Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.2 LAdmitted-Finance S O MAKHAN SINGH | ₹33.2 L | L1 | Admitted-Finance |
| 2 | L2₹33.4 LAdmitted-Finance | ₹33.4 L | L2 | Admitted-Finance |
| 3 | L3₹35.3 LAdmitted-Finance | ₹35.3 L | L3 | Admitted-Finance |
| 4 | L4₹37.5 LAdmitted-Finance ROPAR CANALS AND GROUND WATER MODEL JAL SAROT VIBHAG PUNJAB ROPAR | ₹37.5 L | L4 | Admitted-Finance |
| 5 | L5₹39.1 LAdmitted-Finance NOT SPECIFIED | ₹39.1 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VIRASAT GROUP L3 | SOKHAL CONTRACTOR L5 | Deep Enterprises L4 | GURPREET SINGH CONTRACTOR L1 | Singla Contractors L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods | 1 | Cum | 83.1 ₹21,042.58 | 90 ₹22,789.80 | 85 ₹21,523.70 | 81.1 ₹20,536.14 | 80 ₹20,257.60 |
| 2.00 | Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. | 1 | Cum | 115.25 ₹80,938.92 | 130 ₹91,297.70 | 120 ₹84,274.80 | 83.5 ₹58,641.22 | 110 ₹77,251.90 |
| 3.00 | Dressing of New Earthwork | 1 | Sq.Mtr | 1.5 ₹5,448.41 | 2.5 ₹9,080.68 | 2 ₹7,264.54 | 1.3 ₹4,721.95 | 1 ₹3,632.27 |
| 4.00 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. | 1 | Cum | - | - | - | - | - |
| 5.00 | Re-handling of earthwork recently executed | 1 | Cum | 65.2 ₹16,509.94 | 70 ₹17,725.40 | 65 ₹16,459.30 | 64 ₹16,206.08 | 65 ₹16,459.30 |
| 6.00 | Dag belling single kassi stroke minimum 7.5 cm depth. | 1 | km | - | - | - | - | - |
| 7.00 | Dismantling Brick Work in Cement | 1 | Cum | 720.1 ₹85,555.08 | 750 ₹89,107.50 | 720 ₹85,543.20 | 718.1 ₹85,317.46 | 718 ₹85,305.58 |
| 8.00 | Dressing of Bed and Preparation of Sub-grade for Lining | 1 | Sq.Mtr | 12.2 ₹21,547.88 | 15 ₹26,493.30 | 11 ₹19,428.42 | 11.1 ₹19,605.04 | 11 ₹19,428.42 |
| 9.00 | First Class Burnt Brick laid in 1:6 Cement Sand Mortar for foundation and plinth. | 1 | Cum | 6,660 ₹29.1 L | 7,250 ₹31.6 L | 7,050 ₹30.8 L | 6,450 ₹28.1 L | 6,200 ₹27.1 L |
| 10.00 | 10 mm thick Cement Plaster 1:4 on Side Walls | 1 | Sq.Mtr | 173.4 ₹2.3 L | 200 ₹2.6 L | 185 ₹2.4 L | 122.3 ₹1.6 L | 180 ₹2.4 L |
Updated dates
Tender Value
₹21 L
EMD Value
₹42,000
Closing Date
19 Mar 2026, 10:00 amClosed
Xen Fazilka Canal And Ground Water Division CC FZR
Xen Fazilka Canal And Ground Water Division CC FZR
Estimate for Lining of Watercourse of Outlet RD 10000/R of Jandwala Link Ch by Brick Masonry of Village Chaurian Wali Distt Fazilka
2026_WR_161504_3
028/FazilkaCanal/2025-26 dated 20/02/2026
Open Tender
Civil Works - Canal
45 days
Xen Fazilka Canal And Ground Water Division CC FZR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹42,000
20 Apr 2026
21 Feb 2026
19 Mar 2026
21 Feb 2026
19 Mar 2026
21 Feb 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Executive Engineer, Fazilka Canal & ground water Division, WRD Punjab, Ferozepur.
Name of Work:Estimate for Lining of Watercourse of Outlet RD 10000/R of Jandwala Link Ch by Brick Masonry of Village Chaurian Wali Distt Fazilka
Contract No: 01632 292604
Name of the Bidder/ Bidding Firm / Company :
SR No. Item Description Item Code / Make Aprox. Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods t1 Cum Excess(+) Full Conversion INR
Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. t2 Cum Excess(+) Full Conversion INR
Dressing of New Earthwork t3 Sq.Mtr Excess(+) Full Conversion INR
Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. t4 Cum Excess(+) Full Conversion INR
Re-handling of earthwork recently executed t5 Cum Excess(+) Full Conversion INR
Dag belling single kassi stroke minimum 7.5 cm depth. t6 km Excess(+) Full Conversion INR
Dismantling Brick Work in Cement t7 Cum Excess(+) Full Conversion INR
Dressing of Bed and Preparation of Sub-grade for Lining t8 Sq.Mtr Excess(+) Full Conversion INR
First Class Burnt Brick laid in 1:6 Cement Sand Mortar for foundation and plinth. t9 Cum Excess(+) Full Conversion INR
10 mm thick Cement Plaster 1:4 on Side Walls t10 Sq.Mtr Excess(+) Full Conversion INR
10 mm thick Cement Plaster 1:4 on Floors t11 Sq.Mtr Excess(+) Full Conversion INR
Providing & Laying Dry Brick Bats t12 Cum Excess(+) Full Conversion INR
Providing & Laying Brick Ballast t13 Cum Excess(+) Full Conversion INR
Supplying of RCC Shutter with One Extra Frame for Nakka and Branch Offtakes t14 Each Excess(+) Full Conversion INR
Fixing of Shutter and Frames for Nakka and Branch Offtakes t15 Each Excess(+) Full Conversion INR
Providing & laying Cement Concrete 1:6:12 t16 Cum Excess(+) Full Conversion INR
Providing,lowering,jointing & cutting of RCC pipes np2 400mm dia into trenches & laying same to correct alignment t17 Mtr Excess(+) Full Conversion INR
Any Other Item t18 No. Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_327395.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
sbd_water_courses.pdf
Tender Documents • 19.06 MB
BOQ_327395.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid