| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-Finance | ₹8.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹9.6 LRejected-Finance | ₹9.6 L | L2 | Rejected-Finance L2 |
| 3 | L3₹10.5 LRejected-Finance | ₹10.5 L | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | JAGDESH PRASAD L2 | M/S SHREE JEE CONSTRUCTIONS L1 | M/S ARYA CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T&P leads and lift etc complete. | 286.16 | CUM | 58 ₹16,597.34 | 50 ₹14,308.05 | 62 ₹17,741.98 |
| 2.00 | Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 28.17 | CUM | 4,626 ₹1.3 L | 4,000 ₹1.1 L | 5,000 ₹1.4 L |
| 3.00 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour, T&P, all lifts and leads etc. for proper completion of work. | 3.47 | CUM | 4,674 ₹16,204.76 | 5,000 ₹17,335 | 5,150 ₹17,855.05 |
| 4.00 | Providing and laying lean concrete (1:4:8) cement concrete including cost of all material labour and T&P all lift and leads etc. complete | 30.21 | CUM | 4,392.5 ₹1.3 L | 3,000 ₹90,633 | 4,850 ₹1.5 L |
| 5.00 | Providing and laying M-15 C.C. (1:2:4) cement concrete including cost of all material labour and T&P all lift and leads etc. complete | 67.71 | CUM | 5,023 ₹3.4 L | 4,500 ₹3.0 L | 5,500 ₹3.7 L |
| 6.00 | Providing and laying M-20 C.C. (1:1.5:3) cement concrete including cost of all material labour and T&P all lift and leads etc. complete | 32.99 | CUM | 5,889 ₹1.9 L | 6,500 ₹2.1 L | 6,400 ₹2.1 L |
| 7.00 | Providing and laying C.C. M-25 (1:1:2) cement concrete including cost of all material labour and T&P all lift and leads etc. complete | 1.29 | CUM | 6,359 ₹8,203.11 | 7,000 ₹9,030 | 7,000 ₹9,030 |
| 8.00 | Providing and fixing Centering & shuttering including cost of all material labour, T&P, all lifts and leads, etc for proper completion of work for C.C. Works | 221.5 | SQM | 417 ₹92,366.33 | 400 ₹88,600.80 | 450 ₹99,675.90 |
| 9.00 | Providing and fixing of 100 mm Dia PVC Pipe in proper position for drainage Sqouts including cost all labour, T&P material etc. complete as per direction of Engineer-in-Charge. | 8.36 | RM | 120 ₹1,003.20 | 100 ₹836 | 125 ₹1,045 |
| 10.00 | Providing and Laying 12 mm Thick Plaster in 1:4 Cement mortor including cost of all material, labour, T&P, Curing etc. complete for proper completion of work. | 5.15 | SQM | 122 ₹628.54 | 100 ₹515.20 | 125 ₹644 |
Tender Value
Refer Docs
EMD Value
₹22,000
Closing Date
22 Jan 2026, 5:00 pmClosed
EE M G C C Div 8 Bulandshahr
EE M G C C Div 8 Bulandshahr
Retender Lot 3 Const. of Fall at Km. 5.800 of Tail Dy.
2025_UPIDC_1090465_23
02/EE/2025-26
Open Tender
Civil Works - Canal
120 days
SAMBHAL
2 documents required · 2 mandatory
₹856
₹22,000
Yes
30 Jan 2026
17 Jan 2026
24 Jan 2026
17 Jan 2026
22 Jan 2026
17 Jan 2026
17 Jan 2026 - 22 Jan 2026
Earth work in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T&P leads and lift etc complete.
Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour, T&P, all lifts and leads etc. for proper completion of work.
Providing and laying lean concrete (1:4:8) cement concrete including cost of all material labour and T&P all lift and leads etc. complete
Providing and laying M-15 C.C. (1:2:4) cement concrete including cost of all material labour and T&P all lift and leads etc. complete
Providing and laying M-20 C.C. (1:1.5:3) cement concrete including cost of all material labour and T&P all lift and leads etc. complete
Providing and laying C.C. M-25 (1:1:2) cement concrete including cost of all material labour and T&P all lift and leads etc. complete
Providing and fixing Centering & shuttering including cost of all material labour, T&P, all lifts and leads, etc for proper completion of work for C.C. Works
Providing and fixing of 100 mm Dia PVC Pipe in proper position for drainage Sqouts including cost all labour, T&P material etc. complete as per direction of Engineer-in-Charge.
Providing and Laying 12 mm Thick Plaster in 1:4 Cement mortor including cost of all material, labour, T&P, Curing etc. complete for proper completion of work.
Providing dry brick Pitching including cost of all material, labour, T&P, all lifts and leads etc. complete.
Earth work in Filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also including all lift and Lead upto distance including 1 Km cost of all Labour T&P etc complete as directed by Engineer-in-charge
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.89 MB
Lot3.pdf
Tender Documents • 7.83 MB
BOQ_2042164.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid