| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.9 LAccepted-AOC | ₹7.9 L | 1 | Accepted-AOC L1 |
| 2 | 2₹7.9 LRejected-AOC | ₹7.9 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | LK Constructions L2 | R. Marimuthu L1 |
|---|---|---|---|---|---|
| 1.00 | Manhole Raising inner Dia 0.60 and Wall thickness 0.30m and Height average 0.45 raising the existing manhole of 0.20m using centering and Plain cement concrete 1:1.5:3 using 20mm Metal using old frame and covers the rate including cost and dismantling , centering , concrete and curing charges . The outer Barricading / Safety arrangements will be made as per safety purpose , etc., complete as per standard specification.(With Replacement of Frame) | 10 | Each | 6,309.41 ₹63,094.10 | 6,306.51 ₹63,065.10 |
| 2.00 | Manhole Raising inner Dia 0.60 and Wall thickness 0.30m and Height average 0.45 raising the existing manhole of 0.20m using centering and Plain cement concrete 1:1.5:3 using 20mm Metal using old frame and covers the rate including cost and dismantling , centering , concrete and curing charges . The outer Barricading / Safety arrangements will be made as per safety purpose , etc., complete as per standard specification.(Without Replacement of Frame) | 10 | Each | 5,485.3 ₹54,853 | 5,482.4 ₹54,824 |
| 3.00 | Manhole Raising inner Dia 0.60 and Wall thickness 0.30m and Height average 0.30 raising the existing manhole of 0.20m using centering and Plain cement concrete 1:1.5:3 using 20mm Metal using old frame and covers the rate including cost and dismantling , centering , concrete and curing charges . The outer Barricading / Safety arrangements will be made as per safety purpose , etc., complete as per standard specification.(With Replacement of Frame) | 22 | Each | 4,479.41 ₹98,547.02 | 4,476.51 ₹98,483.22 |
| 4.00 | Manhole Raising inner Dia 0.60 and Wall thickness 0.30m and Height average 0.30 raising the existing manhole of 0.20m using centering and Plain cement concrete 1:1.5:3 using 20mm Metal using old frame and covers the rate including cost and dismantling , centering , concrete and curing charges . The outer Barricading / Safety arrangements will be made as per safety purpose , etc., complete as per standard specification.(Without Replacement of Frame) | 75 | Each | 3,655.3 ₹2.7 L | 3,652.4 ₹2.7 L |
| 5.00 | Replacement of Underground Utilities (PVC Pipe) damaged during earthwork excavation for pipe laying works including cost of additional arthwork excavation in all soil strata, including BT/CC road cutting,removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of PVC pipes, couplers, jointing materials and required specials, cutting, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete and as directed by the
TWAD board officers. 200mm Dia PVC Pipe (6KSC) | 85 | Mtrs | 1,640.64 ₹1.4 L | 1,637.74 ₹1.4 L |
| 5.01 | 110mm Dia PVC Pipe (6KSC) | 40 | Mtrs | 661.58 ₹26,463.20 | 658.68 ₹26,347.20 |
| 5.02 | 160mm Dia PVC Pipe (6KSC) | 15 | Mtrs | 1,020.54 ₹15,308.10 | 1,017.64 ₹15,264.60 |
| 6.00 | ADD GST 18% | 1 | Nos | 1,20,936.11 ₹1.2 L | 1,20,801.96 ₹1.2 L |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
23 Apr 2025, 3:00 pmClosed
Commissioner
Tiruvannamalai City Municipal Corporation
Reconstruct of Manhole Raising at Ward No 1 to 39 in Thiruvannamalai City Municipal Corporation.
2025_MAWS_549426_1
2171/2025/E2
Open Tender
Civil Works
30 days
Tiruvannamalai City Municipal Corporation
Places Refer Tender Notices
2 documents required · 2 mandatory
₹0
₹8,000
8 Mar 2026
22 Apr 2025
23 Apr 2025
22 Apr 2025
23 Apr 2025
22 Apr 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid