Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC | ₹14.2 L | L1 | Accepted-AOC Accepted,BeingL-1 |
| 2 | L2₹14.4 LRejected-Finance | ₹14.4 L | L2 | Rejected-Finance Rejected,BeingL-2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Being Non Responsive |
| 4 | Rejected-Technical C 691 PATEL NAGAR RAJENDRA NAGAR BAREILLY | - | - | Rejected-Technical Being Non Responsive |
| Sl No | Description | Qty | Unit | FEROZ KHAN CONRACTOR L1 | RAHUL KUMAR MOURYA L2 |
|---|---|---|---|---|---|
| 1.00 | V.R.B. & Fall bridge clearance including labour, materials and T & P etc as directed by Engineer-in-Charge for proper completion of work . | 1 | No. | 1,150 ₹1,150 | 1,200 ₹1,200 |
| 2.00 | M-150 Brick work in 1:4 cement and sand mortar including all Lifts and all leads of materials including cost of all labour,material and T & P etc as directed by Engineer-in-Charge for proper completion of work . | 1.19 | M3 | 5,950 ₹7,080.50 | 6,000 ₹7,140 |
| 3.00 | Cement Pointing in 1:2 (Struck deep) on Brick masonary with cement and sand mortar including cost of all labour,material and T & P etc as directed by Engineer-in-Charge for proper completion of work . | 23.82 | M2 | 155 ₹3,692.10 | 160 ₹3,811.20 |
| 4.00 | Centering & Shuttering for R.C.C work with cost of centering & Shuttering at all heights including cost of all materias, labour, T&P etc as directed by Engineer-in-Charge for proper completion of work. | 22.48 | M2 | 905 ₹20,344.40 | 925 ₹20,794 |
| 5.00 | R.C.C works 1:1:2 with cement coarse sand, shingle including all cost of material labour, T&P etc. but excluding cost of centering, shuttering and reinforcement reqired for proper completion of work or as directed by Engineer-in-Charge. | 6.07 | M3 | 7,750 ₹47,042.50 | 7,800 ₹47,346 |
| 6.00 | Tor steel reinforcement i/c. its cutting, bending, placing in position, binding with cost of all materials,labour, T&P etc. required for proper completion of work or as directed by Engineer-in-charge . | 0.47 | MT | 82,800 ₹38,916 | 83,000 ₹39,010 |
| 7.00 | Laying Cement Concrete 1:2:4 Including all cost of material, labour, T&P etc. complete for proper completion of work or as directed by Engineer-in-Charge. | 38.25 | M3 | 6,250 ₹2.4 L | 6,300 ₹2.4 L |
| 8.00 | Replacing of musical note type side rubber seal as per IS code 11855 by removing old damaged side rubber seal from gate,scraping & cleaning surface, making holes feding and clamping the M.S plate by new counters sunk head hightensile bolts, nuts and washer, making adjustment as per requirement of site including cost of all material labour and T&p required for proper completion of work or as directed by Engineer-in-Charge. | 12 | RM | 3,450 ₹41,400 | 3,500 ₹42,000 |
| 9.00 | Replacing of bottom rubber seal as per IS code 11855 by removing old damaged side rubber seal from gate, scraping & cleaning surface, making holes, fixing and clamping the M.S plate by new counters sunk head high tensile bolts, nuts andwasher, making adjustment as per requirement of site including cost of all material, labour and T&p required for proper completion of work as directed by Engineer-in-Charge. | 9.9 | RM | 3,250 ₹32,175 | 3,300 ₹32,670 |
| 10.00 | Greasing oiling of component of lifting mechanism of gates(excluding rollers) after proper cleaning with replacing Grease cup/Grease Nipple as required including cost of all material, labour and T&P etc. required proper completion of work or as directed by Engineer-in-Charge. | 5 | Job | 5,600 ₹28,000 | 5,800 ₹29,000 |
Tender Value
₹15.1 L
EMD Value
₹32,000
Closing Date
12 Jan 2026, 11:00 amClosed
Executive Engineer ,Head works Division, Sarda can
Executive Engineer, Head works Division, Sarda canal Bareilly.
Sharda Mukhya Nahar ke Km.17.808 per Sthit inlate ke U/S Drain kee Safai v surkshatmak Karya.
2026_UPIDC_1103231_1
E-Tender Notice No 06/EE/2025-26
Open Tender
Civil Works - Canal
30 days
Banbasa
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹32,000
Yes
3 Feb 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
V.R.B. & Fall bridge clearance including labour, materials and T & P etc as directed by Engineer-in-Charge for proper completion of work .
M-150 Brick work in 1:4 cement and sand mortar including all Lifts and all leads of materials including cost of all labour,material and T & P etc as directed by Engineer-in-Charge for proper completion of work .
Cement Pointing in 1:2 (Struck deep) on Brick masonary with cement and sand mortar including cost of all labour,material and T & P etc as directed by Engineer-in-Charge for proper completion of work .
Centering & Shuttering for R.C.C work with cost of centering & Shuttering at all heights including cost of all materias, labour, T&P etc as directed by Engineer-in-Charge for proper completion of work.
R.C.C works 1:1:2 with cement coarse sand, shingle including all cost of material labour, T&P etc. but excluding cost of centering, shuttering and reinforcement reqired for proper completion of work or as directed by Engineer-in-Charge.
Tor steel reinforcement i/c. its cutting, bending, placing in position, binding with cost of all materials,labour, T&P etc. required for proper completion of work or as directed by Engineer-in-charge .
Laying Cement Concrete 1:2:4 Including all cost of material, labour, T&P etc. complete for proper completion of work or as directed by Engineer-in-Charge.
Replacing of musical note type side rubber seal as per IS code 11855 by removing old damaged side rubber seal from gate,scraping & cleaning surface, making holes feding and clamping the M.S plate by new counters sunk head hightensile bolts, nuts and washer, making adjustment as per requirement of site including cost of all material labour and T&p required for proper completion of work or as directed by Engineer-in-Charge.
Replacing of bottom rubber seal as per IS code 11855 by removing old damaged side rubber seal from gate, scraping & cleaning surface, making holes, fixing and clamping the M.S plate by new counters sunk head high tensile bolts, nuts andwasher, making adjustment as per requirement of site including cost of all material, labour and T&p required for proper completion of work as directed by Engineer-in-Charge.
Greasing oiling of component of lifting mechanism of gates(excluding rollers) after proper cleaning with replacing Grease cup/Grease Nipple as required including cost of all material, labour and T&P etc. required proper completion of work or as directed by Engineer-in-Charge.
Finishing walls with Acrylic Smooth exterior paint of required shade Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface as required including cost of all material, labour and T&P etc. required proper completion of work as directed by Engineer-in-Charge.
Painting of gates and appurtenances by applying 1 coat of red oxide zinc chromate primer and 2 coat of high build black bituminous paint of standard make after proper cleaning , scrapping the surface including cost of material, all material, labour T&P and scaffolding bridges with proper safety arrangement as required for proper completion of work as directed by Engineer-in-Charge.
Painting of superstructure of gate by applying I coat of red oxide zinc chromate primer and 2 coat of high glass synthetic enamel phiroza blue paint of standard make after propercleaning, scarping the surface including cost of all material,labour T&P and scaffolding bridges with proper safety arrangement as required for proper completion of work as directed by Engineer-in-Charge.
Earth work in cutting or in embankment in ordinary soil,excavation to be in the form of regular pits and earth work inembankment to be in 20cm. layers, including ramming anddressing the surface to the required levels and slopes and also including all lifts and all leads. The earth from cutting to be used in making embankment or to be deposited as spoil bank at distance as directed by Engineer- in-Charge for proper completion of work.
Supplying and Laying hand packed boulder 20 to 40 kg wt. in mechnanically woven double twisted hexagond shaped wire mesh gabion box/ create of size 3.0 x 1.5 x 1.0 m. mesh size 10 cm x 12 cm. with 10 S.W.G. G.I. Wire. Including all cost of material, labour and T&P, all lead & lift, required for proper completion of work as directed by Engineer-in-Charge.
Painting D.R.B./V.R.B. parapets for Chainage writing including cost of labour,material and T & P etc as directed by Engineer-in-Charge for proper completion of work .
Printing letter on D.R.B./V.R.B. parapets including cost of labour,material and T & P etc as directed by Engineer-in-Charge for proper completion of work .
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_2034516.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid