| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.3 LAccepted-AOC | ₹25.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹25.7 L+₹38,188 (1.51%)Rejected-Finance | ₹25.7 L+₹38,188 (1.51%) | L2 | Rejected-Finance Highest rate |
| Sl No | Description | Qty | Unit | THIRUVENGADAM CONSTRUCTIONS AND MATERIAL SHIVA CONTRACTOR L2 | kalimuthu L1 |
|---|---|---|---|---|---|
| 1.00 | Labour for cutting open road for laying water mains or sewer including labour charges cost and conveyance charges etc cmpleted (B.T Road) | 173 | m3 | 955 ₹1,65,215 | 929 ₹1,60,717 Lowest |
| 2.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 686 | m3 | 225 ₹1,54,350 | 220 ₹1,50,920 Lowest |
| 3.00 | Supply and fixing of HDPE PIPES - PE 100 AS PER IS 4984/2016 PN10(110mm dia) | 1,160 | m | 565 ₹6,55,400 | 556 ₹6,44,960 Lowest |
| 4.00 | Supply and fixing of SPECIALS FOR HDPE PIPES AS PER IS 8360/1977/Part I(Reaffirmed 1992) Part II and III (Reaffirmed 2002) 110mm HDPE Equal tee | 85 | each | 820 ₹69,700 | 816 ₹69,360 Lowest |
| 5.00 | 111mm HDPE 90 bend | 85 | each | 610 ₹51,850 | 606 ₹51,510 Lowest |
| 6.00 | Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board
Officers. | 200 | no | 225 ₹45,000 | 219 ₹43,800 Lowest |
| 7.00 | Conveyance of HDPE. Pipes and Specials including labour charges complete etc.,, | 23 | Tonne | 999 ₹22,977 | 983 ₹22,609 Lowest |
| 8.00 | Lowering HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the TWAD Officers | 1,150 | m | 25 ₹28,750 | 18 ₹20,700 Lowest |
| 9.00 | Refilling with excavted earth for pipe laying workincluding labour charges complete etc.,, | 866 | m3 | 45 ₹38,970 | 40 ₹34,640 Lowest |
| 10.00 | Testing of pipes for water supply with hydraulic testing equipment by filling with water (including cost of water) and testing to recommended pressure in convenient stretches and attending the bursts if any occured during the test, excluding the cost of pipes but including other incidential and operational charges etc., complete for the following diametres of pipes. | 1,150 | m | 75 ₹86,250 Lowest | 75 ₹86,250 Lowest |
Tender Value
₹31.5 L
EMD Value
₹31,500
Closing Date
12 Mar 2026, 3:00 pmClosed
Commissioner,Palani Municipality
Red Cross Road,palani municipality
9 Providing of 110mm DHPE Pipe in Various place for Omitted Portion at Itteri road LLND cross street NS, Itteri road 1st cross street N S, IItteri road cross stree E W,Itteri road 2nd cross street,Thakkali market OHT to Gounder itteri road junction
2026_MAWS_665504_3
3278/2025/E1
Open Tender
Civil Works - Water Works
Supply
180 days
Red Cross Road, palani municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹31,500
Red Cross Road,palani municipality
21 Jul 2026
9 Mar 2026
12 Mar 2026
9 Mar 2026
12 Mar 2026
9 Mar 2026
10 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour for cutting open road for laying water mains or sewer including labour charges cost and conveyance charges etc cmpleted (B.T Road) | 173 | m3 | 100 | ₹17,300 |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 686 | m3 | 100 | ₹68,600 |
| 3 | Supply and fixing of HDPE PIPES - PE 100 AS PER IS 4984/2016 PN10(110mm dia) | 1,160 | m | 100 | ₹1,16,000 |
| 4 | Supply and fixing of SPECIALS FOR HDPE PIPES AS PER IS 8360/1977/Part I(Reaffirmed 1992) Part II and III (Reaffirmed 2002) 110mm HDPE Equal tee | 85 | each | 100 | ₹8,500 |
| 5 | 111mm HDPE 90 bend | 85 | each | - | - |
| 6 | Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board
Officers. | 200 | no | - | - |
| 7 | Conveyance of HDPE. Pipes and Specials including labour charges complete etc.,, | 23 | Tonne | - | - |
| 8 | Lowering HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the TWAD Officers | 1,150 | m | - | - |
| 9 | Refilling with excavted earth for pipe laying workincluding labour charges complete etc.,, | 866 | m3 | - | - |
| 10 | Testing of pipes for water supply with hydraulic testing equipment by filling with water (including cost of water) and testing to recommended pressure in convenient stretches and attending the bursts if any occured during the test, excluding the cost of pipes but including other incidential and operational charges etc., complete for the following diametres of pipes. | 1,150 | m | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_808229.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .