Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
15 Jul 2026, 6:00 pm7d left
EXEN REW SRINAGAR
OFFICE OF THE EXECUTIVE ENGINEER REW SRG
Construction of Road with Retaining Wall Drain from House of Abdul Gaffar Bhat to PMGSY Road Syedpora
2026_RDPR_314714_1
ENIT08/REW SGR 2025-26
Open Tender
Civil Works
SRINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹700
Rural Development and Panchayati Raj
₹20,000
7 Jul 2026
7 Jul 2026
16 Jul 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Demolishing cement concrete manually/by mechanical means including disposal of material | 5.6 | Cum | 1,064.55 | ₹5,961.48 |
| 0_) | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 1,026.95 | 100/ Sqm | 24.12 | ₹24,770.03 |
| 0_) | Earth work in excavation by mech means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 56.71 | Cum | 256.85 | ₹14,565.96 |
| 0_) | Providing and Laying of Stone Solling duly Hand packed in Trenches incl. compaction with hand rammer carriage upto 15 kms. | 30.39 | Cum | 1,000 | ₹30,390 |
| 0_) | Labour charges for Laying of Stone Solling duly Hand packed in Trenches incl. compaction with hand rammer stones available at site | 5.6 | Cum | 300 | ₹1,680 |
| 0_) | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering (Using Concrete Vibrator for Compaction of Concrete). All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) i/c Plum 20% | 75.04 | Cum | 5,733.6 | ₹4,30,249.34 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 108.42 | Sqm | 286.35 | ₹31,046.07 |
| 0_) | Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 78.42 | Sqm | 628.95 | ₹49,322.26 |
| 0_) | P/ Applying 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand ) | 198.07 | Sqm | 283.8 | ₹56,212.27 |
| 0_) | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. MS pipe 150mm dia 4.8 thk | 233.87 | Kg | 120.8 | ₹28,251.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_1019301.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid