Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC ST NO 1 AZIMGARH ABOHAR DISTT FAZILKA PUNJAB 152116 | ABOHAR | FAZILKA | PUNJAB | 152116 | ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 Cr+₹18.1 L (11.7%)Rejected-AOC | ₹1.7 Cr+₹18.1 L (11.7%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.8 Cr+₹26.7 L (17.3%)Rejected-AOC ABOHAR | ₹1.8 Cr+₹26.7 L (17.3%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Rajesh Kumar Middha Govt. Contractor L2 | VARSHA CONSTRUCTION CO L3 | SHIVA CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Chapter 6.2 Earthwork Undressed (a) involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods | 1 | cum | 71,682.57 ₹71,682.57 | 71,682.57 ₹71,682.57 | 44,248.5 ₹44,248.5 Lowest |
| 2.00 | Chapter 6.2 Earthwork Undressed with (b) combined Lead upto 15 mtr. including Breaking of clods. | 1 | cum | 1,58,281.02 ₹1,58,281.02 | 1,58,281.02 ₹1,58,281.02 | 13,884.3 ₹13,884.3 Lowest |
| 3.00 | Chapter 6.3 Dressing of New Earthwork (i) | 1 | sqm | 1,043.77 ₹1,043.77 Lowest | 10,437.65 ₹10,437.65 | 1,043.77 ₹1,043.77 Lowest |
| 4.00 | Chapter 6.8 Earthwork Filling in 0.152 mtr. (b) (i) layers in foundation, including ramming, watering and consolidation under bed | 1 | cum | 10 ₹10 | 147 ₹147 | 1 ₹1 Lowest |
| 5.00 | Chapter 6 Re-handling of earthwork recently executed | 1 | cum | 56,638.08 ₹56,638.08 | 56,638.08 ₹56,638.08 | 4,424.85 ₹4,424.85 Lowest |
| 6.00 | Chapter 6.18 Dag belling single kassi stroke minimum 7.5 cm depth | 1 | km | 15,056 ₹15,056 | 15,959.36 ₹15,959.36 | 658.7 ₹658.7 Lowest |
| 7.00 | Chapter 8.5 Dismantling Brick Work in (b) Cement | 1 | cum | 2,43,667.66 ₹2,43,667.66 Lowest | 2,43,667.66 ₹2,43,667.66 Lowest | 2,43,667.66 ₹2,43,667.66 Lowest |
| 8.00 | Chapter 19.1 Dressing of Bed and Preparation of Sub-grade for Lining | 1 | sqm | 96,188.41 ₹96,188.41 | 93,222.25 ₹93,222.25 | 8,474.75 ₹8,474.75 Lowest |
| 9.00 | Chapter 11.3 First Class Burnt Brick laid in (i) 1:6 Cement Sand Mortar for Bed & Side walls | 1 | cum | 1,43,36,127.96 ₹1,43,36,127.96 | 1,50,59,461.48 ₹1,50,59,461.48 | 1,30,56,384.04 ₹1,30,56,384.04 Lowest |
| 10.00 | Chapter 15.6 10 mm thick Cement Plaster 1:4 on Side Walls | 1 | sqm | 11,39,076.12 ₹11,39,076.12 | 11,89,145.4 ₹11,89,145.4 | 9,70,092.3 ₹9,70,092.3 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
5 Mar 2026, 10:00 amClosed
Executive Engineer, Abohar Canal Ground Water Divi
Executive Engineer, Abohar Canal Ground Water Divi
Reconstruction/Remodeling of Watercourse outlet RD 591100/L of Abohar Branch BALLUANA Distt Fazilka
2026_WR_159917_16
E-Tendering Notice No.25/Abohar Canal Ground Water Division /2025-26 Dated 11/02/2026
Open Tender
Civil Works - Canal
Item Rate
FAZILKA
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
Yes
₹2.2 L
Yes
22 Apr 2026
11 Feb 2026
5 Mar 2026
12 Feb 2026
5 Mar 2026
12 Feb 2026
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Tendernotice_2.pdf
PDF • 1.05 MB
Tendernotice_3.pdf
PDF • 0.12 MB
TB16.xls
Tender Documents • 0.05 MB
BOQ_324572.xls
BOQ • 0.24 MB
SBDall.pdf
Additional Documents • 0.28 MB
Corrigendum04WC.pdf
PDF • 0.09 MB
Corrigendum03.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .