Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC KUMARDIHI PANDEESHWAR BARDDHAMAN BARDDHAMAN 713363 WEST BENGAL INDIA | BARDDHAMAN | BARDDHAMAN | WEST BENGAL | 713363 | L1 | Accepted-AOC tcr | |
| 2 | Rejected-Technical VILL ETHORA P O ETHORA DIST PASCHIM BARDHAMAN PIN 713359 | PASCHIM BARDHAMAN | WEST BENGAL | 713359 | - | Rejected-Technical TC recommendation |
| Sl No | Description | Qty | Unit | GOUTAM MUKHERJEE L1 |
|---|---|---|---|---|
| 1.00Job 1 -A/Y make TSU transporting from old place to new place in RVIIB seam | ||||
| 2.00 | Transportation of TSU from 2WL/10R to 1WL/10R without track line and then transportation via track upto 8WL and then again without track approx 200 meter. | 1 | LS | 1,62,891.24 ₹1,62,891.24 Lowest |
| 3.00 | Transportation of 50 mm² armoured power cable of length 400 meter and layout along the gallery from old place of TSU to new substation place and then 550 V cable of length 500 meter from TSU to different GEB's | 1 | LS | 1,35,742.7 ₹1,35,742.7 Lowest |
| 4.00 | Transportation of 1 no of 3.3 kV VCB and 6 nos of ACB, 550V from old place to new place. | 1 | LS | 65,156.5 ₹65,156.5 Lowest |
| 5.00 | Cleaning of the stones and falling coal in the substation place and transport roadway making transporting arrangement | 1 | LS | 54,297.08 ₹54,297.08 Lowest |
| 6.00JOB 2: Mineline make TSU transporting from surface store to RVII8 section by dismantling breakers and then lowering in shaft and transporting to substation site. | ||||
| 7.00 | Dismantling of TSU (Primary and Secondary Breaker) and loading them in trolley. Transporting all materials in pit top and making arrangements for lowering. Dismantling of cage from Sackle pins and removing the cage, and then lowering through shaft by adding counter weight in other cage. After lowering refitting of cage and removing the counter weight. | 1 | LS | 1,62,891.24 ₹1,62,891.24 Lowest |
| 8.00 | Transporting of all materials such as TSU, Both Breakers from pit bottom to new substation place through two nos. of drift 3 and 5, then transportation via without track line 200 meter | 1 | LS | 1,62,891.24 ₹1,62,891.24 Lowest |
| 9.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 1,33,896.6 ₹1,33,896.6 Lowest |
Tender Value
₹8.8 L
EMD Value
₹11,000
Closing Date
1 Aug 2025, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation of 02 nos of sub station including transportation of all equipment cables and laying of cable along required route near to section at RVIIB Seam at Kumardihi-A Colliery.
2025_ECL_339766_1
ECL/GM/BA/E TENDER/25-26/ENM/35 Dt 17.07.2025
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Kumardihi A Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,000
10 Oct 2025
17 Jul 2025
2 Aug 2025
17 Jul 2025
1 Aug 2025
17 Jul 2025
17 Jul 2025 - 21 Jul 2025
Amount
Job 1 -A/Y make TSU transporting from old place to new place in RVIIB seam
Transportation of TSU from 2WL/10R to 1WL/10R without track line and then transportation via track upto 8WL and then again without track approx 200 meter.
Transportation of 50 mm² armoured power cable of length 400 meter and layout along the gallery from old place of TSU to new substation place and then 550 V cable of length 500 meter from TSU to different GEB's
Transportation of 1 no of 3.3 kV VCB and 6 nos of ACB, 550V from old place to new place.
Cleaning of the stones and falling coal in the substation place and transport roadway making transporting arrangement
JOB 2: Mineline make TSU transporting from surface store to RVII8 section by dismantling breakers and then lowering in shaft and transporting to substation site.
Dismantling of TSU (Primary and Secondary Breaker) and loading them in trolley. Transporting all materials in pit top and making arrangements for lowering. Dismantling of cage from Sackle pins and removing the cage, and then lowering through shaft by adding counter weight in other cage. After lowering refitting of cage and removing the counter weight.
Transporting of all materials such as TSU, Both Breakers from pit bottom to new substation place through two nos. of drift 3 and 5, then transportation via without track line 200 meter
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .