Tender Value
₹30.5 L
EMD Value
₹30,600
Closing Date
3 Jun 2026, 6:00 pmClosed
EXECUTIVE ENGINEER UPSIC KANPUR
EXECUTIVE ENGINEER UPSIC KANPUR
CONSTRUCTION OF BOUNDARY WALL OF INDUSTRIAL ESTATE KAS GANJ.
2026_MSME_1153618_1
64/EE3/UPSIC/2026-27
Open Tender
Civil Works
Percentage
180 days
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
EXECUTIVE ENGINEER UPSIC KANPUR
₹30,600
25 May 2026
25 May 2026
4 Jun 2026
25 May 2026
3 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of site | 1 | JOB | 9,500 | ₹9,500 |
| 2 | Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 mt. And lead upto 30 mt. And including filling watering and ramming of excavated earth into the trenches or into the space between the byilding and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer Incharge upto a distance of 30 m from the foundation trenches.4.1.1 | 230.43 | cum | 142.5 | ₹32,836.28 |
| 3 | Concrete with 4 cms guage stone ballast, coarse sand and cement in proportion of 8:4:1 in foundation and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of work.SCH 275 A | 40.97 | cum | 5,605 | ₹2,29,636.85 |
| 4 | R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 :3 in foundation excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completed of the work. The rate excludes making of drip course which shall be paid extra.SCH 4.1.2 (a) | 46.19 | cum | 7,030 | ₹3,24,715.7 |
| 5 | R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 :3 in coloumn excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completed of the work. The rate excludes making of drip course which shall be paid extra.5.2.2 | 11.72 | cum | 8,740 | ₹1,02,432.8 |
| 6 | R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 : 3 in lighter beam excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completion of the work. The rate excludes making of drip course which shall be paid extra.5.1.2 | 18.78 | cum | 8,740 | ₹1,64,137.2 |
| 7 | R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 : 3 in lighter beam excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completion of the work. The rate excludes making of drip course which shall be paid extra.5.3 | 18.39 | cum | 8,740 | ₹1,60,728.6 |
| 8 | Mild steel or iron in plain work such as reinforced cement concrete work wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping and hooks.( Analysis ) | 7,942.57 | kg | 82.65 | ₹6,56,453.41 |
| 9 | M-150 brick work in 1:4 one cement and fout coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work.6.1.1 | 49.72 | cum | 5,415 | ₹2,69,233.8 |
| 10 | M-150 brick work in 1:4 one cement and four coarse sand in superstructure including necessary cutting and moulding of brick for walls of one brick thick including supply of all material, labour and Tools & Plants etc. required for proper completion of work.6.4.1 | 132.6 | cum | 5,795 | ₹7,68,417 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_2161077.xls
BOQ • 0.26 MB
TermsandConditionTenderCivilWorks.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .