Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹27.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹28.5 L+₹84,734.03 (3.06%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹30.0 L+₹2.3 L (8.32%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹30.8 L+₹3.1 L (11.3%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹41.1 L
EMD Value
₹82,260
Closing Date
24 Jun 2026, 4:00 pmClosed
Executive Engineer RnB Division
SUMBAL SONAWARI
Middle School Bunpora Naidkhai (Construction of ACR (04 No) at Middle School Bunpora Naidkhai
2026_PWDJK_312611_2
NIT NO 18 OF 2026-27 SUMBAL DIVISION
Open Tender
Civil Works
Percentage
90 days
SUMBAL SONAWARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Executive Engineer RnB Division
₹82,260
30 Jun 2026
16 Jun 2026
25 Jun 2026
16 Jun 2026
24 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, in all kinds of soil | 85.47 | cum | 187.3 | ₹16,008.53 |
| 2 | Providing and laying of stone soiling duly hand packed including all carriages loading unloading complete job before laying of mud mate in trenches.incl. all carriag and head load. | 32.6 | cum | 1,000 | ₹32,600 |
| 3 | Filling available excavated earth in trunchs , plinth sides of foundation in layers not exceding 20cm in depth consolidating each layer by ramming and watering etc complete | 50.16 | cum | 218.4 | ₹10,954.94 |
| 4 | Filling inside rooms by 2nd class sand / stone dust etcin layers incl. ramming and watering etc complete job | 27.14 | cum | 1,000 | ₹27,140 |
| 5 | P/L in position Cement Concrete of specified grade 1:4:8 incl. Curing complete excluding centering and shuttering | 11.25 | cum | 5,202.9 | ₹58,532.62 |
| 6 | Providing/laying in position specified grade of Reinforced cement concrete work in plinth, columns, pillars, posts etc upto floor five level excluding cost of centering, shuttering, finishing and reinforcement in (1:1.5:3) 1 cement: 1.5 : coarse sand 3: graded stone aggregate 20mm nominal size) | 18.96 | cum | 7,275.25 | ₹1,37,938.74 |
| 7 | P/L in position cement concrete of specified grade 1:2:4 ( 1 cement:2 coarse sand:4 graded stone aggregate 20mm nominal size crushed).excluding the cost of centring and shuttering all work up to plinth level | 38.4 | cum | 6,540.45 | ₹2,51,153.28 |
| 8 | Centering and Shuttering, including strutting, propping and removal of form work kitply. In Foundation upto plinth level | 188.29 | sqm | 286.35 | ₹53,916.84 |
| 9 | Centering and Shuttering, including strutting, propping and removal of form work kitply including head load & carriage and suspended floors | 165.24 | sqm | 577.55 | ₹95,434.36 |
| 10 | Brick work with F.P.S bricks of class designation 75(A) in super structure in 1:6 mix etc complete job | 49.3 | cum | 9,082.46 | ₹4,47,765.28 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1011875.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .