audited results for FY 2012-13 Yes
*(Indicate the rate(s) of exchnage against US Dollar at the end of each year, which have been used for arriving the amount at equivalent US Dollar.)
B Turnover details:
Turnover Equivalent US$ (in Million) exchange rate* Details of documentary evidence submitted in support of Qualification Data
Currency Turnover (in Millions)
Sl No Financial year
Do you have audited results for FY 2012-13 Yes
Average Annual Turnover for best Three Years is
*(Indicate the rate(s) of exchnage against US Dollar at the end of each year, which have been used for arriving the amount at equivalent US Dollar.)
C Liquid Assets
Currency LA Equivalent US$ (in Million)
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
4.0 Joint Venture (JV) Firms {Reference para 3.0 of Annexure-A (BDS)}
4.1 In accordance with the above, in case of JV bidders, it should be ensured that necessary details including those pertaining to each JV partner are furnished and the documents are submitted alongwith the bid. Further, the JV bidders should also ensure that other requirements are complied with. The lists of documents furnished are to be indicated below :
5.0 The Bidder shall also furnish following documents/details with its bid. {Reference ITB clause 9.3 (c)}
5.1 The complete annual reports together with Audited statement of accounts of the company for last five years of its own (separate) immediately preceding the date of submission of bid.
Note I. In the event the bidder is not able to furnish the information of its own (i.e separate), being a subsidiary company and its accounts are being consolidated with its group/holding/parent company, the bidder should submit the audited balance sheets, income statements, other information pertaining to it only (not of its group/Holding/Parent Company) duly certified by any one of the authority [ (i) Statutory Auditor of the bidder /(ii) Company Secretary of the bidder or (iii) A certified Public Accountant] certifying that such information/documents are based on the audited accounts as the case may be.
II. Similarly, if the bidder happens to be a Group/Holding/Parent Company, the bidder should submit the above documents/information of its own (i.e. exclusive of its subsidiaries) duly certified by any one of the authority mentioned in Note-I above certifying that these information/documents are based on the audited accounts, as the case may be.
5.2 The Bidder should accordingly also provide the following information/documents (In case of JV bidders, information should be provided separately for all the Partners of JV in the given format):
Audited balance sheet and income statements for the last five years as per the following:
A Years preceding to the bid opening Audited Balance Sheet and Income Statements enclosed Audited Balance Sheet and Income Statements enclosed Audited Balance Sheet and Income Statements enclosed
1st Year Yes Yes
2nd Year Yes Yes
3rd Year Yes Yes
4th Year Yes Yes
5th Year Yes Yes
5.3 Whether bidder organisation is underway of Financial re-structuring. If Yes, please enclose the details of same and data/ documents establishing the same
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-4
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Form of Certificate of Origin and Eligibility)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We hereby certify that equipment and materials to be supplied are produced in [Name of Countries], eligible source country. Equipments & Materials produced in [Name of countries] Company incorporated & registered in [Name of countries]
We hereby certify that our company is incorporated and registered in [Name of Countries], eligible source country. [Name of Countries] [Name of Countries] [Name of Countries], [Name of Countries],
Date : -- Printed Name :
Place : Designation :
country. country. [Name of Countries], [Name of Countries],
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-4(A)
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles are included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
S.No. For Equipment Item Description Unit Quantity
Notwithstanding what is stated above, we further confirm that any additional special maintenance tools and tackles, required for the equipment under this package shall be furnished by us at no extra cost to the employer.
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-4(B)
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles which are to be taken back after the completion of the work by us are not included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-5
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Bought-out & Sub-contracted Items)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We hereby furnish the details of the items/ sub-assemblies, we propose to buy for the purpose of furnishing and installation of the subject Package:
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
Name Nationality
We hereby declare that, we would not subcontract the erection portion of the contract without the prior approval of Employer.
We hereby furnish the details of the items/ sub-assemblies propose to supply from our own works (i.e. as direct transactions) in additiona to the supplies the same from other vendors (i.e. as Bought-out transactions) as detailed in the table given above.
Sl. No. Item Description Quantity proposed to be supplied Details of the plant from where supplies are proposed.
Name of Plant Address
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Annexure I to Attachment-5
(Bought-out & Sub-contracted Items)
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
Name Nationality
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Annexure I to Attachment-5
(Bought-out & Sub-contracted Items)
Sl. No. Item Description Details of the proposed sub-contractor/sub-vendor Details of the proposed sub-contractor/sub-vendor
Name Nationality
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-5A
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises)
Bidder's Name and Address: Contracts & Materials dept.
Power Grid Corporation of India Ltd.,
Name : Northern Region–I, Regional Headquarter,
Address : SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
1 We hereby furnish the details of the items, components, raw material, services which we propose to buy/avail from Micro and Small Enterprises (MSEs) for the purpose of completion of works under the subject package:
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Name of Micro and Small Enterprises (MSEs)
Name Category (Micro or Small)
2 The above is a list of items we propose to procure from MSEs. However, based on the situations during the execution of the contract, the above list may undergo changes. We hereby confirm that the details regarding actual procurement from MSEs carried out by us, as per the format provided at Section VI, Forms and Procedures, Volume-I of bidding documents, shall be submitted along with the bills for payment against supplies made/works done during execution of contract.
We hereby furnish the details of the items/ sub-assemblies propose to supply from our own works (i.e. as direct transactions) in additiona to the supplies the same from other vendors (i.e. as Bought-out transactions) as detailed in the table given above.
Sl. No. Item Description Quantity proposed to be supplied Details of the plant from where supplies are proposed.
Name of Plant Address
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-5A
(Bought-out & Sub-contracted Items)
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Name of Micro and Small Enterprises (MSEs)
Name Category (Micro or Small)
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-6
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Alternative, Deviations and Exceptions to the Provisions)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Annexure I toAttachment-6
(Alternative, Deviations and Exceptions to the Provisions)
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-7
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Details of Alternative Bid)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
No Alternative Bid
Date : -- Printed Name :
Place : Designation :
NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-9
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Work Completion Schedule)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We hereby declare that the following Work Completion Schedule shall be followed by us in furnishing and installation of the subject Package i.e., Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal for the period commencing from the effective date of Contract to us :
Sl. No. Description of Work Period in months from the effective date of contract
1 Detailed Engineering and drawing submission
a) commencement
2 Procurement of equipment/ components & assembly
a) commencement
a) commencement
4 Manufacturing
a) commencement
5 Shipments & Delivery
a) commencement
6 Establishment of site office
7 Installation at Site
a) commencement
8 Testing & Pre-commissioning
a) commencement
9 Trial Operation
a) commencement
Date : -- Printed Name :
Place : Designation :
Note : Bidders to enclose a detailed network covering all the activities to be undertaken for completion of the project indicating key dates for various milestones for each phase constituent-wise.
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-10
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Guarantee Declaration)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
Dear Sir, We declare that the equipments offered shall have minimum (or a maximum, as the case may be) performance specified in Technical Specification. We further guarantee the performance/efficiency of the equipments in response to the Technical Specifications.
Date -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-11
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Information regarding Ex-employees of POWERGRID in our Organisation)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We declare that we are aware of and have gone through the “Code of Business Conduct and Ethics for Senior Management Personnel”1 and “Code of Business Conduct and Ethics for Board Members”1 of POWERGRID (hereinafter referred to as the “Code of Conduct”). We further understand that as per the “Code of Conduct”, Senior Management Personnel including Board Members, who have retired/resigned from POWERGRID, shall not accept any appointment or post, as detailed in the referred “Code of Conduct”, within 1 year from the date of cessation of service/directorship unless approved by the Competent Authority. Accordingly, we hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation*
*In case the date of joining in the bidder’s organization of such ex-employee is within 1 year from the date of retirement/resignation from POWERGRID, No Objection Certificate/ approval from the Competent Authority must be furnished along with the bid or subsequent through clarification pursuant to ITB Clause 21.
In case of non-submission of No Objection Certificate/approval of the Competent Authority, as required, We understand that POWERGRID shall deal with such cases as per its Policy and procedures in vogue, which may also result in rejection of our bid. We also confirm that POWERGRID shall be the sole judge in this regard. We further declare that any misrepresentation or submission of false/forged documents/information in this regard shall be dealt with as per the provisions of the Integrity Pact and/or the Bidding Documents and/or POWERGRID’s policy and procedures.
Date : -- Printed Name :
Place : Designation :
Note: 1. “Code of Business Conduct and Ethics for Senior Management Personnel” and “Code of Business Conduct and Ethics for Board Members” are available on POWERGRID’s website https://www.powergridindia.com. 2. The information in similar format should be furnished for each partner of joint venture in case of joint venture bid. 3. In case bidder has furnished no details on ex-employees of POWERGRID or has left blank or has indicated ‘-‘ against the same, it shall be deemed that they have not employed any such person in their organization.
SPEC. NO.: CC-CS/1059-NR3/GIS-4170/10/G7 ATTACHMENT-12
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Price Adjustment Data)
Bidder’s Name and Address (Sole Bidder) : To:
0 Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
PRICES REMAIN FIRMS AND FIXED
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-13
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Declaration regarding Social Accountability)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-14
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
Integrity Pact is annexed herewith this Volume.
Date : -- Printed Name :
Place : Designation :
Instruction for printing & submitting Integrity Pact
1. The requisite format of Integrity Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Integrity Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (o).
Power Grid Corporation of India Limited
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai,New Delhi – 110016 hereinafter referred to as
having its Registered Office at
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 1 of 8
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal Package and Specification Number NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) POWERGRID values full compliance with all relevant laws of the land, rules, regulations, economic use of resources, and of fairness / transparency in its relations with its Bidders/ Contractors.
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Integrity Pact' which will form a part of the bid.
It is hereby agreed by and between the parties as unde r:
Section I - Commitments of POWERGRID
(1) POWERGRID commits itself to take all measures necessary to prevent corruption and to observe the following principles :
a) No employee of POWERGRID, personally or through family members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for him/herself or third person, any material or other benefit which he/she is not legally entitled to.
b) POWERGRID will, during the tender process treat all Bidder(s) with equity, fairness and reason. POWERGRID will in particular, before and during the tender process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/ additional information through which the Bidder(s) could obtain an advantage in relation to the tender process or the contract execution.
c) POWERGRID will exclude from evaluation of Bids its such employee(s) who has any personal interest in the Companies/Agencies participating in the Bidding/Tendering process and all known prejudiced persons.
(2) If POWERGRID obtains information on the conduct of any of its employee which is a criminal offence under the IPC / PC Act , or if there be a substantive suspicion in this regard, POWERGRID will inform its Chief Vigilance Officer and in addition disciplinary actions can be initiated under POWERGRID’s Rules.
Section II - Commitments of the Bidder/Contractor
(1) The Bidder/Contractor commits itself to take all measures necessary to prevent corruption. The Bidder/Contractor commits itself to observe the following principles during its participation in the tender process and during the contract execution:
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 2 of 8
a) The Bidder/Contractor will not, directly or through any other person or firm, offer, promise or give to any of POWERGRID's employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which it is not legally entitled to, in order to obtain in exchange an advantage of any kind whatsoever during the tender process or during the execution of the contract.
b) The Bidder/Contractor will not enter into any illegal or undisclosed agreement or understanding, whether formal or informal with other Bidders/Contractors. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or actions to restrict competitiveness or to introduce cartelization in the bidding process.
c) The Bidder/Contractor shall not pass any information provided by POWERGRID as part of business relationship to others and shall not commit any offence under PC / IPC Act.
d) The Bidder/Contractor of foreign origin shall disclose the name and address of the Agents/representatives in India, if any, involved directly or indirectly in the Bidding. Similarly, the Bidder/Contractor of Indian Nationality shall furnish the name and address of the foreign principals, if any, involved directly or indirectly in the Bidding.
e) The Bidder/Contractor will, when presenting his bid, disclose any and all payments made, or committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract and/or with the execution of the contract.
f) The Bidder/Contractor will not misrepresent facts or furnish false/forged documents/information in order to influence the bidding process or the execution of the contract to the detriment of POWERGRID.
g) The Bidder/Contractor shall ensure adoption of Integrity Pact by its Sub-contractors and shall be responsible for the same.
(2) The Bidder/Contractor will not instigate third persons to commit offences outlined above or be an accessory to such offences.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 3 of 8
Section III- Disqualification from tender process and exclusion from future contracts
(1) If the Bidder, before contract award, has committed a transgression through a violation of Section II or in any other form such as to put his reliability or credibility as Bidder into question, POWERGRID may disqualify the Bidder from the tender process or terminate the contract, if already signed, for such reason.
(2) If the Bidder/Contractor has committed a transgression through a violation of Section II such as to put his reliability or credibility into question, POWERGRID may, after following due procedures, ban /blacklist the Bidder/Contractor in line with POWERGRID’s policy for “Black-Listing of Firms / Banning of Business”. The imposition and duration of the ban will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder/Contractor and the amount of the damage. The ban will be imposed for a maximum of 3 years.
(3) If the Bidder/Contractor can prove that he has restored/recouped the damage caused by him and has installed a suitable corruption prevention system, POWERGRID may revoke the ban prematurely.
Section IV - Liability for violation of Integrity Pact
(1) If POWERGRID has disqualified the Bidder from the tender process prior to the award under Section III, POWERGRID is entitled for forfeiture of the Bid Guarantee under the Bid.
(2) If POWERGRID has terminated the contract under Section III or if POWERGRID is entitled to terminate the contract under Section III, POWERGRID shall be entitled to forfeit the Contract Performance Guarantee of this contract, in full or part thereof as may be decided, besides resorting to other remedies under the contract.
Section V- Previous Transgression
(1) The Bidder shall disclose in its Bid any transgressions occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country, that may impinge on the Anti-corruption principle.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 4 of 8
(2) If the Bidder makes incorrect statement on this subject, it can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason and further action can be taken in line with POWERGRID’s policies.
Section VI - Equal treatment to all Bidders / Contractors
(1) POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
(2) POWERGRID will disqualify from the tender process any bidder who does not sign this Pact or violate its provisions.
Section VII - Punitive Action against violating Bidders / Contractors
If POWERGRID obtains knowledge of conduct of a Bidder or a Contractor or its subcontractor or of an employee or a representative or an associate of a Bidder or Contractor or his Subcontractor which constitutes corruption, or if POWERGRID has substantive suspicion in this regard, POWERGRID will inform the Chief Vigilance Officer (CVO).
(*)Section VIII - Independent External Monitor/Monitors
(1) POWERGRID has appointed a panel of Independent External Monitors (IEMs) for this Pact with the approval of Central Vigilance Commission (CVC), Government of India. The names of the IEMs have been indicated in the Bidding Documents.
(2) The panel of IEMs shall review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement. The panel of IEMs has right of access to all project documentation. The panel of IEMs may examine any complaint received by them and submit a report to Chairman-cum-Managing Director, POWERGRID, giving joint findings, at the earliest. The panel of IEMs may also submit a report directly to the CVO and the CVC, in case of suspicion of serious irregularities attracting the provisions of the PC Act.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 5 of 8
(3) The IEM is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He / She reports to the Chairman-cum-Managing Director, POWERGRID.
(4) The Bidder(s)/Contractor(s) accepts that the IEM has the right to access without restriction to all documentation of POWERGRID related to this contract including that provided by the Contractor/Bidder. The Bidder/Contractor will also grant the IEM, upon his / her request and demonstration of a valid interest, unrestricted and unconditional access to their documentation. The same is applicable to Subcontractors. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.
(5) POWERGRID will provide to the IEMs information as sought by him / her which could have an impact on the contractual relations between POWERGRID and the Bidder/Contractor related to this contract. The IEMs shall also sign declaration on ’Non-Disclosure of Confidential Information’ and of ‘Absence of Conflict of Interest’. In case of any conflict of interest arising at a later date, the IEM shall inform Chairman-cum-Managing Director, POWERGRID and recuse himself/herself from that case
(6) As soon as the IEM notices, or believes to notice, a violation of this agreement, he / she will so inform the Chairman-cum-Managing Director, POWERGRID and request the Chairman-cum-Managing Director, POWERGRID to discontinue or take corrective action, or to take other relevant action. The IEM can in this regard submit non-binding recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. However, the IEM shall give an opportunity to POWERGRID and the Bidder/Contractor, as deemed fit, to present its case before making its recommendations to POWERGRID.
(7) The IEM will submit a written report to the Chairman-cum-Managing Director, POWERGRID within 8 to 10 weeks from the date of reference or intimation to him by POWERGRID and, should the occasion arise, submit proposals for correcting problematic situations.
(8) If the IEM has reported to the Chairman-cum-Managing Director, POWERGRID, a substantiated suspicion of an offence under PC / IPC Act, and the Chairman-cum-Managing Director, POWERGRID has not, within the reasonable time taken visible action to proceed against such offence or reported it to the CVO, the Monitor may also transmit this information directly to the CVC, Government of India.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 6 of 8
(9) While representing any matter in relation to the Integrity pact inter-alia including its transgression to the panel of IEMs, POWERGRID and Bidder/Contractor shall not approach the court of law and await the decision of the IEM in the matter.
(10) The word ‘IEM’ would include both singular and plural.
(*) This Section shall be applicable for only those packages wherein the IEMs have been identified in Section – I : Invitation for Bids and/or Clause ITB 9.3 in Section – III: Bid Data Sheets of Conditions of Contract, Volume-I of the Bidding Documents.
Section IX - Pact Duration
This Pact begins when both parties have legally signed it. It expires for the Contractor after the closure of the contract and for all other Bidder's six month after the contract has been awarded.
Section X - Other Provisions
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact.
(2) Changes and supplements as well as termination notices need to be made in writing. Side agreements have not been made.
(3) If the Contractor is a partnership firm or a consortium or Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venture partners.
(4) Nothing in this agreement shall affect the rights of the parties available under the General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
(5) Issues like Warranty/Guarantees etc. shall be outside the purview of IEMs.
(6) Views expressed or suggestions/submissions made by the parties and the recommendations of the CVO/IEM# in respect of the violation of this agreement, shall not be relied on or introduced as evidence in the arbitral or judicial proceedings (arising out of the arbitral proceedings) by the parties in connection with the disputes/differences arising out of the subject contract.
# CVO shall be applicable for packages wherein IEM are not identified in Section IFB/BDS of Condition of Contract, Volume-I. IEM shall be applicable for packages wherein IEM are identified in Section IFB/BDS of Condition of Contract, Volume-I.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 7 of 8
(7) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 2 : Witness 2 :
Designation : Designation :
Integrity Pact Page 8 of 8
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-15
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
Option for Initial Advance (either Interest Bearing Initial Advance or No Initial Advance) and Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
Bidder’s Name and Address (Sole Bidder) : Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
I We have read the provisions in the Bidding Documents regarding furnishing the option for advance payment. Accordingly, as per ITB Clause 9.3 as provided in Section BDS, Section III, Vol.-I of the Bidding Documents, we hereby confirm to opt the following:
Interest Bearing Initial Advance
Supply Portion:
Services Portion:
II We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1. Name of the Supplier/ Contractor in whose favour payment is to be made
2. Address with PIN Code and State
Registered Office:
Correspondence Address:
3 (a). Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
3 (b). Are you a MSE owned by SC/ST* entrepreneurs in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012 including subsequent amendment /notification/order (Indicate Yes/No) Note: Documentary evidence is to be attached. Please refer remarks at the end of the Attachment.
3 (c). If 3(b) is 'Yes', please mentiom whether you are (Proprietary MSE/ Partnership MSE/Private Limited Company) owned by SC/ST Entrepreneurs.
3 (d). Are you a MSE owned by a women in line with Public Procurment Policy for Micro and Small Enterprises (MSEs) order 2012, Public Procurment Policy for Micro & Small Enterprises (MSEs) Amendment Order 2018 including subsequent amendment / notification/order . (Indicate Yes/No)
4. Permanent Account (PAN) No.
5. GSTIN Numbers
I. GSTIN in the Sates/UT from where the supply of goods take place
Name of the States/UT GSTIN number
II. GSTIN in the States/UT where the supply for services take place (states where sites under the subject package is situated)
Name of the States/UT GSTIN number
6. PF Registration No. of the Company
7. PF Regional Office covered (with Address)
8. Name of Contact Person
9. Contact Details
10. Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account:
Type of Account: Current Account
11. 9 digit MICR code printed at bottom in middle, next to cheque no.
12. IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
*The definition of MSEs owned by SC/ST is as given under:
a. In case of proprietary MSE, proprietor(s) shall be SC /ST.
b. In case of partnership MSE, the SC/ST partners shall be holding at least 51% shares in the unit.
c. In case of Private Limited companies, at least 51% share shall be held by SC/ST promoters.
Documentary evidence: Please provide scanned copy(ies) of the SC/ST certificate(s) issued by District Authority as applicable for SC/ST MSE category as per (a), (b) or (c) above.
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-16
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Additional Information)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
In support of the additional information required as per ITB Sub-Clause 9.3 (p) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):
1.0 The Bidder shall furnish
A certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3(p)(i)]
1.1 In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of the Bidder (Sole Bidder)
Name of the Banker by whom certificate issued
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
1.2 The Bidder should accordingly also provide the following information/documents
(i) Details of Banker:
Address of Banker
Contact Name and Title
(ii) As per para 1.0, Authorization Letter(s) from the bidder (in case of JV bidder, from all the partners) addressed to the Banker(s), authorizing POWERGRID to seek queries about the bidder with the Banker(s) and advising the Banker(s) to reply the same promptly, is/are enclosed as per following details:
Sl. No. Letter Ref. Date Addressed to (name of the Bank)
2.0 Litigation History
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid. [Reference ITB clause 9.3(p)(ii)]
2.1 Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
3.0 Details regarding previous transgressions of Integrity Pact
The bidder should provide detailed information on any transgression of Integrity Pact that occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country.
3.1 Details regarding previous transgressions of Integrity Pact that occurred in the last 10 years
Year Name of client Details of Transgression of Integrity Pact by the bidder
4.0 OTHER INFORMATION
4.1 Current Contract Commitments of works in progress
Bidders (individual firms or each partners of JV) should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
4.2 Financial Data:
Details Actual (Previous five years) Projection for next five years
Total Liability
Current Liability
Profit before taxes
Profit after taxes
5.0 Details of Provident Fund Code Number of the Bidder [ref. ITB9.3(q)]
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-17
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Declaration for tax exemptions, reductions, allowances or benefits)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
1 We confirm that we are solely responsible for obtaining following tax exemptions, reductions, allowances or benefits in respect of supplies under the subject package, in case of award. We further confirm that we have considered the same in our bid thereby passing on the benefit to POWERGRID while quoting our prices. In case of our failure to receive such benefits, partly or fully, for any reason whatsoever, the Employer will not compensate us.
2 We are furnishing the following information required by the Employer for issue of requisite certificate if and as permitted in terms of the applicable Govt. of India policies/procedures (in case of award):
Applicable Act, Notification No. and Clause Ref. No. Sl. No. Description of item on which applicable Country of origin Remarks, if any
(The requirements listed above are as per current Notification of Govt. of India indicated above. These may be modified, if necessary, in terms of the Notifications.)
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-17
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contracts & Materials dept.
Name : …… ……. …….. …… ……. …….. Power Grid Corporation of India Ltd.,
Address : …… ……. …….. …… ……. …….. Northern Region–I, Regional Headquarter,
…… ……. …….. …… ……. …….. SCO Bay No. 5 to 10, Sector 16A,
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-17
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-18
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
Safety Pact is attached herewith this Volume
Date : -- Printed Name :
Place : Designation :
Instruction for printing & submitting Safety Pact
1. The requisite format of Safety Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other six pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Safety Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (s).
Between #REF! #REF!
Power Grid Corporation of India Limited #REF! #REF!
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as #REF! #REF!
"POWERGRID", #REF! #REF!
0 1 having its Registered Office at ,
having its Registered Office at ,, 1 AND
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal Specification Number:NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610)
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Safety Pact Page 1 of 6
POWERGRID values full compliance with all relevant laws and regulations and the principles of Safety, Health& Environment in its relations with its Bidders/ Contractors.
In order to achieve these goals, POWERGRID and the above named Bidder / Contractor enter into this agreement called “Safety Pact” which will form part of the Bid.
It is hereby agreed by and between the parties as under:
Section I - Commitments of POWERGRID
POWERGRID commits itself to take all measures necessary to prevent accidents duringConstruction and Operation of the Transmission Assets and to observe the following:
1. POWERGRID recognizes and accepts its statutory responsibilities for ensuring construction, operation and maintenance of equipments and for the provision of safe methods of work and safe working conditions.
2. POWERGRID recognizes and accepts its statutory responsibilities for ensuring safety of not only its employees but also that of the Contracting Agencies as Principal Employer.
3. POWERGRID shall review the accidents in a structured manner and take necessary actions to ensure that the safety criteria are strengthened for safe construction as well as Operation & Maintenance of the Transmission Assets.
4. POWERGRID shall conduct necessary awareness and training programmes to its Employees to augment the various safety requirements to be followed during Construction and Operation & Maintenance of the Transmission Assets from time to time.
5. POWERGRID shall, from time to time, issue necessary guidelines,instructions and deterrents to its employees as well as to the Contracting Agencies, to update them to take necessary preventive measures to avoid repetition of similar accident attributes.
6. POWERGRID shall review and provide necessary guidanceto the Contracting Agencies, as and when, any abnormality / special situations are brought to its notice by the Contracting Agencies during execution of the Transmission Projects being executed by them.
7. POWERGRID shall conduct periodical surveillance site inspections / audits to identify the unsafe conditions and unsafe actions, and bring them to the knowledge of the Contracting Agencies for taking timely corrective actions.
8. POWERGRIDshall investigate all accidents, fatal as well as non-fatal, to identify the lapses, the reason for the accident / incident and suggest measures for prevention of recurrence of such accidents, and fix responsibility for the lapses leading to the accident.
9. POWERGRID shall augment the training to the workers and supervising personnel of the Contracting Agencies, as per schedules, upon nomination by the Contracting Agencies in reasonable time frame.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Safety Pact Page 2 of 6
10. POWERGRID shall exercise the right to claim and recover compensation from the Contracting Agencies in case of any violation of the safety requirements / provisions during execution of the Transmission Projects, as built in the applicable Laws and contractual specifications / guidelines in vogue / issued by POWERGRID from time to time.
Section II – Commitments of the Bidder / Contractor:
The Bidder / Contractor commits himself to take all measures necessary to prevent / minimise accidents at their construction / erection sites and to observe the following:
1. The Bidder / Contractor recognizes and acceptsthe statutory and comprehensive responsibility for ensuring safe construction and Testing & Commissioning in the Transmission Projects being executed by them by providing safe methods of work, working conditions and Tools & Plants for human safety.
2. The Bidder / Contractor recognizes and accepts the responsibilities for ensuring safety of not only their employees but also that of the Sub-contractors, Principal Employer and the general public during execution of the Transmission Projects / works.
3. The Bidder / Contractor shall review the accidents in a structured manner and take necessary actions to ensure that the safety criteria are strengthened for safe construction of the Transmission Assets.
4. The Bidder / Contractor shall endeavour continuous development of safe methods of work to ensure that the effect of risks and perils are minimised to the extent possible and implement the same at their worksites.
5. The Bidder / Contractor shall conduct periodical Training to their Employees as well as to that of their Sub-contractors for safety awareness during construction works being executed by them.
6. The Bidder / Contractor shall provide all requisite Tools & Plants required for the work and ensure their healthiness by periodical inspections / testing as required. Unhealthy and sub-standard Tools & Plants will be immediately removed from site as and when they are identified.
7. The Bidder / Contractor shall,at their cost, provide all necessary Personal Protective Equipments such as Double Lanyard Safety Belts, Appropriate Fall Arrest Systems, Safety Helmets, Foot Wear, Hand Gloves, etc., as required for various activities pertaining to execution of the Projects / works, confirming to relevant Indian Standards.
8. The Bidder / Contractor shall ensure that dedicated qualified Safety Officers are posted in the construction projects being executed by them and ensure that the Safety Officer visits each and every gang periodically and conducts audits / inspections to identify the unsafe conditions and unsafe actions, to be rectified by the site supervising personnel promptly.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Safety Pact Page 3 of 6
9. The Bidder / Contractor shall conduct appropriate medical checks-up for the workers before deploying them at their construction sites to ensure that only those who are medically fit are deployed in the Projects / works to be executed by them. The copy of the Medical Reports shall be provided by the Bidder / Contractor to POWERGRID, whenever requested by POWERGRID.
10. The Bidder / Contractor shall screen the workers before deploying them at their construction sites to ensure that only those with the skills, experience and competence to work at height and also medically fit for work at height are deployed for work at height in the Projects executed by them.
11. The Bidder / Contractor shall ensure daily before starting the work that their site Supervising Personnel / Safety Officer briefs the workers about the work for the day and the safety measures / precautions required to be taken by them.
12. The Bidder / Contractor shall investigate all the accidents at their working sites to ascertain the lapses leading to the incident and the precautionary / corrective measures required to be taken to avoid recurrence of such accidents. These accidents will be reviewed at the Board Management level of the Agencies and the findings / recommendations will be put up to POWERGRID Apex Safety Board within the stipulated period.
13. The Bidder / Contractor shall ensure that all accidents, whether fatal or non-fatal in nature, will be informed to POWERGRID, in writing, immediately on the occurrence of the same,and in any case, within not more than 24 hours of occurrence of the same.
14. The Bidder / Contractor shall ensure that in case of any accident, all necessary medical help / support shall be provided to the victims / injured till they are completely fit to return to work.
15. The Bidder / Contractor shall ensure that in case of fatal accidents, all statutory Authorities, including Police, concerned Labour Dept. Officials, concerned Workmen Compensation Commissioner, etc., will be intimated in writing as required by the statutory Law, and followed up for compliance of all statutory obligations. The Bidder / Contractor shall own full responsibility of timely accident reporting to various authorities, including POWERGRID.
16. The Bidder / Contractor shall ensure that in case of fatality or serious injury leading to permanent disablement of the victims, the compensation amount will be deposited with the concerned authorities, as required by the Laws, and followed up for early disbursement to the beneficiaries of the victims.
17. The Bidder / Contractor assures that they shall co-operate to the fullest extent for carrying out any investigation of the accidents at their work sites by POWERGRID to identify the lapses, the reason for the accident / incident and suggest measures for prevention of recurrence of such accidents. All factual details of the occurrence of the accident will be provided to POWERGRID, as and when required.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Safety Pact Page 4 of 6
18. The Bidder / Contractor assures that they take full responsibility of meeting the statutory obligations in case of accidents, and in case of any reference by any Statutory Body at a later date also, they shall provide all information to POWERGRID and meet all the statutory obligations, including payment of additional compensation, if any.
19. The Bidder / Contractor assures that in case of any inspection of their work site or Notice by any Statutory Authority, they shall comply promptly and inform POWERGRID Site Officials of the same, and also provide all necessary information and assistance for smooth compliance of the observations / instructions of such Authorities.
20. The Bidder / Contractor accepts the provisions regarding safety, including payment of any sums to POWERGRID, in case of any violation of the safety requirements / provisions during execution of the Transmission Projects, as built in the Contractual Conditions, Safety Planand the Safety Pact, and confirm to abide by the same.
Section III – Equal treatment to all Bidders / Contractors:
1. POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
2. POWERGRID will disqualify, from the tender process, any bidder/ take punitive actions on the bidder, who does not sign this Pact or violate its provisions.
Section IV – Pact Duration:
This Pact begins when both parties have legally signed it. It expires for the successful Bidder / Contractor after closure of the contract and, for all other Bidders, after the contract has been awarded.
Section V – Other Provisions:
1. This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under the Safety Pact.
2. Changes and supplements need to be made in writing, which shall come into force only upon mutual agreement / acceptance.
3. If the Contractor is a partnership firm or consortium of Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venue partners, as applicable as per the Tender Specifications.
4. Nothing in this agreement shall affect the rights of the parties available under General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
5. Should one or several provisions of this agreement turn out to be invalid, the reminder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Safety Pact Page 5 of 6
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 2 : Witness 2 :
Designation : Designation :
Safety Pact Page 6 of 6
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Attachment-19
Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
Further, we hereby confirm that except as mentioned in the Attachment – 6 (Alternative, Deviations and Exceptions to the Provisions) hereof forming part of our First Envelope :
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/09005 (RFX- 5002004610) Bid Form 1st Envelope 1 one 1 st 1 January
2 two 2 nd 2 February
BID FORM (First Envelope) 3 three 3 rd 3 March
4 four 4 th 4 April
Bid Proposal Ref. No. 5 five 5 th 5 May
Date : -- 6 six 6 th #VALUE! 6 June
7 seven 7 th #VALUE! 7 July
To: 8 eight 8 th #VALUE! 8 August
Contracts & Materials dept. 9 nine 9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 ten 10 th 10 October
Northern Region–I, Regional Headquarter, 11 eleven 11 th 11 November
SCO Bay No. 5 to 10, Sector 16A, 12 twelve 12 th 12 December
Faridabad-121002, Haryana 13 thirteen 13 th
14 fourteen 14 th
Name of Contract : Construction of Transformer and Reactor repair facility at ±500kV HVDC Bhiwadi terminal 15 fifteen 15 th
Dear Ladies and/or Gentlemen, Enter details here. 16 sixteen 16 th
1.0 Having examined the Bidding Documents, including Amendment Nos. dated 00/01/1900 the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). 17 seventeen 17 th
1.1 We meet the eligibility requirements and have no conflict of interest in accordance with ITB Clause 2.
2.0 Attachments to the Bid Form (First Envelope) Bank Draft 18 eighteen 18 th
In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments: Pay Order 19 nineteen 19 th
(a) Attachment 1 : Bid Securing Declaration Banks certified Cheque Zero 20 twenty 20 th
Or Online Payment Acknowledgement towards Bid Security for a sum of INR
Or documentary evidence in support of exemption of Bid Security, in separate envelope in accordance with clause 13.1 of ITB, Section-II
(b) Attachment 2: A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. Bank Guarantee (0) 21 st
(c) Attachment 3 : The documentary evidence that we are eligible to bid in accordance with ITB Clause 2. Further, in terms of ITB Clause 9.3 (c) & (e), the qualification data has been furnished as per your format enclosed with the bidding documents Attachment-3(QR). 22 th
Further, the required Joint Venture Agreement signed by us and our Partners has also been furnished as per your format Attachment-3(JV). #REF! Applicable 23 th
Further the required deed of Joint Undertaking signed by us and Tower Manufacturer has also been furnished as per your format. 0 #REF! Not Applicable 24 th
(d) Attachment 4 : The documentary evidence establishing in accordance with ITB Clause 3, Vol.-I of the Bidding Documents that the facilities offered by us are eligible facilities and conform to the Bidding Documents has been furnished as Attachment 4. A list of Special Tools & Tackles to be used by us for erection, testing & Commissioning and to be handed over to Employer, the cost of which is included is our Bid Price, is also enclosed as per your format as Attachment 4A. A list of Special Tools & Tackles to be brought by the contractor for erection, testing & Commissioning and to be taken back after completion of work, whose cost in not included in our bid price, is enclosed as per your format as Attachment 4B. 25 th
(e) Attachment 5 : The details of all major items of services or supply which we propose subletting in case of award, giving details of the name and nationality of the proposed subcontractor/sub-vendor for each item. 26 th
(f) Attachment 5A : Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises
(g) Attachment 6 : The variation and deviations from the requirements of the Conditions of Contract, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter alia, the cost of withdrawal of the variations and deviations indicated therein. 27 th
(h) Attachment 7 : The details of Alternative Bids made by us indicating the complete Technical Specifications and the deviation to contractual and commercial conditions. (Not Applicable) 28 th
(i) Attachment 8 : Manufacturer’s Authorisation Forms. 29 th
(j) Attachment 9 : Work Completion Schedule. 30 th
(k) Attachment 10 : Guarantee Declaration. 31 st
(l) Attachment 11 : Information regarding ex-employees of Employer in our firm.
(m) Attachment 12 : Filled up information regarding Price Adjustment Data as per the format enclosed in the bidding documents.
(n) Attachment 13 : Declaration regarding Social Accountability.
(o) Attachment 14 : Integrity Pact, in a separate envelope, duly signed on each page by the person signing the bid.
(p) Attachment 15 : Option for Initial Advance (either Interest Bearing Initial Advance or No Initial Advance) and Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
(q) Attachment 16 : Additional Information.
(r) Attachment 17 : Declaration for tax exemptions, reductions, allowances or benefits
(s) Attachment 18 : Declaration
(t) Attachment 19 : Declaration of Key Managerial Person jointly with Power of Attorney holder
(u) Attachment 20 : Affidavit
(v) Attachment 21: Declaration by the Bidder regarding events encountered pursuant to ITB Clause 2.1
(w) Attachment 22: Certification by the Bidder per DoE Order in line with ITB Clause 2.1
(x) Attachment 23: Affidavit of Self certification regarding Minimum Local Content in line with PPP-MII order and MoP Order, if applicable
(y) Attachment 24: Certificate from statutory auditor or cost auditor of the company (in the case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of Local Content, in line with PPP-MII order and MoP Order, if applicable
3.0 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
4.0 We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST, which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
4.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
5.0 Construction of the Contract
5.1 We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us two separate Contracts viz ‘First Contract’ for ex-works supply of all equipment and materials including mandatory spares and ‘Second Contract’ for providing all the services i.e. inland transportation for delivery at site, In-transit insurance, unloading, handling at site, installation, testing and commissioning including Trial operation in respect of all the equipment supplied under the ‘First Contract’ and other services specified in the Contract Documents. We declare that the award of two contracts, will not, in any way, dilute our responsibility for successful operation of plant/equipment and fulfillment of all obligations as per Bidding Documents and that both the Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the other contract which will confer on you the right to terminate the other contract at our risk and cost.
6.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) GCC 2.14 Governing Law
(b) GCC 5 Contractor’s Responsibilities
(c) GCC 8 Terms of Payment
(d) GCC 9.3 Performance Security
(e) GCC 10 Taxes and Duties
(f) GCC 21.2 Completion Time Guarantee
(g) GCC 22 Defect Liability
(h) GCC 23 Functional Guarantee
(i) GCC 25 Patent Indemnity
(j) GCC 26 Limitation of Liability
(k) GCC 38 Settlement of Disputes
(l) GCC 39 Arbitration
(m) Appendix 2 to Form of Contract Agreement Price Adjustment
Further we understand that deviation taken in any of the above clauses by us may make our bid non-responsive as per provision of bidding documents and be rejected by you.
7.0 We undertake, if our bid is accepted, to commence the work immediately upon your Notification of Award to us, and to achieve the delivery of goods and related services within the time stated in the Bidding Documents.
8.0 If our bid is accepted, we undertake to provide a Performance Security in the form and amounts, and within the times specified in the Bidding Documents.
9.0 We agree to abide by this bid for a period of six (06) months from the date fixed for opening of bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
10.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
11.0 We understand that you are not bound to accept the lowest or any bid you may receive.
12.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions. 2
13.0 We are a Micro and Small Enterprise (MSE) registered with , a designated Authority of GoI under the Public Procurement Policy for MSEs order 2012, Notification dated 01/06/2020 read in conjuction with related notifications issued from time to time for such enterprises. 2
14.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : -- Printed Name :
Place : Designation :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him
#REF! Printed Name :
#REF! Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
Price_schedule.xlsx
xlsx • 1.61 MB
01-Section - I IFB SSTE Vol-I.docx
docx • 0.04 MB
02 Section - II ITB SSTE civil(Feb 2019).docx
docx • 0.09 MB
03-Section - III_BDS.docx
docx • 0.07 MB
04_1-Annexure-A (BDS).docx
docx • 0.03 MB
04_2_Annexure-B(BDS).docx
docx • 0.02 MB
04_3_Annexure-C(BDS).docx
docx • 0.03 MB
05-GCC-civil works(Feb 2019).doc
doc • 0.38 MB
06-Section - V SCC Civil Vol-I_Contact Specific change.docx
docx • 0.05 MB
07-Appendix-I to SCC.doc
doc • 0.24 MB
08-Appendix-II to SCC.docx
docx • 0.04 MB
09-Checklist for submission of tender.docx
docx • 0.02 MB
10-Section - VI Forms and Proceedures Civil.docx
docx • 0.12 MB
LAYOUT.pdf
pdf • 1.84 MB
REFERENCE DRG PEB.pdf
pdf • 0.12 MB
REFERENCE DRG STRUCTURAL.pdf
pdf • 0.18 MB
RFERENCE DRG_compressed.pdf
pdf • 2.12 MB
SFQP REV 7_compressed.pdf
pdf • 4.71 MB
SOW.pdf
pdf • 0.24 MB
TS EOT.pdf
pdf • 0.19 MB
TS PEB_compressed.pdf
pdf • 0.91 MB
01-First Envelope Attachments and Bid Form.xlsx
xlsx • 1.33 MB
02-Attachment-3-Bidder Eligibility.doc
doc • 0.04 MB
03_Attachment-8- Manufacturers Authorization Form.DOC
doc • 0.06 MB
04-Attachment 14-Integrity Pact.doc
doc • 0.07 MB
05-Attachment 18-Safety Pact.docx
docx • 0.05 MB
06_Attachment 19-KMP Declaration.doc
doc • 0.04 MB
07_Attachment 20-Affidavit.docx
docx • 0.02 MB
08_Attachment 21 Declaration regading event encountered.docx
docx • 0.03 MB
09_Attachment 22 Certificate by bidder.docx
docx • 0.02 MB
10_Attachment 23_Affidavit for self-certification_PPP - MII Order.docx
docx • 0.02 MB
11_Attachment 24_Certificate by Auditor_PPP - MII Order.docx
docx • 0.02 MB
12_Attachment 25_Compliance to the process related to the e-RA.docx
docx • 0.02 MB
13_Attachment-26 Bid Securing Declaration.docx
docx • 0.02 MB
14_Legends for Units.pdf
pdf • 0.03 MB
file to be locked.txt
txt
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .