Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-Finance | L1 | Accepted-Finance Agreement With L1 | |
| 2 | L2₹10.5 L+₹29,754.85 (2.92%)Rejected-Finance | L2 | Rejected-Finance Agreement With L1 | |
| 3 | L3₹10.7 L+₹46,053.40 (4.52%)Rejected-Finance 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | L3 | Rejected-Finance Agreement With L1 | |
| 4 | L4₹10.9 L+₹74,606.60 (7.32%)Rejected-Finance | L4 | Rejected-Finance Agreement With L1 | |
| 5 | L5₹11.2 L+₹1.0 L (9.95%)Rejected-Finance | L5 | Rejected-Finance Agreement With L1 |
| Sl No | Description | Qty | Unit | m/s. devendra kumar L5 | M/S MUNIS RAZA CONSTRUCTION L7 | MITTAL BROTHERS L1 | M/s Ajay Kumar Contractor L3 | aventerprises L9 | M/S SHREE JEE CONSTRUCTIONS L4 | PREMPAL SINGH CONTRACTOR L10 | M/S SHREE JI CONTRACTOR L6 | M/S YOGESH ENTERPRISES L8 | Akash Contractor L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling reinforced cement concrete including stacking of material, labour, T&P etc. complete. | 2.25 | CuM. | 414 ₹931.5 | 512 ₹1,152 | 600 ₹1,350 | 500 ₹1,125 | 600 ₹1,350 | 50 ₹112.5 Lowest | 633 ₹1,424.25 | 507 ₹1,140.75 | 620 ₹1,395 | 320 ₹720 |
| 2.00 | Dismantling brick work or stone work and cement concrete incement mortar & including stacking of materialas material, labour, T&P etc. complete. | 5.57 | CUM. | 414 ₹2,305.98 | 419 ₹2,333.83 | 500 ₹2,785 | 500 ₹2,785 | 500 ₹2,785 | 50 ₹278.5 Lowest | 518 ₹2,885.26 | 415 ₹2,311.55 | 507.64 ₹2,827.55 | 200 ₹1,114 |
| 3.00 | Earth work in foundation in all types of soil including all lift and all lead and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge. | 46.54 | CuM. | 53.6 ₹2,494.54 | 54 ₹2,513.16 | 70 ₹3,257.8 | 100 ₹4,654 | 55 ₹2,559.7 | 50 ₹2,327 Lowest | 67 ₹3,118.18 | 54 ₹2,513.16 | 65.66 ₹3,055.82 | 60 ₹2,792.4 |
| 4.00 | Providing and laying C.C. (A20 M15) (1:2:4) including all cost of materials, labour & T&P etc.complete. | 18.94 | CuM. | 4,572 ₹86,593.68 | 4,637 ₹87,824.78 | 5,100 ₹96,594 | 5,000 ₹94,700 | 4,900 ₹92,806 | 5,000 ₹94,700 | 5,724 ₹1,08,412.56 | 45.79 ₹867.26 Lowest | 5,610.1 ₹1,06,255.29 | 5,400 ₹1,02,276 |
| 5.00 | Providing and laying R.C.C. (A-20 M25) (1:1:2) including all cost of materials, T&P and labour etc.complete. | 57.09 | CuM. | 6,396 ₹3,65,147.64 | 6,000 ₹3,42,540 Lowest | 6,100 ₹3,48,249 | 7,000 ₹3,99,630 | 7,000 ₹3,99,630 | 7,000 ₹3,99,630 | 8,004 ₹4,56,948.36 | 7,000 ₹3,99,630 | 7,844.41 ₹4,47,837.37 | 6,400 ₹3,65,376 |
| 6.00 | Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours complete. | 33 | CuM. | 4,420 ₹1,45,860 | 4,300 ₹1,41,900 | 5,100 ₹1,68,300 | 540 ₹17,820 Lowest | 4,800 ₹1,58,400 | 5,500 ₹1,81,500 | 5,526 ₹1,82,358 | 5,200 ₹1,71,600 | 5,415.53 ₹1,78,712.49 | 5,000 ₹1,65,000 |
| 7.00 | Providing Cement pointing (Struck Deep) on brick masonary in 1:2 Cement Mortar including cost of all material, T&P & labours complete. | 47.62 | SqM. | 108 ₹5,142.96 | 109.5 ₹5,214.39 | 140 ₹6,666.8 | 200 ₹9,524 | 130 ₹6,190.6 | 100 ₹4,762 | 135 ₹6,428.7 | 108 ₹5,142.96 | 132.5 ₹6,309.65 | 80 ₹3,809.6 Lowest |
| 8.00 | Centering and shuttering for RCC/RB work including cost of centering & shuttering up to 3.0m height. including cost of all material, T&P & labours complete. | 120.95 | SqM. | 650 ₹78,617.5 | 652 ₹78,859.4 | 400 ₹48,380 | 300 ₹36,285 | 750 ₹90,712.5 | 700 ₹84,665 | 805 ₹97,364.75 | 645 ₹78,012.75 | 740 ₹89,503 | 200 ₹24,190 Lowest |
| 9.00 | Supplying & Laying TMT Steel bar (Of SAIL/TATA TISCON MAKE.) Reinforcement (Fe 550D) including removing of rust, cutting, binding with 24BWG wire, bending, placing with proper overlapping providing chair i/c all cost of material, labour, T&P etc. complete as per direction of Engineer-in-charge | 3.83 | M.T. | 57,430 ₹2,19,956.9 Lowest | 70,000 ₹2,68,100 | 70,000 ₹2,68,100 | 80,000 ₹3,06,400 | 68,000 ₹2,60,440 | 75,000 ₹2,87,250 | 71,791 ₹2,74,959.53 | 60,000 ₹2,29,800 | 70,356 ₹2,69,463.48 | 70,000 ₹2,68,100 |
| 10.00 | Providing and fixing P.V.C. pipe 100mm dia & 6Kg./cm Sq. I.S.I. Mark i/c all cost of material, labour, T&P etc. complete | 1.8 | R.M. | 224 ₹403.2 | 227 ₹408.6 | 100 ₹180 Lowest | 700 ₹1,260 | 250 ₹450 | 200 ₹360 | 280 ₹504 | 224 ₹403.2 | 274.4 ₹493.92 | 175 ₹315 |
Tender Value
₹14 L
EMD Value
₹28,000
Closing Date
1 Oct 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER ANOOPSHAHAR BRANCH DIVISION GANGA CANAL MEERUT
TN-04/EE/2026-27 Reconstruction work (box culvert) of damaged bridge located at Km 27.893 of Rajwaha Right Akbarpur. Lot No-04
2026_UPIDC_1176734_11
TN-04/EE/2026-27
Open Tender
Civil Works
Piece-work
90 days
As Per NIT
As per NIT and TD
3 documents required · 3 mandatory
₹944
₹28,000
14 Oct 2026
24 Sept 2026
1 Oct 2026
24 Sept 2026
1 Oct 2026
24 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling reinforced cement concrete including stacking of material, labour, T&P etc. complete. | 2.25 | CuM. | - | - |
| 2 | Dismantling brick work or stone work and cement concrete incement mortar & including stacking of materialas material, labour, T&P etc. complete. | 5.57 | CUM. | - | - |
| 3 | Earth work in foundation in all types of soil including all lift and all lead and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge. | 46.54 | CuM. | - | - |
| 4 | Providing and laying C.C. (A20 M15) (1:2:4) including all cost of materials, labour & T&P etc.complete. | 18.94 | CuM. | - | - |
| 5 | Providing and laying R.C.C. (A-20 M25) (1:1:2) including all cost of materials, T&P and labour etc.complete. | 57.09 | CuM. | - | - |
| 6 | Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours complete. | 33 | CuM. | - | - |
| 7 | Providing Cement pointing (Struck Deep) on brick masonary in 1:2 Cement Mortar including cost of all material, T&P & labours complete. | 47.62 | SqM. | - | - |
| 8 | Centering and shuttering for RCC/RB work including cost of centering & shuttering up to 3.0m height. including cost of all material, T&P & labours complete. | 120.95 | SqM. | - | - |
| 9 | Supplying & Laying TMT Steel bar (Of SAIL/TATA TISCON MAKE.) Reinforcement (Fe 550D) including removing of rust, cutting, binding with 24BWG wire, bending, placing with proper overlapping providing chair i/c all cost of material, labour, T&P etc. complete as per direction of Engineer-in-charge | 3.83 | M.T. | - | - |
| 10 | Providing and fixing P.V.C. pipe 100mm dia & 6Kg./cm Sq. I.S.I. Mark i/c all cost of material, labour, T&P etc. complete | 1.8 | R.M. | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.28 MB
Tendernotice_2.pdf
PDF • 1.99 MB
BOQ_2240864.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .